Presentation is loading. Please wait.

Presentation is loading. Please wait.

IEC Electrical simulation models for wind power generation

Similar presentations


Presentation on theme: "IEC Electrical simulation models for wind power generation"— Presentation transcript:

1 IEC 61400-27 Electrical simulation models for wind power generation
Poul Sørensen Risø DTU Roskilde Denmark

2 Outline of this presentation
Scope Participants and meetings Status Timeline TC88 meeting Boulder March 2010

3 Scope of IEC Define standard dynamic simulation model for wind power Application: Power system and grid stability analysis Applicable for dynamic simulations of Short circuits (fault ride through) Loss of generation or load System separation 2 parts Wind turbines Wind farms TC88 meeting Boulder March 2010

4 Scope of IEC 61400-27 – part 1 Wind turbine modelling must define:
Generic dynamic models for topologies / concepts on market Methodology to create models for new concepts Model parameters Models refer to wind turbine connection terminal Independence on simulation tool To outmost degree With clear definition of interface to simulation tool Validation Shall include tests according to IEC Response to voltage dips Set point requests TC88 meeting Boulder March 2010

5 Scope of IEC 61400-27 – part 2 Wind turbine modelling must define:
Generic dynamic models for topologies / concepts on market Auxiliary equipment Wind farm control Methodology to create models for new concepts Models refer to wind farm point of common coupling Independence on simulation tool To outmost degree With clear definition of interface to simulation tool Validation TC88 meeting Boulder March 2010

6 IEC TC88 NWIP – Votes TC88 meeting Boulder March 2010

7 Members WG27 has now 33 members from 14 countries. Wind power vendors,
Sub suppliers, Consultants, Certification, Research and University Grid operators Transmission System Operator (TSO) Distribution System Operator (DSO). TC88 meeting Boulder March 2010

8 Complete members list of WG 27
Michael Ebnicher, Bachmann electronic GmbH (AT) Jens Fortmann, REpower Systems AG (DE) Frank Fischer, PowerWind GmbH (DE) Frank Martin, Germanischer Lloyd Industrial Services GmbH (DE) Jeferson Marques, Enercon (DE) Vladislav Akhmatov, Siemens Wind Power (DK) Björn Andresen, Siemens Wind Power (DK) Poul Sørensen, Risø DTU (DK) Knud Johansen, Energinet.dk (DK) Bo Hesselbæk, Vestas Wind Systems A/S (DK) Montserrat Mata, ECOTÈCMOA / ALSTOM (ES) Emilio Gómez Lázaro, UCLM Research Institute (ES) Alberto Molina Martín, ENERGY TO QUALITY S.L. (ES) Javier Pérez-Jacoiste, Gamesa (ES) J. Manuel Rodrigo, EDP Renovaveis (ES) Jouko Niranen, ABB (FI) Slavomir Seman, ABB (FI) Jerome Duval, EDF R&D (FR) Graeme Bathurst, TNEI Services Ltd (GB) Junji Kondo, AIST (JP) Kazuo Shibata, Japan Electrical Manufacturers' Association (JP) Hee-Sang Ko, Samsung Heavy Industries (KO) Seung-Ho Song, Kwangwoon University (KO) Edwin Wiggelinkhuizen, ECN Wind Energy (NL) Jarle Eek, SINTEF Energiforskning (NO) Larisa Vladimirovna Varigina, RusHydro (RU) Åke Larsson, Vattenfall (SE) Yuriy Kazachkov, Siemens PTI (US) Pouyan Pourbeik, Electric Power Research Institute (US) Abraham Ellis, Sandia National Laboratories (US) Nicholas Miller, GE Energy (US) Eduard Muljadi, National Renewable Energy Laboratory (US) Robert M Zavadil, EnerNex (US) TC88 meeting Boulder March 2010

9 Meetings Meetings held:
1st WG meeting Roskilde, Denmark 6-7 October 2009 2nd WG meeting Barcelona, Spain January 2010 Planned meetings 3rd WG meeting New Orleans, USA, April 2010 4th WG meeting Helsinki, Finland, 31. August – 1 September 2010 TC88 meeting Boulder March 2010

10 Status Focus document Responds and agrees to secretariat observation ”the initial task of the project team shall be focussed on clear broader definition of the outline to establish consensus providing sound basis for their work” Drafted between 1st and 2nd meeting and discussed on 2nd meeting First priority of WG27 is to perpare Focus document specifying in more details: Applicability and limits of models and validation procedures Requirements to models and validation procedures 1st working draft now under preparation for 3rd meeting discussion, it will include: Introduction Definitions and references Applicability and limitations Verification first draft TC88 meeting Boulder March 2010

11 Timeline TC88 meeting Boulder March 2010


Download ppt "IEC Electrical simulation models for wind power generation"

Similar presentations


Ads by Google