2G BBULBE PASS Instructions-4 Replacement of bubble generator.

Similar presentations


Presentation on theme: "2G BBULBE PASS Instructions-4 Replacement of bubble generator."— Presentation transcript:

1 2G BBULBE PASS Instructions-4 Replacement of bubble generator

2 Bubble generator

3 Instructions 1. Take off water inlet and outlet fittings 2. Deflate spa 3. Remove cord grip with screwdriver 4. Remove the air pipe

4 5. Take out control box from spa pool 6. Remove the foam 7. Loosen the screws on the top lid 8. Remove the top lid Instructions

5 Bubble Power input Transformer input Heater Filter Transformer output 3 PIN- water switch 2 PIN - Sensor Instructions

6 9. Disconnect the wires 10. SPA power panel 11. Remove the middle part of control box hull 12. Remove the top lid of bubble generator Instructions

7 13. Replace the bubble generator 14. L/N wires should be separated 15. Screw back the top lid of bubble generator 16. 2 seal rings should be in good shape Instructions

8 17. Assembly the middle part of control box hull 18. Connect the wires 19. Put on the top lid back20. Put on the foam Instructions

9 21. Assembly the control box 22. Pull out the air pipe through spa tub 23. Connect the check valve with spa tub 24. Screw back water inlet and outlet tightly Instructions