Presentation is loading. Please wait.

Presentation is loading. Please wait.

1 Cybersecurity and Communications Reliability Division – Public Safety & Homeland Security Bureau John Healy December 2014.

Similar presentations


Presentation on theme: "1 Cybersecurity and Communications Reliability Division – Public Safety & Homeland Security Bureau John Healy December 2014."— Presentation transcript:

1 1 Cybersecurity and Communications Reliability Division – Public Safety & Homeland Security Bureau John Healy December 2014

2 2

3  Took average of January 2011 through December 2011 as the standard 3

4 4 See ATIS-0100021 Analysis of FCC-Reportable Service Outage Data for a description of the method used to calculate the outage index.

5 5 Procedural events are ones which have a procedural root cause.  Many of these events are related to Planned Maintenance.  The NRSC agreed to set up a team to review planned maintenance outages.  In June we sent data on these events from the NRSC companies.

6 6

7 7

8 The NRSC agreed to set up a team to review these events with a report by December, 2014. 8

9 9

10 10

11 11

12 12

13 13

14 14 Wireline outages are all outages for which the Reason Reportable was at least 900,000 wireline user-minutes.

15 15

16 16

17 17

18 18

19 19

20 20

21 21

22 22

23 23

24 24

25 25

26 26

27 27 Non-DS3-Simplex Outages Data from 1/12 thru 9/14 Conclusion: Non DS3- Simplex Outages are unchanged in duration from 1/12 to 9/14 DS3-Simplex Events Only Data from 1/12 thru 9/14 Conclusion: DS3-Simplex Events are unchanged in duration from 1/12 to 9/14 Rank Correlation of duration with date is -.004 and is not significant Rank Correlation of duration with date is.011 and is not significant

28  Changes to NORS/DIRS: Added ability to send text messages when DIRS is activated. Comments and suggestions are greatly appreciated 28

29 Current Teams  Best Practices Team  Outage Reporting Advisory Team  Improvements to the NORS System  Improvements to the template  Recommended ways to communicate information  Improvements to NORS/DIRS manuals  Fiber Cut Team  IP Transition Team  Planned Maintenance Team: Examine planned maintenance events; recommend ways to upgrade the system without affecting service 29


Download ppt "1 Cybersecurity and Communications Reliability Division – Public Safety & Homeland Security Bureau John Healy December 2014."

Similar presentations


Ads by Google