Presentation is loading. Please wait.

Presentation is loading. Please wait.

CANAAN ENGINEERING PVT LTD RETUBING OF HELITOWER / IOCL - BGR.

Similar presentations


Presentation on theme: "CANAAN ENGINEERING PVT LTD RETUBING OF HELITOWER / IOCL - BGR."— Presentation transcript:

1 CANAAN ENGINEERING PVT LTD RETUBING OF HELITOWER / IOCL - BGR

2 PROJECT :RETUBING OF HELITOWER PO. NO : 24336842 WO. NO : 1188 WEIGHT (EMPTY) : 120 Ton CUSTOMER/OWNER : BONGAIGAON REFINERY & PETROCHEMICALS LIMITED CUSTOMER’S PROJECT : RETUBING OF HELITOWER AT CRU – MSQ IN IOCL-BGR. INSPECTION BY :IOCL-BGR. MANUFACUTRED AT:SITE : BRCL,DHALIGAON, ASSAM RETUBING OF HELITOWER / IOCL - BGR CANAAN ENGINEERING PVT LTD

3 RETUBING OF HELITOWER / IOCL - BGR CORRODED TUBES - OLD HELITOWER

4 CANAAN ENGINEERING PVT LTD RETUBING OF HELITOWER / IOCL - BGR BLOCKED TUBES - OLD HELITOWER

5 CANAAN ENGINEERING PVT LTD RETUBING OF HELITOWER / IOCL - BGR SKELETON ASSEMBLY OF HELITOWER AFTER REMOVAL OF TUBES

6 CANAAN ENGINEERING PVT LTD RETUBING OF HELITOWER / IOCL - BGR SKELETON ASSEMBLY OF HELITOWER AFTER CLEANING

7 CANAAN ENGINEERING PVT LTD RETUBING OF HELITOWER / IOCL - BGR TUBE SHEET OF HELITOWER AFTER REMOVAL OF TUBES

8 CANAAN ENGINEERING PVT LTD RETUBING OF HELITOWER / IOCL - BGR TUBE BUNDLE ASSEMBLY OF HELITOWER

9 CANAAN ENGINEERING PVT LTD RETUBING OF HELITOWER / IOCL - BGR TUBE BUNDLE ASSEMBLY OF HELITOWER AFTER FINAL TUBING

10 CANAAN ENGINEERING PVT LTD RETUBING OF HELITOWER / IOCL - BGR REAR TUBE SHEET OF HELITOWER AFTER FINAL WELD

11 CANAAN ENGINEERING PVT LTD RETUBING OF HELITOWER / IOCL - BGR FINAL ASSEMBLY OF TUBE BUNDLE HELITOWER


Download ppt "CANAAN ENGINEERING PVT LTD RETUBING OF HELITOWER / IOCL - BGR."

Similar presentations


Ads by Google