Presentation is loading. Please wait.

Presentation is loading. Please wait.

Proven performers, good neighbors 1 Doing Business with Bechtel Parsons Blue Grass September 26, 2007 Diane Osbourne Small Business Advocate.

Similar presentations


Presentation on theme: "Proven performers, good neighbors 1 Doing Business with Bechtel Parsons Blue Grass September 26, 2007 Diane Osbourne Small Business Advocate."— Presentation transcript:

1 Proven performers, good neighbors 1 Doing Business with Bechtel Parsons Blue Grass September 26, 2007 Diane Osbourne Small Business Advocate

2 Proven performers, good neighbors 2 Introductions & Safety Topic  Safety Topic  Introductions –Evan Carlson, Field Procurement Manager –Gary Cough, Construction Manager –Dave DuRegger, Subcontracts Manager –Denise Hart, Procurement Manager

3 Proven performers, good neighbors 3 Richmond, KY Current Project Staffing  Bechtel Parsons Blue Grass Team currently employs personnel located as follows: –Richmond, KY: 60 (18 local hires) –Jobsite: 27 –Pasadena, CA; Pasco, WA; Columbus, OH and San Diego, CA: 317  Subcontractor and Direct Hire construction workers on site: 45 - 50 each day and growing Jobsite

4 Proven performers, good neighbors 4 Construction Work nearing completion  Access road 99% complete except for guard rail work  Roadway Concrete/ACB Potable Water & Sewer (100% complete)  Perimeter Fencing (100% complete)  ACB Electrical Power and Roadway (58% complete)  Access Control Building (81%)  Active Security Vehicle Barrier (84%)

5 Proven performers, good neighbors 5 Construction Near-Term Work  Subcontracts –Badging Facility  Subcontract awarded on July 29, 2007 –Personnel Support Building  Subcontract awarded on June 23, 2007 –Maintenance Building  Subcontract awarded on June 25, 2007 –Access Control Building Canopy  Currently bidding  Underground Material –Purchase Orders have been awarded and the majority of the material has been received on site for:  Storm Drainage, Sanitary Sewer  Electrical Ductbanks/Lighting/Grounding  Fire Protection and Process Water Piping

6 Proven performers, good neighbors 6 Construction Future Work  138 KVa Main Power Substation & Pole Line – Subcontract Awarded on July 26, 2007  MDB Horizontal Concrete Material (Rebar/Embeds/Formwork)*  Permanent Plant Equipment * Contingent upon receipt of an authorizing Notice to Proceed from the Government to perform the work

7 Proven performers, good neighbors 7 Acquisitions As of 30 August 2007: 94.9% ConstructionProject Total Total Awards$37,654,294$42,295,455 Awards to Local Businesses $23,567,31263%$23,958,07557% Kentucky Businesses Outside Local Area $1,627,9614%$1,714,4264% Businesses Outside Kentucky $12,459,02133%$16,622,95439% Total Awards to Kentucky Businesses $25,195,27367%$25,672,50161%

8 Proven performers, good neighbors 8 Bechtel Supplier and Contractor Portal  All interested companies are required to register on the Bechtel Supplier and Contractor Portal- http://supplier.bechtel.com –Dunn and Bradstreet Number –Bonding capacity, bid range –Annual sales –Area of expertise, work experience –Business size classification  Information is utilized to assess interested company’s capability  You may also e-mail a letter of introduction & company capabilities to the Project Small Business Advocate

9 Proven performers, good neighbors 9 Bechtel Supplier and Contractor Portal

10 Proven performers, good neighbors 10 Prequalification Process  Most RFP Opportunities will be posted on the project website under Suppliers/Subcontractors/Opportunities: http://www.bechtelparsonsbgcapp.com http://www.bechtelparsonsbgcapp.com  Prequalification requirements will be listed on the description for the scope of work  All project RFP’s are Invitation to Bid Only. A completion of prequalification process does not guarantee participation in any RFP.  Submit interest and prequalification documents utilizing the e-mail tool (bgbuyer@bechtel.com) by clicking the envelope icon

11 Proven performers, good neighbors 11 BGCAPP Project Website

12 Proven performers, good neighbors 12 Prequalification Process  Prequalification for Materials and Fabricated Equipment –Work History –Manufacturer Agreements –Certifications-ASME, ISO 9000, Class of Code Stamp –Quality Program –Shop Capacity –Financial Capability –Schedule –References  Prequalification for Subcontracts and Services –Work History –Safety, Experience Modification Rate, OSHA 300 logs –Quality Program –Financial Capability- Bonding & Insurance –Teaming Partners –References

13 Proven performers, good neighbors 13 Small Business  Bechtel Parsons Blue Grass (BPBG) is committed to providing meaningful roles for small, small disadvantaged, HUBZone, women-owned, veteran- owned and service disabled veteran-owned businesses  Am I a small business? http://www.sba.gov/size/indextableofsize.html http://www.sba.gov  BPBG strongly encourages partnerships between small businesses and small and large businesses  Identify the role of each partner in your plan  Submit prequalification documents for each partner

14 Proven performers, good neighbors 14 Contact Information Diane Osbourne Small Business Program Advocate 301 Highland Park Dr. Richmond, KY 40475 (859) 624-6204 dosbourn@bechtel.com


Download ppt "Proven performers, good neighbors 1 Doing Business with Bechtel Parsons Blue Grass September 26, 2007 Diane Osbourne Small Business Advocate."

Similar presentations


Ads by Google