Presentation is loading. Please wait.

Presentation is loading. Please wait.

Maximizing Your Productivity. Plant Cost Depreciation Maintenance Labor Drying Asphalt Heating Electric Power Material loss Loader Aggregate Asphalt.

Similar presentations


Presentation on theme: "Maximizing Your Productivity. Plant Cost Depreciation Maintenance Labor Drying Asphalt Heating Electric Power Material loss Loader Aggregate Asphalt."— Presentation transcript:

1 Maximizing Your Productivity

2

3 Plant Cost Depreciation Maintenance Labor Drying Asphalt Heating Electric Power Material loss Loader Aggregate Asphalt

4 Processing Cost Depreciation Maintenance Labor Drying Asphalt Heating Electric Power Material loss Loader

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24 Cost of Paving – 60,000 ft. 2, 6” thick = $ 30.00 / ton 2,000 tons x $ 30.00 = $ 60,000.00 Based – 200,000 tons / year; $ 1.50 / gal. of fuel Fuel Savings 0.59 gal. / ton 200,000 tons x 0.59 gal. / ton x $ 1.50 / gal. = $ 177,000.00 per year ROI ~ 4.4 months =

25

26

27

28

29

30

31

32

33 – Light oils are either put in asphalt or left in asphalt during refining – These light oils boil at above 285 o F – By mixing at below 285 o F, the boiling point is never reached…eliminating smoke (vapor) and corresponding smell No Smoke – No Smell…Why?

34

35

36

37

38

39

40

41

42

43

44 Processing Cost Depreciation Maintenance Labor Drying Asphalt Heating Electric Power Material loss Loader

45

46

47

48

49

50

51

52 Processing Cost Depreciation Maintenance Labor Drying Asphalt Heating Electric Power Material loss Loader

53

54

55 Processing Cost Depreciation Maintenance Labor Drying Asphalt Heating Electric Power Material loss Loader

56 BID: $5,000,000. OO Aggregate$ 15. 00 AC @ 600. 00 x 0.55 33. 00 $ 48. 00 Plant Cost$ 10. 00 Trucking 4. 00 Laydown 3. 00 $ 17. 00 Overhead & Profit 6. 00 23. 00 $ 71. 00 Price / ton Tons = $5,000,000. 00 = 70,422 tons $ 71. 00 Agg. tons = 66,549 tons

57 Milling……………$ 3. 00 / ton Trucking………… 3. 00 / ton Processing……... 3. 00 / ton $ 9. 00 / ton Tons = $5,000,000. 00 = 97,087 + 38% 0.5(48. 00 ) + 0.5(9. 00 ) + 23. 00 When paying 50% of the value of RAP less Milling, Trucking and Processing Cost Plus 48,543 tons at $9. 00 / ton cost of RAP left over to use in other mix Tons of stone used 45,873 If RAP is used at 50% on other jobs and an additional 45,873 tons of stone will be used…Total stone used 91,946 tons

58

59 PROCESSED RAP SCREENED TO ORIGINAL INGREDIENTS RAP Black Rock 1/2 x 0 AA% Black Rock 1/2 - 3/8 DD% Black Rock 3/8 - 4 CC% Black Rock 4 - 0 BB%

60

61

62

63

64 Black Rock 4-0 Black Rock 1/2 - 3/8 Black Rock 3/8 - 4 White Rock 4-0 White Rock 3/8 - 4 White Rock 1/2 - 3/8 BB% DD% CC% B% C% X%

65 White Rock 4-0 White Rock 3/8 - 4 White Rock 1/2 - 3/8 Black Rock 3/8 - 4 Black Rock 1/2 - 3/8 Black Rock 4-0 B% C% BB% X%

66 Plant Cost Depreciation Maintenance Labor Drying Asphalt Heating Electric Power Material loss Loader Aggregate Asphalt

67


Download ppt "Maximizing Your Productivity. Plant Cost Depreciation Maintenance Labor Drying Asphalt Heating Electric Power Material loss Loader Aggregate Asphalt."

Similar presentations


Ads by Google