September, 2012 Md. Mahbub Sarwar General Manager Production & Marketing Division Bangladesh Oil, and and Mineral Corporation (Petrobangla)

Similar presentations


Presentation on theme: "September, 2012 Md. Mahbub Sarwar General Manager Production & Marketing Division Bangladesh Oil, and and Mineral Corporation (Petrobangla)"— Presentation transcript:

1 September, 2012 Md. Mahbub Sarwar General Manager Production & Marketing Division Bangladesh Oil, and and Mineral Corporation (Petrobangla) International Workshop on Energy Statistics Sep, 2012 Beijing, China Collection and Compilation of Data on Gas Production and Consumption in Bangladesh Bangladesh

2 Primary Energy Scenario 2011 Primary Energy Commercial -65% Biomass – 35% Share of Commercial Energy (Total =23.4 MTOE)

3 Total Gas Fields25 Producing Gas Fields19 Producing Gas Wells84 Daily Gas Production2260 MMscfd Total Gas Reserve ( Proven + Provable ) TCF Gas Production Since inception (upto June 2012) TCF Remaining Reserve ( Proven + Provable ) TCF Current Gas Demand MMscfd Daily Gas Shortfall240+ MMscfd Gas Customers2.35 Millions Gas Sector at a Glance

4 CATEGORY WISE GAS CONSUMPTION FY

5 Electricity Generation by Fuel Type Generation ( Yr ) : 35,073 GWh

6 Historical Gas Production FY: ~ Total Production: Tcf up to June’2012 GAS PRODUCTION SINCE INCEPTION

7

8

9 Energy & Mineral Resources Division Sylhet Gas Fields Ltd. Bangladesh Petroleum Expl. & Prod. Co. Ltd. Bangladesh Gas Fields Co. Ltd. Barapukuria Coal Mining Co. Ltd. Rupantarita Prakritic Gas Co. Ltd. Titas Gas T & D Co. Ltd. Gas Transmission Co. Ltd. Pashchimancha l Gas Co. Ltd. Jalalabad Gas T & D System Ltd. Bakhrabad Gas Distribution Co. Ltd. Maddhyapara Granite Mining Co. Ltd PETROBANGLA Production Mining CNG & LPG Distribution Exploration & Production Transmission Karnaphuly Gas Distribution Co. Ltd. Sundarban Gas Co. Ltd.

10 PETROBANGLA CHEVRONSANTOSTULLOW NIKO CONOCO PHILIPS INTERNATIONA OIL COMPANY OPERATING UNDER PETROBANGLA

11 NATURAL GAS DATA COLLECTION & COMPILATION

12 : Daily Gas & Condensate Production Daily gas Consumption - Power plant-wise - Fertilizer Factory-wise - Non- Bulk Periodical Data Compilation : MIS Report - Monthly & Yearly Production & Consumption of Gas, Condensate & Products, Revenue, Customer Base, Pipeline, Statistics of new Connection, UFG, Activities on Environment & Safety Annual Report

13 DAILY DATA COLLECTION & COMPILATION A. PRODUCTION DATA Period − 24 Hours (8:00 hours of previous day to 8:00 hours day of reporting day Source −Producing Fields Compilation Procedure −Field personnel or Field Manager prepares 24 hours gas & condensate production report on the basis of production meter reading; sends to the company head office through wireless, phone, fax & by 9 am everyday. −Companies’ Data compilation centres send daily gas & production report to Production & Marketing Division, Petrobangla by 10-11am everyday through phone and . −Petrobangla compiles all production data field-wise under each company, calculates nationwide production, circulates the to the higher authorities and uploads it at the Perobanlga website (www.petrobangla,org.bd/. Units Gas Production in MMSCFD and Condensate in BBLD

14 DAILY DATA COLLECTION & COMPILATION B. Consumption Data Period − 24 Hours (8:00 hours of previous day to 8:00 hours day of reporting day Source −Distribution companies Compilation Procedure −Company representatives records hourly gas consumption by individual power plants and fertilizer factories, they send these to the central data compilation unit (load dispatch centre) at the company head office. −Consumption figures for non-bulk sector (industry, captive power, domestic, CNG etc) are calculated on the basis of throughput at the CGS, TBS, and DRS etc. In charge of the these stations transmits these data to the load dispatch centre. −The load dispatch centre prepares a hourly log sheet everyday which contains details information on gas amount and pressure and calculates daily consumption.

15 DAILY DATA COLLECTION & COMPILATION −Load dispatch centre of the company sends daily consumption data to Production & Marketing Division, Petrobangla by 10-11am everyday through phone and . −Petrobangla compiles all consumption data customer category wise (power, fertilizer and non-bulk) under each company in the Daily Production and Consumption Report, calculates nationwide consumption, circulates the to the higher authorities and uploads it at the Perobanlga website (www.petrobangla,org.bd/. Units Gas Consumption in MMSCFD Daily Report

16 Management Information System (MIS) Report Procedure  Each Production as well as Distribution Company has an MIS department which is responsible for preparing a monthly MIS report for the company.  MIS report prepared by the company is circulated to company authorities, Petrobangla authorities and to the MIS department of Petrobangla.  On the basis of the MIS reports of the companies, MIS department of Petrobangla prepares central MIS report which contains nationwide gas, condensate, condensate products and sales data in addition to other technical and financial information.  MIS reports of the companies are uploaded at the respective company website while MIS report prepared by Petrobangla is uploaded at Petrobangla website (www. petrobangla.org.bd) Units :  Gas : MMSCM (Million standard cubic metre),  Condensate: Thousand litres

17 LIMITATIONS Measurement of Non-bulk small Customers such as Industrials, Commercial are often Inaccurate, because of Mechanical Meter. Almost all the Domestic Customers are Un- mettered, resulting in Inefficient Use.