Budget LAL Pixel 2012-2013 R&D Tracker Budget LAL Pixel 2012-2013 R&D Tracker A.Lounis, N. Dinu, V. Linhard, A. Bassalat*, Ali Harb, Evangelos-Leonidas.

Similar presentations


Presentation on theme: "Budget LAL Pixel 2012-2013 R&D Tracker Budget LAL Pixel 2012-2013 R&D Tracker A.Lounis, N. Dinu, V. Linhard, A. Bassalat*, Ali Harb, Evangelos-Leonidas."— Presentation transcript:

1 Budget LAL Pixel 2012-2013 R&D Tracker Budget LAL Pixel 2012-2013 R&D Tracker A.Lounis, N. Dinu, V. Linhard, A. Bassalat*, Ali Harb, Evangelos-Leonidas Gkougkousis, A. Falou* Gisèle Martin-Chassard, D. Thienpont, J. Tong Bong, B. Lachasinski Pôle OMEGA * Permanent at CERN (IBL construction)

2 Bilan-2012 R&D Pixel planaires 2012: 10 K€ VTT Edgless detectors (35 x200 um) Run sensors : received Oct 2012

3 Budget 2013 Test card Omegapix2/Edgless (VTT pixel) + Omegapix2/Slim Edge (Cis Pixel) 3 K€ Carte Front-End Omegapix2/Pixel Matrix 3D- ASIC Chartered Tezzaron Via CMP SENSOR tests 3K€ 65 nm electronics : Building block design March 2013 (LAL, LPNHE,LAPP, INFN, … CERN)  CERN financement 65 nm electronics : Building block design March 2013 (LAL, LPNHE,LAPP, INFN, … CERN)  CERN financement Asic 65 nm Test card 3K€

4 Test Card OMEGAPIX Test Card MemDyn Pôle OMEGA

5 R&D on TCAD and doping profile activities Synopsis TCAD 3D simulator 1500 € + 900 € (2 licences) Simulation TCAD : 2.4K€ Doping profile measurements using AFM method (Laboratoire IEF Orsay + CNRS MEUDON) AFM + SIMS : 3 K€

6 R&D developments ASIC Test cards and Front-End test cards 9K€ Planar Pixel sensor Edgless R&D, tests structures LAL, MPI, Dortmund, Glasgow 10 K€ 3D Simulator 2.5 K€ Doping profiles evaluation 2K€ Run Omegapix2 Dec 2012 ANR Vitesse (~75 K€) Inter-connexions ASIC + Pixel Matrix (20 K€) Inter-connexions Omegapix2 Dec 2013 ANR Vitesse (~XXK€) 43,5 K€

7 Futur developments on active edges EU request Duration: 3-4 years - 500 KEuro, mainly for 4-5 consecutive production runs at VTT comprising sensor productions and interconnection to the read-out chip. - 4 Ph.D. students EU request Duration: 3-4 years - 500 KEuro, mainly for 4-5 consecutive production runs at VTT comprising sensor productions and interconnection to the read-out chip. - 4 Ph.D. students Appel d’Offre CAPTINOV Plateforme Capteurs Innovants SESAME / region ILE DE FRANCE (LAL, LLR, CEA, ….) Physique des 2 infinis et Astrophysique P2IO 320 K€ Appel d’Offre CAPTINOV Plateforme Capteurs Innovants SESAME / region ILE DE FRANCE (LAL, LLR, CEA, ….) Physique des 2 infinis et Astrophysique P2IO 320 K€