0 ERP Project Kick Off Jakarta 10 June 2013

1 There is no I in TEAM

2 The kick-off meeting is the official start for ERP Project
It establishes the priorities, tone, and energy for the project and helps to get a common understanding on: Project scope Project approach Project schedule Project Team / Organization Support Required

3 Agenda Ganda ERP Project Scope & Benefit Project team
TIPTOP TIM and each milestone approach Project Plan (with Schedule) 1 2 3 4 3

4 Expectation from Top Management
Mr. Tony Liu 4

5 Agenda Ganda ERP Project Scope & Benefit Project team
TIPTOP TIM and each milestone approach Project Plan (with Schedule) 1 2 3 4 5

6 Why to start the project
Need to have integrated system Existing system doesn't support current business operation. Need to have a computerized system / a tool for Financial and Accounting and other supporting tools to assure company data consistency, integrity, correctness, real time & transparence to enable faster and better decision making Concern of future business growing

7 Project Goals To have Integrated Enterprise Resource Planning (IERP) system which include application modules to support our business process. To improve the efficiency and co-ordination among business units. To provide management with up-to-date information for better decision making To Improve on the internal control of the company To enhanced computerization of daily work from 40% up to 90% Improved automation and limit the manual data entry Input source data from the H/W devices (weighting scale, fingerprint…) automatically import for all of process and reports Provide reports at each unit of the business process timely To enable closing of monthly financial accounts on timely manner.

8 Scope of Implementation
WHI Chinfon Cement Corporation Vietnam AASTAR Gama Group PT Ganda Group PT SAG – KSO Semen Kupang PT Cemindo Gemilang WHI Cemindo Gemilang AASTAR Singapura Subsidiary Chinfon Cement PT NSD Cement Sole Distributor Bayah Cement Plant TPD Clinker Grinding Plant at Ciwandan TPY Cement PT ANP Transport Company Grinding Plant at Medan TPY Cement PT MM Ready Mix Concrete Company Grinding Plant at other (TBD) TPY Cement 8

9 Scope of Implement Modules

10 Customization Modules in Ganda Project
Item Estimate Man hours Phase Manufacturing of Production Daily reports KP+ CFC 500 Phase 1 Vehicle Management ( For Transportation Cost Management) Base on Ganda 300 HRM report ID 200/ VN 200 Automatic PLC Integration Base on CFC400 Tax reporting to Local Government Free of charge Packing Management (Truck & Belt Scale System) Base on CFC 200 CMMS System(Customization in Equipment Module) Base on CFC50 Electric Power System Base on CFC100 Phase 2 Telephone Management Base on CFC150 Library Management Canteen Meal Management GPS Integration 300 10

11 Agenda Ganda ERP Project Scope & Benefit Project team
TIPTOP TIM and each milestone approach Project Plan (with Schedule) 1 2 3 4 11

12 Purchasing & Inventory
Ganda IDN Project Leader Toto – Ganda Group Indonesia Ryan – Digiwin Project Manager Digiwin Consultant Finance & Acc = Consutant 1 (1 person) Mfg and Sales & Dist = Consultant 2 (1 person) HRM,= consultant 3 (1 person) BI = Consultan 4 (1 person) Easyflow = consultant 5 (1 person) System Analysis / Trainer = Consultant 6 ( 2 person) Note: Not include programmer that should working on Taiwan) Support Function Change & Communication : Toto Project Supporting: Damanhuri IT Technical Support Sunu Waskita (leader) Appilion .Digiwin System Engineer (1 person) Advance Feature: Business Inteligent; B2B PLC/Field Instrument Integration ERP Project Team (Full Time) Frans (Finance, Acc, Sales, Distribution, Mfg) Andi U Yani (Material Mgt HR, PM, System mgt) Arik Rifai * (Procurement, logistic, Warehousing) Hary (Junior Engineer) Damanhuri (system Programmer) * Member of Log & Support Division Accounting & Finance Process Owner: Ms Maria AASTAR Process Owner: Ms Jacqueline Human Resources Process Owner: Mr Wahyu Sales & Distribution Process Owner: Ms. Jacqueline Purchasing & Inventory Parts Process Owner: Mr Gary Manufacturing & CMMS Process Owner: Mr Wahyu. Mr Tatang Fleet Management Process Owner. Mr Sie Ngoh Project Management Process Owner: Mr Anang Key User Metta Simah Farida Jimmy Key User Shinty Sheila Key User Dian Akhwan** Key User Oza Sie Ngoh Key User Purwanto Key User Budi Tri Aswin Key User Sie Ngoh Etiene Key User Dadik SCOPE: GG, CG, NSD, ANP, SAG, MM SCOPE: AASTAR SCOPE: GG, CG, NSD, ANP, SAG, MM SCOPE: GG, CG, NSD, ANP, SAG, MM SCOPE: GG, CG, NSD, ANP, SAG, MM SCOPE: CG, SAG, MM SCOPE: ANP SCOPE: GG, CG ** = also responsible for end user training 12

13 Project Team Responsibilities
Role Responsibility Remark Project Leader Deliver the specified project deliverables on time in good quality and in accordance with the budget Achieve milestones on time Report on project progress Identified of potential bottleneck and initiate to propose the solution Coordinate & Assign tasks to project members Keep in touch with Consultant to ensure successfully the project and for knowledge transfer Full time IT Technical Support Providing IT infrastructure for implement ERP System To setup system requirement for ERP System Support user to operate this system Part time but ready if required Support Function To assist project team on Project administration, training and prepare new infrastructure (if needed) To coordinate change program impacted of ERP impl. system Project Administration task Full Time ERP Project Team (Full time) Leader on development defined modules To manage and coordinate project communication, training, socialization and prepare new infrastructure (if needed) Working together with consultant to determine business process flow that needed to ERP system requirement with consultation to process owner. Development of business process documentation (incl design standard form and report) with consultation to process owner or key user Conduct testing, data collection, data validate and data migration for new system configuration. To drive, coach and facilitate the implementation of new system Setup and organize documentation control system and records Working together with key user to Identify of end user, training requirements at their particular site. Process Owner Approved “to be” Business process procedures Owner of new system Decision-making for critical or controversial issue during the project. Monitoring the project progress and direction. Key User /Key Man Lead in managing the change in their unit areas Reviewing “to be” process flow Co-ordinate between Project and End User Support project team by share data, information, validate data by assign their relavant user (if required) Build knowledge of what new system will do Assist & Coord on end user training To assign the user to execute the entry of transaction To coordinate the use of system and process between organizations and departments in order to define the responsibilities. Part Time but ready on demand with advance notification

14 Chinfon VN Project Leader
Digiwin Consultant Finance & Acc = Consutant 1 (1 person) Mfg and Sales & Dist = Consultant 2 (1 person) HRM,= consultant 3 (1 person) BI = Consultan 4 (1 person) Easyflow = consultant 5 (1 person) System Analysis / Trainer = Consultant 6 ( 2 person) Note: Not include programmer who should working on Taiwan) T-038 Mr. Alex Hsu TBD – DIGIWIN PROJECT MANAGER Support Function Change & Communication : Alex Hsu Project Supporting: Richard Technical Support V1121 Le Quoc Tuan V1422 Nguyen Thu Hong .Digiwin System Engineer (1 person) ERP Project Team (Full Time) ERP Specialist Engineer Vacant (Suggest recruited from TW) ERP Technical Lead V1121 Le Quoc Tuan ERP Programmer 1. V1422 Nguyen Thu Hong Advance Feature: Business Inteligent; B2B, EasyFlow PLC/Field Instrument Integration Weight Scale/Belt Scale/Fingerprint Tele/Fuel station/SMS/Door access 14

15 Project Team Responsibilities
Role Responsibility Qualifications Remark Project Leader Deliver the specified project deliverables on time in good quality and in accordance with the budget Achieve milestones on time Report on project progress to the steering committee Identified of potential bottleneck and initiate to propose the solution Coordinate & Assign tasks to project members Keep in touch with Consultant to ensure successfully the project and for knowledge transfer Knowledge of business processes The ability to work effectively with all levels within Organization Project Management Expertise Have good understanding of project scope & constraint. Time management skills and multi-tasking capabilities Good on verbal and written communication skills The ability to make timely decisions Strong organizational skills Good leadership and coaching skills Full time IT Technical Support Providing IT infrastructure for implement ERP System To setup system requirement for ERP System Support user to operate this system Have Good skill & experience in Databases, networking, and operating system Have good understanding on the current IT System Experience and knowledge in current system environment. Part time but ready if required Support Function To assist project team on Project administration, training, business process development and prepare new infrastructure (if needed) To coordinate change program impacted of ERP impl. system Project Administration task Setup and organize documentation control system and records Good knowledge of the company’s organizational structure and business processes The ability to work effectively with all members of the organization ranging from executive members to front line / users. Full Time

16 Project Team Responsibilities
Role Responsibility Qualifications Remark Group Leader / Dept. Lead Leader on development defined modules To manage and coordinate project communication, training, socialization and prepare new infrastructure (if needed) Working together with consultant to determine business process flow that needed to ERP system requirement with consultation to process owner. Development of business process documentation (incl design standard form and report) with consultation to process owner. Conduct testing, data collection, data validate and data migration for new system configuration. To drive, coach and facilitate the implementation of new system Issues resolution Working together with key user to Identify of end user, training requirements at their particular site. Experience in functional business process, In-depth knowledge of the company’s business processes & best practices, Strong analytical skills and problem solving skills Strong communication skills and coaching skills Excellence team player skills, with strong verbal and written communication skills and coaching skills, Experience to design and developing System & Procedures. Experience in delivery training Part Time but ready on demand with advance notification Key User Co-ordinate between Project and End User Represent End Users Support project team by share data & information Validate data & Process Build knowledge of what new system will do Assist on end user training “Owner” of new system Lead in managing the change in their unit areas An in-depth knowledge of the business unit functionality business and requirements in their business process area(s), Strong analytical skills. Active and willing Able to use own initiative Good at interpersonal communication

17 17 Digiwin Service Team ERP MFG Consultant ERP FIN Consultant
PM Ryan Han ERP Account Consultant ERP Logistic Consultant ERP MFG Consultant ERP FIN Consultant ERP II Support Consultant HRM Consultant Easy Flow Consultant BI/KPI Consultant Account Services System Analyst Programmer System Engineer TIPTOP Value Added Dept. 17 17

18 Agenda Ganda ERP Project Scope & Benefit Project team
TIPTOP TIM and each milestone approach Project Plan (with Schedule) 1 2 3 4 18

19 TIPTOP Implementation Methodology
TIM 19

20 TIPTOP Implementation Methodology
1.Form Project Committee P 2.Kick-off Meeting 3.Survey and Diagnosis D 4.Application Training 5.Operation Training 6.SOP Modeling 7.Gap Analysis & Customization Extract of our years experience and PMP theory Explain one by one It is to be noted every step has to be completed on time, otherwise the project must be delayed or go over budget. 8.Basic Data Preparation C 9.Process Online Simulation 10.Balance of Data Migration 11.System Goes Live A 12.Monthly Review Meeting 13.Settlement of Accounts 20

21 TIPTOP Implementation Methodology
1.Form Project Committee P 2.Kick-off Meeting 3.Survey and Diagnosis D 4.Application Training 5.Operation Training 6.SOP Modeling 7.Gap Analysis & Customization Extract of our years experience and PMP theory Explain one by one It is to be noted every step has to be completed on time, otherwise the project must be delayed or go over budget. 8.Basic Data Preparation C 9.Process Online Simulation 10.Balance of Data Migration 11.System Goes Live A 12.Monthly Review Meeting 13.Settlement of Accounts 21

22 Form Project Committee
Purpose: Establish an ERP Project Committee & Determine Who is Responsible for What Select appropriate people for each position PM must have enough time to deal with PM shound be in an inter mediate position so that he can negotiate the cross-department issues. As to KM they must know the status of their de and be able to decide the KU active in Open to new ideas 22

23 2. Kick-off Meeting Purpose:
Announce ERP Project Objectives & Direction Introduce Project Organization, Key Roles and Responsibilities Overview of Project Schedule Affirmation of Project Success Expected Benefits from New System Announce ERP Project Objectives & Direction Introduce Project Organization, Key Roles and Responsibilities Overview of Project Schedule CEO also express his support and expectation to this project. Officially 23

24 TIPTOP Implementation Methodology
1.Form Project Committee P 2.Kick-off Meeting 3.Survey and Diagnosis D 4.Application Training 5.Operation Training 6.SOP Modeling 7.Gap Analysis & Customization Extract of our years experience and PMP theory Explain one by one It is to be noted every step has to be completed on time, otherwise the project must be delayed or go over budget. 8.Basic Data Preparation C 9.Process Online Simulation 10.Balance of Data Migration 11.System Goes Live A 12.Monthly Review Meeting 13.Settlement of Accounts 24

25 3. Survey and Diagnosis Purpose: Data System Consultants Get Actual Business Model & Data Process Flow Participants: All Project Team Documents Required: Current Business Process Flow Chart All Currently Used Documents, Forms, Receipts, etc. Currently Used Statistical & Management Reports Deliverables: Report of Initial Survey Results Initial Variance Analysis Report Some Parts of Modules Will Require Assistance from e-Learning Staff for Set Up (in Coordination with PM) IFRS In this step the conslutant will interview every KM KM can share their status. They can point out the Dilemma they encounter Conslutant Files the report the KM will check and reply wether the report is correct Additionally, Send preliminary analysis report. This report will list which programs need to be modified. KM will double check the report These are what we have to do in this step. 25

26 4. Application Training Purpose: Rapid Training Through e-Learning
Consultant Introduces TIPTOP SOPs & Functions Focus on Specific Processes as Needed Provided: Mapping of Standard Business Processes User Handbooks for Every Module e-Learning Online Training Material (According to Module & Modifications Needed) Deliverables: Gap Analysis Report Participant Training Test Results Statistics on Participant Online e-Learning Progress The step we suggest KM KU to do e-Learning Online Training. It will give you the basic knowledge of the system before the Consultant give the lesson In our experernce, the more you achieve the online training, the more cost you can save PM Arrange the learning schdule website Statistics on Participant Online e-Learning Progress to minitor their Learning 26

27 5. Operation Training Purpose:
System Planner Gets Clear Understanding How System Actually Works System Discrepancies in Detail Participants: Project Team and KUs Provided: Mapping of Standard Business Processes User Handbooks for Every Module Deliverables: Gap Analysis Report Participant Training Test Results The step KM KU must ioin the training given by con Participant Training Test Results The Results point out who need to be trained again. PM have to supervise their learning progress. no matter what It would be better to review the lesson by yourself. 27

28 6. SOP Modeling Purpose: Establish the New SOPs for the Company
Participants: Project Team, Key Users or Designated Leader for Each Module Provided: SOPs Internal ISO/Key Audit Points Deliverables SOP Flow Chart for Each Module Process Owner Sign Off on Completed Modules First con provide the standard SOP and discuss it with the KMs After the discussion we will decide the computerize process and check point within process And then KU have to draw the SOP and note remark in process After finishing the document , the heads of related Department will verify and sign the document signed 28

29 7. GAP Analysis & Customization
Purpose: Process & System Differences Review with Solutions Development Participants: Project Team Consultant Preparation: Internal Discussions Conducted about Process Differences of New System Consultants Formulate Reports & Variance Analyses to Adjust Project Direction Deliverables: Specifications Confirmation Gap Analysis Report After the SOP Modeling Con well make sure the final busniess management procedure And he offer the Gap Analysis Report Analysis Report tells the diffrernce between your procedure and our TT system At the same time theReport will give suggestion about Customization or modification of procedure If its not necessary, modification of procedure will be our suggestion Bec Customization needs extre time and expense. 29

30 TIPTOP Implementation Methodology
1.Form Project Committee P 2.Kick-off Meeting 3.Survey and Diagnosis D 4.Application Training 5.Operation Training 6.SOP Modeling 7.Gap Analysis & Customization Extract of our years experience and PMP theory Explain one by one It is to be noted every step has to be completed on time, otherwise the project must be delayed or go over budget. 8.Basic Data Preparation C 9.Process Online Simulation 10.Balance of Data Migration 11.System Goes Live A 12.Monthly Review Meeting 13.Settlement of Accounts 30

31 8. Basic Data Preparation
Purpose: Preparation of Old System Data Files Data Entry of Basic Info into New System Required: Data Migration & Archiving Recommendations Table Method of Execution: Makes Schedule According to Archiving Table to be Done After Training Review Progress of Implementation There are three things necessary to support system. One is the practical sop as we mentioned Another one is the correct and complete Basic Data In our experience it takes long time to build the Basic Data and cherk the correctness Therefore we will give you reasonable schedule The MIS have to complete this step acccording to schedule PM have to minitor the progress Of couse Con team will assist PM. Basic Data Preparation is critical element in using the system Ple make sure this step will be completed on time 31

32 9. Process Online Simulation
Purpose: KMs & KUs Become Familiar with New System Further Explore Potential Differences Participants: Project Team & KUs Provided: Current Version of SOPs Deliverables: Participant Online Simulation Scores 32

33 10. Balance of Data Migration
Purpose: Migration of Balance of Data for Each Module Input of Accurate Accounting Data (or Data Conversion) Requirements: Accounting Opening Balance Opening Balance Plan for Each Module Deliverables: Accounts Balance Acceptance Report Import of Opening Balances 33

34 TIPTOP Implementation Methodology
1.Form Project Committee P 2.Kick-off Meeting 3.Survey and Diagnosis D 4.Application Training 5.Operation Training 6.SOP Modeling 7.Gap Analysis & Customization Extract of our years experience and PMP theory Explain one by one It is to be noted every step has to be completed on time, otherwise the project must be delayed or go over budget. 8.Basic Data Preparation C 9.Process Online Simulation 10.Balance of Data Migration 11.System Goes Live A 12.Monthly Review Meeting 13.Settlement of Accounts 34

35 11. System Goes-Live Purpose: Bring System Online Recommendation:
New System Completely Replaces Old System with No Parallel Processing Method of Execution: Consultant & Service Staff Initialize System On Site Deliverables: Auto Generated System Online Performance Report 35

36 12. Monthly Review Meeting
Purpose: Project Costs, Progress Control Review the Various Project Implementation Stages & Objectives Resolve All Outstanding Major Issues Review Online e-Learning Reports (Statistics Available for Each System Module Implemented) Meeting Schedule: After Project Kick-Off , at Least Once a Month Participants: Process Owner, All Project Participants Deliverables: Discussion of Issues & How They were Resolved Subsequent Stages & Plans 36

37 13. Settlement of Accounts
Purpose: Initiate Accounts Settlement Verify Completion of Project Tasks Provide Official Documentation & Management Reports Requirements: Settlement of Costs, Accounts Settlement SOP Deliverables: Relevant Account Settlement Reports & Management Reports Completion Date: 10th of the 1st Month Online, with adjustments made in subsequent months to reduce settlement process 37

38 Agenda Ganda ERP Project Scope & Benefit Project team
TIPTOP TIM and each milestone approach Project Plan (with Schedule) 1 2 3 4 38

39 TIM , Product Project Partner TIPTOP Implementation Methodology
Decision Needs KPI Monitoring Operation Needs Gap Analysis Program Modifying Balance Check S.O.P. Modeling Simulation Fine-tuning TIPTOP Goes Live Close Report Application Training End Users Training Survey Diagnosis Data Migration & Data Input Kick-off Meeting M01 M02 M03 M04 M05 M06 39

40 ERP Project Milestone Planning 23 May, Contract Signing
Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Planning Signing contract Hardware purchase System Instalation Form Project Team Kick Off 23 May, Contract Signing Phase 1 - Project Implementation 6 months Finance & Acc; Supply Chain, Sales, Manufacturing, HRM Phase 2 - Project Implementation 6 months GPS/PLC Integration; B2B; BI, Easyflow and other customized programs 10 June, Kick Off Do / Implementing 1. Survey & Diagnosis 2. Application Training 3. Operation Training 4. S.O.P. Modeling 5. Gap Analysis & Customization 6. HRM Application Training /Gap Analysis 1. S&D completed (week 2 July) 2. Application training done (week 2 August) 3. Operational training done (week 4 Sep) 4. SOP Modeling completed (week 1 Oct) 5. Gap Anls & Custm completed (week 3 oct) 6. HRM Training & Gap Analysis completed (week 5 oct) Check Basic Data Preparation Process Online Simulation Balance of data migration 1. Basic Data prep done (week 2 Oct) 2. Online Simylation done (week 4 Nov) 3. Data migration completed (week 4 Dec) Action System Go-live Monthly Review Meeting Setlement of account Go-live support Phase 1 Go Live Phase 2 Go-Live 40

41 Q & A 41

42 What next Be ready for 1st step survey and diagnosis 42

43

44

45

46 Three elements of success The support of Superiors!!
1.Correct information 3.Skilled operators 2.Smooth flow The support of Superiors!! 46

47 Synergy and teamwork for successful ERP Project


Download ppt "There is no I in TEAM."