1
7 September 2006VELOEddy Jans 0 VELO-installation September 7, 2006 installation of exit window + part I of the beam pipe logging of vacuum data what’s next
2
7 September 2006VELOEddy Jans 1 August 14: opening of RICH1-side of VELO-tank to install exit window with w.f.s. + beam pipe part I
3
7 September 2006VELOEddy Jans 2 Installation of new/longer w.f.s.
4
7 September 2006VELOEddy Jans 3 Installation of exit window + beam pipe
5
7 September 2006VELOEddy Jans 4 What’s next ?? Perform vacuum tests (venting with Ar, mass spectra, etc.) (≈ end of September) Get PVSS implementation running Measuring ((x,y,z) + leaktest) and manipulating of rf-boxes @ NIKHEF Apply NEG-coating on rf-boxes Organize clean + adequate working place for rf-box mounting Uninstall bellows Perform various repairs (see next slide) Combine bellows + rf-boxes Measure geometry Install bellows + rf-boxes Perform extensive vacuum tests Check positioning
6
7 September 2006VELOEddy Jans 5 baratrons Repair list + 1 motion axis to be replaced