11/26/2002Edgar L Black IIT MICE Video Conference November 27, 2002 Summary of safety implementation for proposal.

Similar presentations


Presentation on theme: "11/26/2002Edgar L Black IIT MICE Video Conference November 27, 2002 Summary of safety implementation for proposal."— Presentation transcript:

1 11/26/2002Edgar L Black IIT MICE Video Conference November 27, 2002 Summary of safety implementation for proposal

2 11/26/2002Edgar L Black IIT Design requirements Physics determined that a minimum mass in the path of the beam is a most. Translating on the requirement for thinner and lesser material for containments of hydrogen and for vacuum, within standard safety structural boundaries RAL safety emphasize isolation of the hydrogen from the oxygen in the air at cryogenic temperatures, principal requirement for the design of the containment vessels

3 11/26/2002Edgar L Black IIT

4 11/26/2002Edgar L Black IIT PARTIAL SECTIONAL VIEW OF THE RF MODULE DOUBLE WALL VACUUM VESSEL W/ARGON GAS

5 11/26/2002Edgar L Black IIT Components on this assembly are: Manifold absorber body, absorber vacuum chamber and hydrogen, helium, vacuum piping connections, including the absorber body supporting fins which serve also as heat transfer between the absorber and the vacuum window. With the windows installed the assembly will be tested for leaks and alignment The windows are removed in this assembly.

6 11/26/2002Edgar L Black IIT The focusing coils magnetic forces are distributed through the split spool like structure, the 4 segments surround the absorber vacuum chamber and the connecting piping, the segments are bolted to each other and to the coils aluminum casing