Installation: the plan. Reality Pressure dome: the problem.

Similar presentations


Presentation on theme: "Installation: the plan. Reality Pressure dome: the problem."— Presentation transcript:

1 Installation: the plan

2 Reality

3 Pressure dome: the problem

4 The Rack, Mark I

5 Scan Head, in place, finally

6 Pressure Vessel “Doghouse” Equipment Racks - Cable Run 6 144Z AMS Configuration

7 AMS Mosaic 3/1/13 7 Magna, UT Kennecott Smelter

8 Kennecott Stack 3/1/13 8 Kennecott Stack

9 West Valley City, UT 3/1/13 DRAFT9 RSAC

10 AirCell Issues  Leaver Arm Measurements for Applinix  Installed electronics into IPM box  Integrate IPM and conduct ground tests  Reconfigure AirCell for static IP and reset router  Connect IPM to AirCell and AMS  Test Ground Processing Software Connection

11 Wasatch Front 3/29/13 -112.245 42.069 7,5,3 7.6m

12 Wasatch Front 3/29/13

13 Utah Lake 3/29/13 Imagery will be evaluated by USGS for hot spring monitoring project

14 Questions