Presentation is loading. Please wait.

Presentation is loading. Please wait.

Street & Highway Works Beacon Condition of Borough Principal Roads Gordon Prangnell.

Similar presentations


Presentation on theme: "Street & Highway Works Beacon Condition of Borough Principal Roads Gordon Prangnell."— Presentation transcript:

1 Street & Highway Works Beacon Condition of Borough Principal Roads Gordon Prangnell

2 Street & Highway Works Beacon BACKGROUND BPRN DVI surveys started 1999 DVI – walked visual scheme surveys CVI – network tool UKPMS Role Tranche 1, 2 and 3 BVPI – Best Value indicators Options for Principal Roads – DVI CVI etc

3 Street & Highway Works Beacon Inspections? UKPMS DVI CVI Condition Index BV PI £’s

4 Street & Highway Works Beacon

5 Structural Condition Index Bands & Recommended Treatments

6 Street & Highway Works Beacon

7 2006 - 2007 SCANNER introduced Road Condition Index (RCI) BV 223 replaces BV 96 BV96 used TTS from 2004/05 DVI not permitted on PRN for PI London reporting DVI for resources

8 Street & Highway Works Beacon Red - Definitions SCANNER Maintenance to be considered soon DVI Requiring further investigation

9 Street & Highway Works Beacon 2007 – 2008 R&P

10 Street & Highway Works Beacon

11

12

13

14 TRENDS & RESOURCE ALLOCATION Reducing Red

15 Street & Highway Works Beacon RESOURCES Perception – insufficient resources Reds trends over 5 years are OK SCI – ‘the red’ reducing Amber?? Scotland – monitor ‘red and amber’ Look at Red and Amber

16 Street & Highway Works Beacon

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50 TREND INDICATORS R = Reducing E = Even/Level I = Increasing

51 Street & Highway Works Beacon BoroughRedAmberRed & Amber BARKINGRRR BARNETRRR BEXLEYRER BRENTRRR BROMLEYRRR CAMDENRER CITYIRI CROYDONRRR EALINGRRR ENFIELDRER GREENWICHRER HACKNEYRER HAMMERSMITHEII HARINGEYRER HARROWRRR HAVERINGRRR HILLINGDONRRR HOUNSLOWRRR ISLINGTONRER KENSINGTONEEE KINGSTONRRR LAMBETHRRR LEWISHAMERE MERTONRRR NEWHAMRER REDBRIDGERRR RICHMONDRRR SOUTHWARKERR SUTTONERR TOWERHAMLETSEEE WALTHAMFORESTRRR WANDSWORTHRER WESTMINISTERERR

52 Street & Highway Works Beacon QUARTILE SCORES Red Red & Amber Quartiles 2 - 4 6 - 10 Upper 5 - 7 11 - 15 U/Middle 8 - 10 16 - 20 L/Middle 11 - 13 21 - 26 Lower

53 Street & Highway Works Beacon RedAmber Red & AmberRed Red & Amber Borough70 - 10050 -7050 - 1002008/09 KINGSTONRRR27 BARKINGRRR39 KENSINGTONEEE36

54 Street & Highway Works Beacon RedAmber Red & AmberRed Red & Amber Borough70 - 10050 -7050 - 1002008/09 CROYDONRRR412 HAVERINGRRR415 REDBRIDGERRR415 WANDSWORTHRER59 BEXLEYRER610 HILLINGDONRRR610 SUTTONERR68 BROMLEYRRR710

55 Street & Highway Works Beacon RedAmber Red & AmberRed Red & Amber Borough70 - 10050 -7050 - 1002008/09 BARNETRRR511 HACKNEYRER715 HARROWRRR714 LEWISHAMERE713 WALTHAM FORESTRRR715

56 Street & Highway Works Beacon RedAmber Red & AmberRed Red & Amber Borough70 - 10050 -7050 - 1002008/09 GREENWICHRER616 NEWHAMRER619 WESTMINISTERERR616 ISLINGTONRER914 EALINGRRR915

57 Street & Highway Works Beacon RedAmber Red & AmberRed Red & Amber Borough70 - 10050 -7050 - 1002008/09 BRENTRRR816 HAMMERSMITHEII820 HARINGEYRER819 MERTONRRR817 ENFIELDRER918 HOUNSLOWRRR918 TOWERHAMLET SEEE918 CAMDENRER1018 LAMBETHRRR1019

58 Street & Highway Works Beacon RedAmber Red & AmberRed Red & Amber Borough70 - 10050 -7050 - 1002008/09 CITYIRI1321 RICHMONDRRR1524 SOUTHWARKERR1526

59 Street & Highway Works Beacon Funding TfL Model is robust More for less Eye on the Amber Further analysis SCANNER data YearAllocation £ 2004-0540,000,000 2005-0634,000,000 2006-0728,218,000 2007-0826,027,000 2008-0918,730,000 2009-1017,105,000

60 Street & Highway Works Beacon END


Download ppt "Street & Highway Works Beacon Condition of Borough Principal Roads Gordon Prangnell."

Similar presentations


Ads by Google