Energy Requirement for Rural ICT Telecentre: CoERI Implementation A.K Othman 1, H. Zen, W.A Wan Zainal Abidin, T. Masri, H. Mohamad Basri, K. Lias, A.

Similar presentations


Presentation on theme: "Energy Requirement for Rural ICT Telecentre: CoERI Implementation A.K Othman 1, H. Zen, W.A Wan Zainal Abidin, T. Masri, H. Mohamad Basri, K. Lias, A."— Presentation transcript:

1 Energy Requirement for Rural ICT Telecentre: CoERI Implementation A.K Othman 1, H. Zen, W.A Wan Zainal Abidin, T. Masri, H. Mohamad Basri, K. Lias, A. S. W Marzuki Institute of Social Informatics and Technological Infrastructure Centre of Excellence for Rural Informatics (ISITI-CoERI), Universiti Malaysia Sarawak (UNIMAS), Kota Samarahan, Sarawak eBario Knowledge Fair 3 2011 16-18 November 2011, Bario, Sarawak

2 Computer systemSolar PV System Energy Requirement for Rural ICT Telecentre: CoERI Implementation Setting up telecentre infrastructure Energy requirement Local energy resourceICT equipment requirementfund MicrohydroWind turbineGenerator sets RE Hybrid and Battery Backup System Computer peripheralConnectivity devices

3 Selection of Energy Sources for Rural ICT Energy Solution Capital Cost and Operation & Maintenance System Lifetime Availability of Resources Vulnerability to Damage from Natural Forces Solar Photovoltaic High capital cost, low operating cost 20-25 years Battery replacement is required between 5-10 years WidespreadLow Generator Sets (Diesel/Gas) Low capital costs, high operating cost (Price of Petrol is three times higher compare to town area) 3-10 yearsWidespreadVery low Small Wind Medium capital costs, low operating cost. Most of CoERI ICT sites have less potential of wind power plant. 10-15 yearsSite SpecificModerate Micro-hydro Low-medium capital costs, low operating costs 50-100 yearsSite SpecificHigh Battery Back-up System Battery backup system can be used in a variety of other electricity resources such as hybrid with solar PV, small hydro, wind and generator set. UNIMAS has done the study on the Lithium Polymer type of battery hybrid with generator sets and it claimed that it can reduced the cost of operating up to 50% (Project Grant No. L18403/F02/00/JARIMAS)

4 Computer systemSolar PV System Energy Requirement for Rural ICT Telecentre: CoERI Implementation Setting up telecentre infrastructure Energy requirement Local energy resourceICT equipment requirementfund MicrohydroWind turbineGenerator sets RE Hybrid and Battery Backup System Computer peripheralConnectivity devices

5 CoERI ICT Telecentre Energy Requirement Power Requirement for ICT Equipments Type of Equipment CoERI ICT Sites eBarioeLamaieBa’KalalaneBuayaneLarapan Quanti ty Power (Watts) Quantit y Power (Watts) Quantit y Power (Watts) Quantit y Power (Watts) Quant ity Power (Watts) Desktop Computer 8200x8=1600-------- Laptop 180x1=80880x8=6408 8 8 Server 150x1=50-------- Printer 1150x1=1501100x1=1001 1 1 Modem/Access Point 150x1=501 1 1 1 Switch/ Bridge 120x1=201 1 1 1 Others (Extra Equipments) -800-200- -100-

6 CoERI ICT Telecentre Energy Requirement Power Requirement for ICT Building Type of Equipment CoERI ICT Sites eBarioeLamaieBa’KalalaneBuayaneLarapan Quantity Power (Watts) Quantity Power (Watts) Quantit y Power (Watts) Quantit y Power (Watts) Quantit y Power (Watts) Lamp (CFL) 818x8=818x8=1441018x10=180818x8=14410 18x10=18 0 Fluorescent 240x2=80-------- Fan (Standing /Table) 250x2=100-------- Fan (Ceiling/ Wall Mounted) 250x2=1002 2 2 2 Security Spot Light/Outdoo r Lighting 240x2=80220x2=402 2 2

7 eBario ICT Telecentre

8 eBa’Kelalan ICT Telecentre

9 eLamai ICT Telecentre

10 eLarapan ICT Telecentre

11 Computer systemSolar PV System Energy Requirement for Rural ICT Telecentre: CoERI Implementation Setting up telecentre infrastructure Energy requirement Local energy resourceICT equipment requirementfund MicrohydroWind turbineGenerator sets RE Hybrid and Battery Backup System Computer peripheralConnectivity devices