Presentation is loading. Please wait.

Presentation is loading. Please wait.

BTW BB 90 Day CP Notification Release AE BTW Story Design CP Impacts Category : L2C 20C Author : Hemang Joshi Version : 1-0 Date : 29/Jun/12.

Similar presentations


Presentation on theme: "BTW BB 90 Day CP Notification Release AE BTW Story Design CP Impacts Category : L2C 20C Author : Hemang Joshi Version : 1-0 Date : 29/Jun/12."— Presentation transcript:

1 BTW BB 90 Day CP Notification Release AE BTW Story Design CP Impacts Category : L2C 20C Author : Hemang Joshi Version : 1-0 Date : 29/Jun/12

2 Slide 2 BTW BB 90 Day CP Notification - Release AE Stories covered: 1.BTWCE-22932; 20C Product Withdrawal

3 Slide 3 20C PRODUCT WITHDRAWAL – ON 21C SYSTEMS BTWCE-22932

4 Slide 4 BTW BB 90 Day CP Notification – Release AE Description and CP Interface Impacts Summary Description As part of this BS 20 Products (i.e. IPstream and Datastream) will be withdrawn CPs will not be able to place 20C orders as soon as the last date for the 20C products has elapsed for the given exchange CP Interface Impacts New validation error codes and messages: BTWCE-22932

5 Slide 5 BTW BB 90 Day CP Notification – Release AE XML Changes B2B XML Changes None. BBAC XML changes “None” BBCR XML Reporting changes “None” KBD XML changes “None” Sentry Webservices changes “None” BTWCE-22932

6 Slide 6 BTW BB 90 Day CP Notification – Release AE Response Codes – Changes & New (OneSiebel; KBD; Sentry) Changes to existing Response Code BTW Completion Code Old descriptionNew description NoneN/A BTWCE-22932

7 Slide 7 BTW BB 90 Day CP Notification – Release AE Response Codes – Changes & New (OneSiebel; KBD; Sentry) New error or response codes BTW Completion Code DescriptionWhen will this be sent? 704Service requested cannot be provided as the product has been retired from new supply on this exchange. Please select a different product This will be sent / displayed when ‘no new supply’ is available at the exchange. This is for IPstream provide orders 705Service request cannot be completed as the product will be retired and no longer available on this exchange. This will be sent / displayed when the product has been fully retired on the exchange and no modify orders can be accepted. This is for IPstream/Datastream modify orders. BTWCE-22932


Download ppt "BTW BB 90 Day CP Notification Release AE BTW Story Design CP Impacts Category : L2C 20C Author : Hemang Joshi Version : 1-0 Date : 29/Jun/12."

Similar presentations


Ads by Google