Download presentation
Presentation is loading. Please wait.
Published byEdwin Full Modified over 9 years ago
1
MONITORING ON TUNNEL CONSTRUCTION IN CZECH REPUPLIC
2
1. DESIGN monitoring dimensions and instrumentation 2. MONITORING OFFICE data operating (archiving, sharing) measurement interpretation - results 3. MONITORING PANNEL monitoring conclusions (1 per week min.) design and technology back analyses 4. SPECIAL MODE building under passing public relation and cooperation with building's users Monitoring
3
1.HIGHWAY TUNNELS Valík (D5 - Plzeň) Panenská (D8 – Krušné Hory) Libouchec (D8 – Krušné Hory) Klimkovice (D47 – Ostrava) 2.RAILWAY TUNNELS Krasíkov I a II (3. Transit corridor) Malá Huba, Hněvkovský I, II (3. Transit corridor) The New Junction (Prague) Březno (Chomutov) 3. METRO Line IV.C 4.PILOT TUNNELS Prague’s highway ring Brno’s road inner ring
4
Basic data: - tunnel lengthLTT= PTT= 330 m - cross section 125 m 2 154,25 m 2 emergency pits - cut and coverLTT 50 m PTT 60 m SG – Geotechnika provides: geotechnical supervision monitoring office monitoring instrumentation - extensometerers - leveling on surface - portal deformation - tens meters (prim. lining) - tensometers (final. lining) - pressure cells - convergence Tunnel Valík
6
Basic data : - tunnel length LTT= PTT= 2000 m - cross section 85 m 2 125 m 2 emergency pits SG – Geotechnika provides : geotechnical supervision monitoring office monitoring instrumentation - extensometerers - leveling on surface - portal deformation - tens meters (prim. lining) - pressure cells - convergence - seismic and acoustic measurement Tunnel Panenská - hydrogeology - basic data on buildings - 3D scanner Cyrax
7
Tunnel Panenská
9
Basic data:- tunnel length LTT= PTT= 860 m - cross section154,25 m 2 - cut and cover Ostrava portal 50m Brno portal 170 m Join venture - Monitoring Tunnel Klimkovice:SG-Geotechnika a.s. GeoTest Brno a.s. Inset, s r.o. SG – Geotechnika provides: - geotechnical supervision - monitoring office - monitoring instrumentation - extensometers - convergence Tunnel Klimkovice
12
Basic data: - tunnel length 1020 + 120 m - cross section 95 – 120 m 2 SG-Geotechnika provides: client technical supervision geotechnical supervision monitoring office monitoring instrumentation - extensometers - leveling on surface - portal deformation - convergence - basic data on buildings - 3D scanner Cyrax Tunnels Krasíkov I &II
16
Basic data: - tunnel length 380 + 120 + 420 m - cross section 95 - 120m 2 SG-Geotechnika provides: client technical supervision geotechnical supervision monitoring office monitoring instrumentation - extensometers - leveling on surface - portal deformation - convergence - basic data on buildings - 3D scanner Cyrax Tunnels Malá huba, Hněvkovský I, II
18
Basic data: - tunnel length : SO 09 – double track tunnel - 970 m SO 13 – double track tunnel - 1335 m - 2 x single track tunnel - 65 m - cross section : 62 m 2 - 97 m 2 Join venture:SG-Geotechnika a.s. Inset, s r.o. SG-Geotechnika provides : - geotechnical supervision - monitoring office - monitoring instrumentation - extensometers - inclinometers - building inclination (tilt meter) - building cracks measurement - convergence - geology - hydrogeology Metro IV. C (Ládví – Letňany)
19
Metro IV. C
20
Fartak tunnels, Republic of Yemen
21
Basic data: - nr.of tunnels:4 (T1,T2,T3,T4) - tunnels length:1535 + 1015 + 250 + 320 m - cross section 95-115 m 2 - excavation methodNRTM Client:Kuwait Arab Fund Builder:General Directorate of Roads, Republic of Yemen Contractor:YERTAS, Turkey Consultant:RENARDET s.a., Italy - Yemen Fartak tunnels, Republic of Yemen
22
Fartak tunnels
26
THANK YOU FOR YOUR ATTENTION
Similar presentations
© 2024 SlidePlayer.com Inc.
All rights reserved.