1 Best solutions ensure enthusiasm BERNARD Ingenieure

2 Overview 1.BERNARD Ingenieure 2.Recent Tunnelling Projects

3 BERNARD Group International Technically specialized companies Total of 400 employees The BERNARD Group stands for interdisciplinary engineering services; it provides comprehensive technical and economic consulting services, as well as complete planning and design, oversight of project development and implementation, time scheduling and site supervision. BERNARD Group

4 Fields of Activity Electro Technology Materials Production Industry Energy Infrastructure Transportation Hydropower Pipelines Distribution Networks Building Construction Environment Hydraulic Engineering Roads and Railroads Bridges Tunnels

5 Comparative Studies, Environmental Impact Planning, Tender Design, Detailed Design, Design Coordination, Safety Design Designing Feasibility Studies, Environmental Impact Studies, Remedial Concepts, Cost-Benefit Analyses, Tender Invitations, Complete Design Consulting Controlling Expert Opinions, Design Verification, Site Supervision, Monitoring, Occupational Safety and Health Management, Measurement Technology Supervising Project Development, Project Management, Information Management, Time Scheduling, Financing Concepts, Construction Work Coordination Our Engineering Services

6 Scope of services Feasibility studies; Preparation of tender documents; Detailed planning Cost estimates and risk analyses Project management Site supervision and contract administration Consulting during construction Claim and anti-claim management Department of Geotechnical and Tunnel Engineering

7 RAILWAYS AND TUNNELS

8 CLIENT ASFiNAG (Austrian Motorway Authority) BRIEF DESCRIPTION Existing Pfänder Tunnel constructed 1974 and 1980 to bypass Bregenz. Key component of A14 Rhine Valley Highway and European road network 2 nd Tube required due to increasing traffic and stricter safety standards. 6.6 km new 2 nd tube excavated by TBM 12.5 m. Geology: Molasse: conglomerates, sandstone, shale, claystone Double-shell lining with a backfilled, non-watertight segmental lining waterproofing membrane between segments and cast-in-place lining 15 cross-passages between the tunnel tubes, 7 lay-bys Rehabilitation of existing tube BERNARD SERVICES Site supervision and construction management TOTAL PROJECT COSTS 218 Mio. (of which 192 Mio. are for the construction of the new second tube) PERIOD May 2006 – July TBM heading completed November Completion of new second tube expected June 2012 PFÄNDER TUNNEL – 2.TUBE Vorarlberg, Austria Recent Tunneling Supervision Projects

9 Construction of a 7 km long Access-. Dewatering-, and Exploratory Tunnel, 30 m² Cross section, excavation and support according to the principles of NATM Construction of a 3.5 km long, declined Access Tunnel, 85 m² Cross section, excavation and support according to the principles of NATM BRENNER BASE TUNNEL SITE SUPERVISION AT ACCESS AND EXPLORATORY TUNNELS Recent Tunneling Supervision Projects

10 CLIENT ÖBB – (Austrian Federal Railways) Infrastructure Construction AG, Graz BRIEF DESCRIPTION Construction of railway tunnel with two single-track tubes; 33 km long, cross-passages every 500 m OUR SERVICES Planning of all project phases in conjunction with partner firms Contract Management TOTAL PROJECT COSTS 4,000 Mio. PERIOD 2006 – ongoing (until 2016) Recent Tunnel Design and Contract Management Project KORALMBAHN RAILWAY PROJECT Graz - Klagenfurt Koralm Base Tunnel - Styria, Austria

11 CLIENT ÖBB – (Austrian Federal Railways) Infrastructure Construction AG, Graz BRIEF DESCRIPTION Construction of railway tunnel with two single-track tubes; 33 km long, cross-passages every 500 m OUR SERVICES Planning of all project phases in conjunction with partner firms Contract Management TOTAL PROJECT COSTS 4,000 Mio. PERIOD 2006 – ongoing (until 2016) Recent Tunnel Design and Contract Management Project KORALMBAHN RAILWAY PROJECT Graz - Klagenfurt Koralm Base Tunnel - Styria, Austria

12 CLIENT ASFiNAG (Austrian Motorway Authority) BRIEF DESCRIPTION 2-lane highway tunnel, length 5,069 m, excavation cross-sections m², 23 cross-passages to existing tube; Total project length, incl. East/West portal areas, of 5,900 m OUR SERVICES Preliminary design; Environmental Impact Assessment; Preparation of documents for approval by authorities; Cost analyses; Risk assessment; Tender design; Preparation of tender documents; Preparation of technical specifications; Design for construction; Consultancy during construction TOTAL PROJECT COSTS 115 Mio. (including rehabilitation of the 1 st tube) PERIOD ongoing A12 INN VALLEY MOTORWAY ROPPEN TUNNEL, 2 ND TUBE Tyrol, Austria Recent Tunnel Design Projects

13 CLIENT ASFiNAG (Austrian Motorway Authority) BRIEF DESCRIPTION 2-lane highway tunnel, length 5,069 m, rehabilitation measures for the existing tube, 23 cross-passages to existing tube; Total project length, incl. East/West portal areas, of 5,900 m OUR SERVICES Preliminary design; Cost analyses; Risk assessment; Tender design; Preparation of tender documents; Preparation of technical specifications; Design for construction; Consultancy during construction TOTAL PROJECT COSTS 115 Mio. (including construction of the 2 nd tube) PERIOD ongoing A12 INN VALLEY MOTORWAY ROPPEN TUNNEL, 1 ST TUBE (REHABILITATION WORKS) Tyrol, Austria Recent Tunnel Rehabilitation Projects

14 CLIENT ASFiNAG (Austrian Motorway Authority) BRIEF DESCRIPTION Rehabilitation of the Niklasdorf and Massenberg Tunnels to state-of-the-art standard, in terms of safety and structural integrity. Niklasdorf Tunnel: Twin-tube, 1,332 m long (782 m open-cut); creeping slope rehabilitation concepts Massenberg Tunnel: Twin-tube, 460 m long; rehabilitation of the inner-lining (constructed in 1964) with a slender sprayed concrete lining OUR SERVICES Geotechnical measurements and interpretation; Expert opinion; Cost analyses; Tender design; Preparation of tender documents; Preparation of technical specifications; Design for construction; Site supervision (during emergency repairs) TOTAL PROJECT COSTS 0.5 Mio. PERIOD ongoing S6 SEMMERING HIGHWAY REHABILITATION OF NIKLASDORF AND MASSENBERG TUNNELS Styria, Austria Recent Tunnel Rehabilitation Projects

15 NORTH APPROACH TO BRENNER – BASE -TUNNEL AT LOWER – INN – VALLEY EXPLORATORY ADITS Fiecht: Heading in loose ground 30 m 2 ; length 400 m Heading in rock 30 m 2 ; length 700 m Pump cavern 100 m 3 Vomp: Exploratory tunnel; cross-sectional area 30 m 2 Length 4,700 m of which 1,600 m were in loose ground Brixlegg East: Exploratory tunnel; cross-sectional area 30 m 2 Length 2,270 m Trial excavation of main tunnel profile 125 m 2 Length 60 m Brixlegg West: Exploratory tunnel; cross-sectional area 50 m 2 Length 250 m Entrance cavern of main tunnel profile 125 m 2 Length 60 m Recently Completed Tunneling Supervision Projects

16 NORTH APPROACH TO BRENNER – BASE -TUNNEL AT LOWER – INN - VALLEY Lot H6 Terfens Gallery: Length 1,330 m Relocation of existing railway line Landscaping and viaduct for wildlife Construction Period: 2003 – 2006 Lot H5 Vomp - Terfens:Tunnel: Length 8,480 m, 5,030 m in loose ground Excavation sections up to 203 m² Construction Period: 2003 – 2009 Lot H3-4 Münster - Wiesing Tunnel: TBM with slurry shield, diameter 13.5 m Length 5,818 m River Inn Crossing, 11 escape shafts Construction Period: 2006 – 2009 Lot H8 Jenbach - Stans Tunnel: TBM with slurry shield, diameter 13.5 m Length 5,182 m Undercrossing of the Jenbach Construction Period: 2006 – 2010 Recent Tunneling Supervision Projects

17 NORTH APPROACH TO BRENNER – BASE -TUNNEL AT LOWER – INN - VALLEY Lot H6 Terfens Gallery: Length 1,330 m Relocation of existing railway line Landscaping and viaduct for wildlife Construction Period: 2003 – 2006 Lot H5 Vomp - Terfens:Tunnel: Length 8,480 m, 5,030 m in loose ground Excavation sections up to 203 m² Construction Period: 2003 – 2009 Lot H3-4 Münster - Wiesing Tunnel: TBM with slurry shield, diameter 13.5 m Length 5,818 m River Inn Crossing, 11 escape shafts Construction Period: 2006 – 2009 Lot H8 Jenbach - Stans Tunnel: TBM with slurry shield, diameter 13.5 m Length 5,182 m Undercrossing of the Jenbach Construction Period: 2006 – 2010 Recent Tunneling Supervision Projects

18 NORTH APPROACH TO BRENNER – BASE -TUNNEL AT LOWER – INN - VALLEY Lot H6 Terfens Gallery: Length 1,330 m Relocation of existing railway line Landscaping and viaduct for wildlife Construction Period: 2003 – 2006 Lot H5 Vomp - Terfens:Tunnel: Length 8,480 m, 5,030 m in loose ground Excavation sections up to 203 m² Construction Period: 2003 – 2009 Lot H3-4 Münster - Wiesing Tunnel: TBM with slurry shield, diameter 13.5 m Length 5,818 m River Inn Crossing, 11 escape shafts Construction Period: 2006 – 2009 Lot H8 Jenbach - Stans Tunnel: TBM with slurry shield, diameter 13.5 m Length 5,182 m Undercrossing of the Jenbach Construction Period: 2006 – 2010 Recent Tunneling Supervision Projects

19 Lot H8 – Tyrol copyright: BEG RAILWAY AXIS BRENNER MUNICH – VERONA

20 CLIENT Verbund-Austrian Hydro Power AG Wien BRIEF DESCRIPTION Diversion power plant with daily-storage reservoir, maximum capacity 63 MW, head 85 m; Increase of diversion flow from 60 to 120 m³/s, 3 Francis spiral turbines Headrace channel + headrace tunnel 6.1 km, channel and open channel surge tank 530 m OUR SERVICES Preparation of documents for approval by authorities; Preparation of tender documents; Design for construction TOTAL PROJECT COSTS 55 Mio. PERIOD May 2006 – September 2009 HIEFLAU HYDROPOWER PROJECT Styria, Austria Tunnel Design Projects

21 GKI – INN HYDRO ELECTRIC POWER PLANT Austria/ Switzerland BRIEF DESCRIPTION Medium-head hydropower plant Capacity 88 MW Head 150 m Design flow 75 m³/s 2 Francis turbines 22 km headrace tunnel Surge shaft Declined steel lined pressure shaft CLIENT GKI (Verbund - Austrian Hydro Power AG TIWAG- Tiroler Wasserkraftwerke AG Engadiner Kraftwerke AG) Recent Design Projects

22 REISSECK II PUMPED STORAGE PLANT Carinthia, Austria BRIEF DESCRIPTION Pumped storage plant Head 595 m Design flow 80 m³/s Capacity 430 MW Existing upper and lower reservoirs CLIENT Verbund-Austrian Hydro Power AG Department of Water & Energy

23 CLIENT DHPC / Ministry of Trade and Industry, Thimphu, Royal Government of Bhutan BRIEF DESCRIPTION High-head hydropower plant; 2x 5-jet Pelton-turbines; head 304 m; design flow 50 m³/s; capacity 114 MW; 7.8 km headrace tunnel; surge tank; 300 m steel lined pressure shaft; bifurcator; separate powerhouse and transformer caverns; access tunnels; tailrace tunnel; outlet structure, all designed using NATM OUR SERVICES Feasibility studies; On-site geological assessment; Preliminary design; Environmental Impact Assessment; Tender design; Preparation of tender documents; Preparation of technical specifications TOTAL PROJECT COSTS 152 Mio. PERIOD 2005 – ongoing DAGACHHU HYDROPOWER PROJECT Kingdom of Bhutan Department of Water & Energy

24 CLIENT DHPC / Ministry of Trade and Industry, Thimphu, Royal Government of Bhutan BRIEF DESCRIPTION High-head hydropower plant; 2x 5-jet Pelton-turbines; head 304 m; design flow 50 m³/s; capacity 114 MW; 7.8 km headrace tunnel; surge tank; 300 m steel lined pressure shaft; bifurcator; separate powerhouse and transformer caverns; access tunnels; tailrace tunnel; outlet structure, all designed using NATM OUR SERVICES Feasibility studies; On-site geological assessment; Preliminary design; Environmental Impact Assessment; Tender design; Preparation of tender documents; Preparation of technical specifications TOTAL PROJECT COSTS 152 Mio. PERIOD 2005 – ongoing DAGACHHU HYDROPOWER PROJECT Kingdom of Bhutan Consulting during Construction

25 Thank you for your attention Best solutions ensure enthusiasm