Presentation is loading. Please wait.

Presentation is loading. Please wait.

Nigel Titley. RIPE 54, 9 May 2007, Tallinn, Estonia. 1 RIPE NCC Certification Task Force Update Presented by Nigel Titley RIPE NCC.

Similar presentations


Presentation on theme: "Nigel Titley. RIPE 54, 9 May 2007, Tallinn, Estonia. 1 RIPE NCC Certification Task Force Update Presented by Nigel Titley RIPE NCC."— Presentation transcript:

1 Nigel Titley. RIPE 54, 9 May 2007, Tallinn, Estonia. http://www.ripe.net 1 RIPE NCC Certification Task Force Update Presented by Nigel Titley RIPE NCC Services WG May 9, 2007

2 Nigel Titley. RIPE 54, 9 May 2007, Tallinn, Estonia. http://www.ripe.net 2 Content History –Why Resource Certification? –Complexity of Project –Task Force Set-up Scope of the Certification Task Force Current Status Impacted Areas Next Steps

3 Nigel Titley. RIPE 54, 9 May 2007, Tallinn, Estonia. http://www.ripe.net 3 Why Resource Certification? Improve stability of the Internet Higher quality of allocation data Assertion validation procedure –Resource allocation: “RIPE NCC has allocated this resource to this party” Helpful to ensure routing security –Check route injection authority –Automate trust relationship Strengthen relationship between RIPE NCC and its members

4 Nigel Titley. RIPE 54, 9 May 2007, Tallinn, Estonia. http://www.ripe.net 4 Complexity of Project The certification project extends through all parts of the RIPE NCC, and so is a difficult and complicated challenge.

5 Nigel Titley. RIPE 54, 9 May 2007, Tallinn, Estonia. http://www.ripe.net 5 Task Force Set-up Certification TF assembled at RIPE 53 Six RIPE community members Good representation of region Set-up to be part of the trial deployment in the RIPE region during 2007 Tasked to formulate report for RIPE 55 for community discussion on way forward

6 Nigel Titley. RIPE 54, 9 May 2007, Tallinn, Estonia. http://www.ripe.net 6 Task Force Scope Identify requirements for a number resource certification service Follow developments and raise awareness among network operators Advise on impact –Service infrastructure, operational procedures –Utility of the authentication model –Policy considerations –Business relation between LIRs and RIPE NCC Provide recommendations for production development

7 Nigel Titley. RIPE 54, 9 May 2007, Tallinn, Estonia. http://www.ripe.net 7 Current Status The CA-TF defined a picture of the landscape The certification prototype has been delivered to support the identification of impacted areas To simplify the project five main areas will be the focus of research and discussion: –Business area (including impact on policies) –Services area –Technical area –RIR wide area –Application area

8 Nigel Titley. RIPE 54, 9 May 2007, Tallinn, Estonia. http://www.ripe.net 8 Business Area Changes in the registration services related to the Registration Authority function –authentication –business relationship (throughout the whole chain) Including end-users and PI space Resource transfers –role of the RIR Liability issues –Repository –certificate revocation and impact on end-users –certification of ERX space

9 Nigel Titley. RIPE 54, 9 May 2007, Tallinn, Estonia. http://www.ripe.net 9 Business Area – Impact on Policies How certificates are issued For ERX/legacy resource holders A transfer policy –Transfers are going to be possible –Within an RIR region from one party to another and between RIR regions –Policy to ensure: Avoiding transfer of the same resource to several parties at a time

10 Nigel Titley. RIPE 54, 9 May 2007, Tallinn, Estonia. http://www.ripe.net 10 Services Area Certificate repository –Interoperability between repositories (RIRs) Validation service Hosted certification services –implication of hosted resource management systems Shared certificate repositories –reliability requirements

11 Nigel Titley. RIPE 54, 9 May 2007, Tallinn, Estonia. http://www.ripe.net 11 Technical Area Specific areas for attention –Repository architecture –Performance implications

12 Nigel Titley. RIPE 54, 9 May 2007, Tallinn, Estonia. http://www.ripe.net 12 RIR-wide Area Specific areas for attention –Trust anchor(s) –Inter-RIR resource transfers –Deployment plan

13 Nigel Titley. RIPE 54, 9 May 2007, Tallinn, Estonia. http://www.ripe.net 13 Application Area Use for routing authorisation –Backward compatibility with RPSL database? –ROAs –Future secure routing protocols Automating provisioning Resource transfers

14 Nigel Titley. RIPE 54, 9 May 2007, Tallinn, Estonia. http://www.ripe.net 14 Next steps Make available documentation and code Report at RIPE 55


Download ppt "Nigel Titley. RIPE 54, 9 May 2007, Tallinn, Estonia. 1 RIPE NCC Certification Task Force Update Presented by Nigel Titley RIPE NCC."

Similar presentations


Ads by Google