Doc.: IEEE 802.11-13/0320r1 Submission March 2013 Osama Aboul-Magd (HuaweiTechnologies)Slide 1 P802.11ac Report to EC on Conditional Approval to go to.

Similar presentations


Presentation on theme: "Doc.: IEEE 802.11-13/0320r1 Submission March 2013 Osama Aboul-Magd (HuaweiTechnologies)Slide 1 P802.11ac Report to EC on Conditional Approval to go to."— Presentation transcript:

1 doc.: IEEE /0320r1 Submission March 2013 Osama Aboul-Magd (HuaweiTechnologies)Slide 1 P802.11ac Report to EC on Conditional Approval to go to Sponsor Ballot Date: Authors:

2 doc.: IEEE /0320r1 Submission March 2013 Osama Aboul-Magd (HuaweiTechnologies)Slide 2 Introduction This document contains the report to the IEEE 802 Executive Committee in support of a request for conditional approval to send IEEE P802.11ac Draft 5.0 to Sponsor Ballot. This document was approved during the plenary session of the working group on xx March –Passed in the Working Group xx yes, xx no, xx abstain

3 doc.: IEEE /0320r1 Submission WG Letter Ballot Results – P802.11ac March 2013 Osama Aboul-Magd (HuaweiTechnologies)Slide 3 Ballot ID Ballot Close Date TitleBallot Type Pool Return %Return Abstain %Abstain Approve Disapprove %Approve Feb 2012 Technical Letter Ballot for TGac Draft 2.0 Technical June 2012 First Recirculation Ballot for TGac draft 3.0 Recirculation Nov 2012 Second Recirculation Ballot for TGac draft 4.0 Recirculation Feb 2013 Third Recirculation Ballot for TGac draft 5.0 Recirculation LB 191 Post-Ballot vote change

4 doc.: IEEE /0320r1 Submission WG Letter Ballot Comments – P802.11ac March 2013 Osama Aboul-Magd (HuaweiTechnologies)Slide 4 Ballot ID Ballot Close Date Title Total Number of Comments received (Yes and No votes) Feb 2012Technical Letter Ballot for TGac draft (837 T, 655 E) June 2012First Recirculation Ballot for TGac draft (594 T, 261 E) Nov 2012Second Recirculation Ballot for TGac draft (250 T, 150 E) Feb 2013Third Recirculation Ballot for TGac draft (85 T, 56 E)

5 doc.: IEEE /0320r1 Submission Unsatisfied Technical comments by commenter March 2013 Osama Aboul-Magd (HuaweiTechnologies)Slide 5 VoterLB187LB188LB190LB191Total CHAMBELIN, Philipe (Deceased) Fischer, Matthew (Braodcom) Lei, Zhongding (I2R) Liu, Siyang Masour, Avi (Lantiq) Rison, Mark (Samsung) Shi, Wei (samsung) Wang, Haiguang (I2R) Wu, Zhanji (BUPT) Zhao, Qiang (China TTL) Total

6 doc.: IEEE /0320r1 Submission Unsatisfied Technical Comments – Topics March 2013 Osama Aboul-Magd (HuaweiTechnologies)Slide 6 TopicPHYMAC (frame formats) MAC (Others) Total CHAMBELIN, Philipe (Deceased) 1 1 Fischer, Matthew (Braodcom) Lei, Zhongding (I2R) 11 Liu, Siyang 1 1 Masour, Avi (Lantiq) 1 1 Rison, Mark (Samsung) 3 58 Shi, Wei (samsung) Wang, Haiguang (I2R) 11 Wu, Zhanji (BUPT) 11 Zhao, Qiang (China TTL) 11 Total 85215

7 doc.: IEEE /0320r1 Submission Unsatisfied Editorial comments by commenter March 2013 Osama Aboul-Magd (HuaweiTechnologies)Slide 7 VoterLB187LB188LB190LB191Total CHAMBELIN, Philipe (Deceased) Fischer, Matthew (Braodcom) Lei, Zhongding (I2R) Liu, Siyang Masour, Avi (Lantiq) Rison, Mark (Samsung) Shi, Wei (samsung) Wang, Haiguang (I2R) Wu, Zhanji (BUPT) Zhao, Qiang (China TTL) Total 10001

8 doc.: IEEE /0320r1 Submission Unsatisfied Editorial Comments – Topics March 2013 Osama Aboul-Magd (HuaweiTechnologies)Slide 8 TopicPHYMAC (frame formats) MAC (Others) Total CHAMBELIN, Philipe (Deceased) Fischer, Matthew (Braodcom) Lei, Zhongding (I2R) Liu, Siyang Masour, Avi (Lantiq) Rison, Mark (Samsung) 11 Shi, Wei (samsung) Wang, Haiguang (I2R) Wu, Zhanji (BUPT) Zhao, Qiang (China TTL) Total 1

9 doc.: IEEE /0320r1 Submission Unsatisfied comments The composite of all unsatisfied comments and the resolutions approved by the comment resolution committee received during working group ballot may be found in the embedded document on the right: –Double click on the icon to the right to open this. A copy of this same data presented using MyBallot access database report format is attached. –Double click on the icon to the right to open this. March 2013 Osama Aboul-Magd (HuaweiTechnologies)Slide 9

10 doc.: IEEE /0320r1 Submission TGac Timeline March 2013 Osama Aboul-Magd (HuaweiTechnologies)Slide 10 OpenClose Fourth recirculation (TGac D5.0)20-March-1303-April-13 First sponsor ballot20-April-1320-May-13 Second sponsor ballot20-July-1304-Aug-13 Third sponsor ballot04-Sept-1319-Sept-13 Fourth sponsor ballot19-Oct-133-Nov-13 Fifth sponsor ballot3-Dec-1318-Dec-13 EC to RevCom Jan-14 RevCom to SB Feb-14

11 doc.: IEEE /0320r1 Submission March 2013 Osama Aboul-Magd (HuaweiTechnologies)Slide 11 References


Download ppt "Doc.: IEEE 802.11-13/0320r1 Submission March 2013 Osama Aboul-Magd (HuaweiTechnologies)Slide 1 P802.11ac Report to EC on Conditional Approval to go to."