Presentation is loading. Please wait.

Presentation is loading. Please wait.

Doc.: IEEE 802.11-13/0726r1 Submission July 2013 Rich Kennedy (BlackBerry)Slide 1 P802.11af Report to EC on Conditional Approval to go to Sponsor Ballot.

Similar presentations


Presentation on theme: "Doc.: IEEE 802.11-13/0726r1 Submission July 2013 Rich Kennedy (BlackBerry)Slide 1 P802.11af Report to EC on Conditional Approval to go to Sponsor Ballot."— Presentation transcript:

1 doc.: IEEE /0726r1 Submission July 2013 Rich Kennedy (BlackBerry)Slide 1 P802.11af Report to EC on Conditional Approval to go to Sponsor Ballot Date: Authors:

2 doc.: IEEE /0726r1 Submission July 2013 Rich Kennedy (BlackBerry)Slide 2 Introduction This document contains the report to the IEEE 802 Executive Committee in support of a request for conditional approval to send IEEE P802.11af Draft 5.0 to Sponsor Ballot. This document was approved during the plenary session of the working group on 17 July –Passed in the Working Group xx yes, x no, x abstain

3 doc.: IEEE /0726r1 Submission WG Letter Ballot Results – P802.11af July 2013 Rich Kennedy (BlackBerry)Slide 3 Ballot ID Ballot Close Date TitleBallot Type Pool Return %Return Abstain %Abstain Approve Disapprove %Approve Draft P802.11af_D2.0.pdfTechnical Draft P802.11af_D3.0.pdf first recirculation Recirculation Draft P802.11af_D4.0.pdf second recirculation Recirculation Draft P802.11af_D5.0.pdf third recirculation Recirculation LB196 Post Ballot vote changes

4 doc.: IEEE /0726r1 Submission WG Letter Ballot Comments – P802.11af July 2013 Rich Kennedy (BlackBerry)Slide 4 Ballot ID Ballot Close Date Title Total Number of Comments received (Yes and No votes) Technical Letter Ballot for TGaf draft Technical Letter Ballot for TGaf draft First Recirculation Ballot for TGaf draft Second Recirculation Ballot for TGaf draft Third Recirculation Ballot for TGaf draft

5 doc.: IEEE /0726r1 Submission Unsatisfied Technical comments by commenter July 2013 Rich Kennedy (BlackBerry)Slide 5 VoterLB189LB192LB195LB196Total Total

6 doc.: IEEE /0726r1 Submission Unsatisfied Technical Comments – Topics July 2013 Rich Kennedy (BlackBerry)Slide 6 TopicPHYMAC (frame formats) MAC (Others) GeneralTotal Total

7 doc.: IEEE /0726r1 Submission Unsatisfied comments The composite of all unsatisfied comments and the resolutions approved by the comment resolution committee received during working group ballot may be found in the embedded document on the right: –Double click on the icon to the right to open this. A copy of this same data presented using MyBallot access database report format is attached. –Double click on the icon to the right to open this. July 2013 Rich Kennedy (BlackBerry)Slide 7

8 doc.: IEEE /0726r1 Submission TGaf Timeline July 2013 Rich Kennedy (BlackBerry)Slide 8 OpenClose Fourth recirculation (TGaf D5.0) First sponsor ballotxx-Sept-13 Second sponsor ballotxx-Oct-13 Third sponsor ballotxx-Nov-13 Fourth sponsor ballotxx-Jan-14 Fifth sponsor ballotxx-Feb-14 EC to RevCom Jan-14 RevCom to SB Feb-14

9 doc.: IEEE /0726r1 Submission July 2013 Rich Kennedy (BlackBerry)Slide 9 References


Download ppt "Doc.: IEEE 802.11-13/0726r1 Submission July 2013 Rich Kennedy (BlackBerry)Slide 1 P802.11af Report to EC on Conditional Approval to go to Sponsor Ballot."

Similar presentations


Ads by Google