Presentation is loading. Please wait.

Presentation is loading. Please wait.

Doc.: 18-13/0093r1 Submission July, 2013 Michael Lynch, MJ Lynch & Associates LLCSlide 1 RR-TAG Closing Report Notice: This document has been prepared.

Similar presentations


Presentation on theme: "Doc.: 18-13/0093r1 Submission July, 2013 Michael Lynch, MJ Lynch & Associates LLCSlide 1 RR-TAG Closing Report Notice: This document has been prepared."— Presentation transcript:

1 doc.: 18-13/0093r1 Submission July, 2013 Michael Lynch, MJ Lynch & Associates LLCSlide 1 RR-TAG Closing Report Notice: This document has been prepared to assist IEEE 802.18. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Date: July, 2013 Authors:

2 doc.: 18-13/0093r1 Submission July, 2013 Michael Lynch, MJ Lynch & Associates LLCSlide 2 Overview This document reports on the regulatory matters considered and outputs from the July, 2013 meeting. Specific documents/actions were approved by the RR-TAG in response to the regulatory proceedings reviewed and inputs from various WGs. The RR-TAG is input driven. The attendance varies depending on the topics & documents being considered. At this particular meeting we approved four documents, one of which is in support of an FCC filing by IEEE USA. As was begun several meetings earlier final approval of documents is normally held on Thursdays during AM1 and AM2. Some find that we still need the afternoon sessions to complete our work in a more thorough manner. To do so requires prior permission of the EC chair. As is normal the meeting approved the 802.18 chair convening conference calls to deal with regulatory matters that come up between Plenary sessions.

3 doc.: 18-13/0093r1 Submission July, 2013 Michael Lynch, MJ Lynch & Associates LLCSlide 3 FCC and ITU-R Items Approved in July The RR-TAG approved and then submitted to the EC for their approval four documents for the US FCC address and ITU-R –Document 18-13/0087r04, reply-comments-of-ieee-802-on-5-ghz- nprm-fcc-docket-13-49, for review by EC and forward to the FCC. The Chair of 802.18 is authorized to make editorial changes as necessary. –Vote: 5 Yes 0 No 0 Abstain –Document 18-13/0088r02, second response to a request from ITU- R Working Party 5D toward the development of Revision 12 of Recommendation. ITU-R M.1457, for review by the EC and forwarding to ITU Liaison. The Chairs of 802.18 and 802.16 are authorized to make editorial changes as necessary –Vote: 5 Yes 0 No 0 Abstain

4 doc.: 18-13/0093r1 Submission July, 2013 Michael Lynch, MJ Lynch & Associates LLCSlide 4 FCC and ITU-R Items Approved in July Continued: –document 18-13/0089r3, 802-support-for-petitions-for- reconsideration-of-progeny-m-lms-order, for review by EC and forward to the FCC. The Chair of 802.18 is authorized to make editorial changes as necessary. –Vote: 4 Yes 0 No 1 Abstain –Document 18-13/0090r01, Letter Supporting IEEE-USA Petitioning FCC for Spectrum Ruling to Spur New Technologies (>95GHz), for review by the EC and forwarding to FCC. The Chair of 802.18 is authorized to make editorial changes as necessary. –Vote: 5 Yes 0 No 0 Abstain All four documents were approved by the EC on the Consent Agenda at the closing session on Friday afternoon.

5 doc.: 18-13/0093r1 Submission July, 2013 Michael Lynch, MJ Lynch & Associates LLCSlide 5 Items to be considered in November The RR-TAG will have to review the status of Document 18- 13/0090r01 supporting IEEE USA’s position regarding the use of spectrum above 95 GHz. –As of the close of the July meeting there was no “RM” (Rule Making) number assigned to the IEEE USA contribution. –It may be that IEEE 802, through the newly enacted “sole voice” concept, may have to make a contribution not linked to the IEEE USA contribution. –Therefore it was felt, and the EC chair agreed, that he needed to be present at any meeting considering the status of Document 18- 13/0090r1.. 802.18 is contribution driven and it is fair to expect that other matters will present themselves by the time of the November meeting in Dallas.


Download ppt "Doc.: 18-13/0093r1 Submission July, 2013 Michael Lynch, MJ Lynch & Associates LLCSlide 1 RR-TAG Closing Report Notice: This document has been prepared."

Similar presentations


Ads by Google