Presentation is loading. Please wait.

Presentation is loading. Please wait.

Doc.: IEEE 802. 18-07-0065-00-0000 Submission July 2007 Michael Lynch, Nortel Networks EC IMT-Advanced Update RR-TAG was directed to take this project.

Similar presentations


Presentation on theme: "Doc.: IEEE 802. 18-07-0065-00-0000 Submission July 2007 Michael Lynch, Nortel Networks EC IMT-Advanced Update RR-TAG was directed to take this project."— Presentation transcript:

1 doc.: IEEE 802. 18-07-0065-00-0000 Submission July 2007 Michael Lynch, Nortel Networks EC IMT-Advanced Update RR-TAG was directed to take this project –Normal route for outputs to ITU-R –Has experience with developing joint views First meeting held during Londonium interim –Well attended, definite interest in moving forward Work was done F2F and by conference calls –IMT-Advanced Requirements input to ITU-R WP8F submitted 15 May to IEEE-SA ITU-R liaison

2 doc.: IEEE 802. 18-07-0065-00-0000 Submission July 2007 Michael Lynch, Nortel Networks 17 July Meeting Agenda Updated work done at most recent WP8F meeting –Provided by Adam Pollard – chair of the WP8F drafting group Discussion/decision on further requirements input to WP8F –Same work method as previously used –Interested WGs develop inputs, harmonize in 802.18 –Completion date Q4 2007 –Work to start in September

3 doc.: IEEE 802. 18-07-0065-00-0000 Submission July 2007 Michael Lynch, Nortel Networks Proposed Timeline - Requirements July IEEE 802 plenary –Decision on IMT-Advanced Requirement made –802.18 requirements correspondence group continues September wireless interim –Work begins and continues with conference calls if needed November 2007 IEEE 802 Plenary –Contribution completed and approved –Submitted to ITU-R

4 doc.: IEEE 802. 18-07-0065-00-0000 Submission July 2007 Michael Lynch, Nortel Networks 17 July Meeting Agenda cont Discussion/decision on submission of a joint IEEE 802 technology input to ITU-R WP8F –Same work method as used for requirements –Tentative completion date Q4 2008 –No decision taken Some expressed the view that it would be too difficult to achieve a joint IEEE 802 input Will be considered again at the November plenary

5 doc.: IEEE 802. 18-07-0065-00-0000 Submission July 2007 Michael Lynch, Nortel Networks Proposed Timeline - Technology July IEEE 802 plenary –Decision on IMT-Advanced Technology made September wireless interim –802.18 technology correspondence group established and scope of work defined November 2008 IEEE 802 Plenary –Contribution completed and approved –Submitted to ITU-R


Download ppt "Doc.: IEEE 802. 18-07-0065-00-0000 Submission July 2007 Michael Lynch, Nortel Networks EC IMT-Advanced Update RR-TAG was directed to take this project."

Similar presentations


Ads by Google