0 NERC PC Issues Update WECC PCC Meeting NERC PC Issues Update WECC PCC Meeting John Simpson, Reliant Energy Planning Coordination Committee Albuquerque,

Similar presentations


Presentation on theme: "0 NERC PC Issues Update WECC PCC Meeting NERC PC Issues Update WECC PCC Meeting John Simpson, Reliant Energy Planning Coordination Committee Albuquerque,"— Presentation transcript:

1 0 NERC PC Issues Update WECC PCC Meeting NERC PC Issues Update WECC PCC Meeting John Simpson, Reliant Energy Planning Coordination Committee Albuquerque, NM March 6-7, 2008

2 1 PC Current Activities  Reliability Concepts Document  Reliability Fundamentals Working Group approved  Joint PC/OC WG  Charged to oversee continued development of document  PC approved posting document for comment  Intent is document will be a “living” document

3 2 PC Current Activities  Reliability Metrics  Reliability Metrics Working Group Formed  Joint PC/OC WG  WECC Member: Brian Furumasu, BPA  Provides input to NERC Reliability Metrics and Benchmarking Program  WG has developed a 3 year work plan

4 3 PC Current Activities  Integration of Variable Generation Task Force (IVGTF)  Joint PC/OC TF  Charge to document reliability issues and recommend standards for integrating variable generation  Developing draft outline of report/white paper  Draft report to be presented to PC in Sept 2008  Final report and recommendations to be approved in Dec 2008  Meeting to present results to public in Jan 2009

5 4 PC Current Activities  Reliability Assessment Improvement Task Force (RAITF)  Developing 3 year plan for RA improvements with 3 objectives:  Improve consistency and transparency  Increase granularity  Assess emerging industry issues  2008 Work Plan  Better way to deal with resource deliverability  Enhance capacity definitions  LTRA guidebook

6 5 PC Current Activities  Reliability Assessment Improvement Task Force (RAITF) – continued  2008 Work Plan – continued  Appropriate metrics  Consistent treatment of variable generation  Consistent treatment and integration of DSM  Use of scenario testing for emerging issues

7 6 PC Current Activities  Reliability Assessment Improvement Task Force (RAITF) – continued  2009/2010 Work Plan  Revise seasonal reporting cycle  Use of risk assessments and probability studies  Enhance subregional granularity  Transmission reliability issues and metrics  Off-peak reliability assessments  Voltage/reactive reserves  Include stability results  Generation/fuel interdependency

8 7 PC Current Activities  Reliability Assessment Subcommittee (RAS)  Emerging Issue Identification  PC to prioritize the top 5 of 7 identified by RAS  Greenhouse Gas Reductions  Fuel Storage and Transportation  Global demand for products/energy along with off-shoring/imports of raw and finished materials  Reliability impacts of industry changes resulting in load modifications & from generation exempt from the BPS standards  Aging transmission infrastructure in the 21st century - replacing and upgrading  Water usage for electric generation  Mercury emission reductions

9 8 PC Current Activities  Transmission Availability Data System Task Force (TADS)  Phase II Preliminary Report on PC Agenda for March 2008  Plan to post report in Apr 2008  Final report due in Aug 2008  PC approval of final report in Sept 2008  Board approval in Oct 2008  Begin reporting in 2009

10 9 PC Current Activities  Ameren TPL Standards Interpretation Request  Third attempt at interpretation  PC subgroup provided clarifications to comments submitted in latest balloting


Download ppt "0 NERC PC Issues Update WECC PCC Meeting NERC PC Issues Update WECC PCC Meeting John Simpson, Reliant Energy Planning Coordination Committee Albuquerque,"