Presentation is loading. Please wait.

Presentation is loading. Please wait.

Concept Development & Validation

Similar presentations


Presentation on theme: "Concept Development & Validation"— Presentation transcript:

1 Concept Development & Validation
Verification and Validation Summit Maureen Molz Manager, Concept Development & Validation – Technical Center Branch October 10, 2012

2 Advanced Operational Concepts Division (ANG-C4)
John Marksteiner (A) ANG-C4 Concept Analysis Branch Mike Paglione ANG-C41 Concept Development & Validation – Headquarters Branch Cynthia Morris ANG-C42 Concept Development & Validation – Technical Center Branch Maureen Molz ANG-C43 Andrew Crowell Andrew Fabian Doug Frye Marie Kee Nicole Nelson Albert Schwartz Chu Yao Christina Young Philip Bassett Charles (Marc) Buntin Donna Creasap Kevin Hatton Levent Ileri Kristina Carr Steven Ferra Anton Koros Richard Lanier Sherri Magyarits Lisa Smith October 10, 2012 Maureen Molz, Manager ANG-C43

3 Maureen Molz, Manager ANG-C43
Our Mission The mission of the Concept Development & Validation Branch is to support concept development and validation activities including development of NAS Concept of Operations (ConOps) and requirements for future National Airspace Systems (NAS) operations and technologies. October 10, 2012 Maureen Molz, Manager ANG-C43

4 NAS Midterm ConOps Development
Based on Operational Sustainments NextGen Midterm ConOps Concept Gaps Intended to Serve as baseline for new concepts/ideas entering i2i process Provide foundation for developing operational requirements Generate discussion with stakeholders Identify areas for concept development and validation October 10, 2012 Maureen Molz, Manager ANG-C43

5 NAS Conops - New Baseline
Based on Operational Sustainments NextGen Midterm Conops Concept Gaps Compilation of accepted artifacts OIs/OSs NextGen Midterm CONOPS Annotated Outline for NAS CONOPS Addendum of Proposed Changes Intended to Serve as baseline for new concepts/ideas entering i2i process Provide foundation for developing operational requirements Generate discussion with stakeholders Identify areas for concept development and validation This will be submitted for approval in first CSG Meeting 17 Oct 2012 October 10, 2012 Maureen Molz, Manager ANG-C43

6 Library of Concepts by Level
Level 2 (4 documents) Management and Distribution of Flight Data Surveillance Broadcast Services Integrated Arrival, Departure, and Surface Operations UAS Integration into the NAS ConOps October 10, 2012 Maureen Molz, Manager ANG-C43

7 Library of Concepts by Level
Level 3 (33 documents)

8 Library of Concepts by Level (cont.)
Level 4 (33 documents) Aeronautical Information Management, Segment 2 Meteorological and Aeronautical Planning System Enroute Automation Capabilities_1.0_2008.pdf Network Enabled Weather and 4D Weather Data Cube Reroute Impact Assessment NextGen Weather Processor Time Based Flow Management NextGen Enterprise Information Systems Security Go Button Security Integrated Tool Set Multifunctional Phased Array Radar 3D Path for Arrival Management Mobile Airport Surveillance Radar Conflict Resolution Advisories Surface Trajectory Based Operations DST Expanding RNAV Operations with DME to DME Capabilities STBO 2D Taxi Route Generation Lateral Offset STBO Airport Configuration Mgmt Multisector Planner Specialist Function STBO Collaborative Departure Queue Mgmt Oceanic Tailored Arrivals STBO Departure Runway Asgmt System Wide Information Management Seg1 Aviation Safety Information and Analysis STBO Surface Conformance Monitoring NAS Voice System Surveillance Interface Modernization Precision Runway Monitor Replacement Acquisition Tower Flight Data Manager Relative Position Indicator Initial Tailored Arrivals October 10, 2012 Maureen Molz, Manager ANG-C43

9 New Approach to Concept Hierarchy (Notional/Draft)
Level 1 (Enterprise) NextGen Mid-Term ConOps for the NAS CATM Flight & State Data Management Flow Contingency Management Capacity Management FLEX Separation Management Trajectory Management Flight & State Data Management COMMON Services COMM A/G Voice & Data Services Air/Air Data Services G/G Voice & Data Services Net-Centric Services NAV Performance Based Navigation SURV Surveillance & Broadcast Services HD Separation Management Trajectory Management Flight & State Data Management RWI Trajectory Management Flight & State Data Management Level 2 (Service) SSE Flight & State Data Management Environmental Management TBO Separation Management Trajectory Management Capacity Management Flight & State Data Management FAC Capacity Management Flight & State Data Management Note: Mission Services (NAS EA SV-4) mapped to solution Sets TBD – OI/Program level October 10, 2012 Maureen Molz, Manager ANG-C43

10 Concept Maturity Levels
Edit/redo for readability October 10, 2012 Maureen Molz, Manager ANG-C43

11 Concept Steering Group (CSG)
Responsibilities include Approve NAS ConOps, lower level ConOps, and NAS ConOps change proposals Validate the need for new concepts/ ideas Determine validity and feasibility of proposed concepts/ideas Review and approve enterprise level shortfall analysis, new operational improvements, operational sustainments, and operational requirements Assess concept maturity during concept development lifecycle October 10, 2012 Maureen Molz, Manager ANG-C43

12 General Flow of New Idea/Proposal
Service Analysis Phase of the I2I Process 2.1 Collect & assess ideas for NAS ConOps determination and initiate R&D (as needed) ? 2.2 Enter idea/request into NAS ConOps 2.4 Conduct initial NAS ConOps decomp & develop service needs & shortfall 2.6 Prepare for portfolio allocation 2.3 Document ideas in NAS ConOps 2.5 Allocate service needs to OI/OS/OC 2.7 CRD readiness/ capture team determination Strategic Inputs Yes Yes No No Decompose ConOps changes into service needs/ Develop preliminary shortfall analysis Change to the NAS? CSG approves CML work products and conducts periodic reviews for continued concept support Sub-mission/ Review Validity and feasibility analysis CSG endorsement of concept NMB ratification of concept Document changes to NAS ConOps NMB Ratifies NAS ConOps Yes Transition CSG Process Alignment with the Mission Analysis phase of Acquisition Management System (AMS) Additionally aligns with Service Analysis of the Ideas to In-Service (I2I) process Idea to In Service Management (I2I) process Includes stakeholders from FAA lines of business Increases emphasis on Service Analysis (e.g., documenting operational shortfalls and requirements) Identified (and NMB approved) decision authorities; need to establish lower level roles and responsibilities (RASI)* * R=responsible, A=accountable, S=support, I=input No No Application returned to PM w/ reasoning; process ends Assess & Approve Evaluate Generalized Flow of CSG Scope October 10, 2012 Maureen Molz, Manager ANG-C43

13 Concept Steering Group (CSG) (cont.)
Concept Steering Group, Chair: ANG-C Director level Final decision on NAS ConOps changes Brief NMB on NAS ConOps changes, as required Concept Steering Work Group (CSWG), Chair: ANG-C4 Front line managers; decision making authority Gateway between CSG and service organizations Advisory participation NATCA Professional Aviation Safety Specialist (PASS) Kickoff meeting; 10/17/2012 Agreement of roles & responsibilities Finalize CSG Standard Operating Procedures (SOP) October 10, 2012 Maureen Molz, Manager ANG-C43

14 FAA Concept of Operations for UAS Integration into the NAS
Project Description Development of a Concept of Operations document for integration of UAS operations into the NAS Narrative aligned with end of Integration milestone in FAA Civil UAS Integration Roadmap Represents FAA position on how UAS may be safely integrated - written primarily from an air traffic management/air traffic control perspective Delivered Version 2.0 to JPDO Sep 28, 2012 For inclusion in the Congressionally-mandated UAS Comprehensive Plan, due Nov 2012 New Slide October 10, 2012 Maureen Molz, Manager ANG-C43


Download ppt "Concept Development & Validation"

Similar presentations


Ads by Google