Presentation is loading. Please wait.

Presentation is loading. Please wait.

Princeton Wastewater Servicing Study

Similar presentations


Presentation on theme: "Princeton Wastewater Servicing Study"— Presentation transcript:

1 Princeton Wastewater Servicing Study
Public Information Centre No. 2 April 11, 2012 Slide 1

2 Water System Update System will be commissioned in May and ready for connections All properties will receive notification at that time CSAP program has been reviewed by Council and the maximum cost to residents for water has been capped at $9,500. Princeton residents will pay will this amount and not the actual cost of $12,600 (after CSAP grant).

3 Presentation Agenda Finalized Problem/Opportunity Statement
Alternatives Evaluation of Alternatives and Evaluation Criteria Evaluation Results Public and Agency Consultation Study Schedule and Next Steps Slide 2

4 Purpose of PIC To present, review and discuss results of preliminary evaluation of alternatives To gain input from the Community on the information presented Slide 3

5 Study Background During the Princeton Water Servicing Study, the County received a petition signed by 130 Princeton residents, requesting that a wastewater servicing study be completed for Princeton Upon receiving the petition: Oxford County Public Works and Public Health and Emergency Services Departments reviewed all un-serviced and partially serviced villages A priority list was developed for wastewater servicing studies based on public health and environmental concerns Princeton was identified as having the highest priority for investigating wastewater servicing alternatives Slide 4

6 Study Objective Princeton Wastewater Servicing Study Objective
Overall objective of the Princeton Wastewater Servicing Study is to develop a wastewater servicing plan for the Community of Princeton that is environmentally responsible, socially acceptable and economically sustainable Slide 5

7 Class Environmental Assessment Process
Phase 1 Problem or Opportunity Existing Data Collection Review and Analysis Princeton Wastewater Servicing Study involves completion of Phases 1 to 4 of the Municipal Class EA process Phase 2 Alternative Solutions Development and Evaluation of Alternative Solutions We Are Here Phase 3 Alternative Design Concepts for Preferred Solution Development and Evaluation of Alternative Design Concepts for Implementation of the Preferred Alternative Phase 4 Environmental Study Report (ESR) Completion of an Environmental Study Report (ESR) and placement on public record for 30-day review period Phase 5 Implementation Design and Construction of the Preferred Solution Slide 6

8 Existing Conditions Wastewater treatment is currently provided by on-site wastewater septic tank systems Analysis of existing septic systems was completed to: Estimate the age and status of existing systems based on available records Identify what type of replacement wastewater system could be installed on each property based on the requirements of the current Ontario Building Code Slide 7

9 Existing Septic Systems
Existing System Age Existing Septic Systems Number of systems that are now between 0 and 25 years old (Constructed between 1987 and the present) 37 (18%) Number of systems that are now between 25 and 35 years old (Constructed between 1977 and 1987) 16 (8%) Number of systems that are now more than 35 years old (Constructed before 1977) 154 (74%) Total number of systems 207 (100%) Life span of a typical septic system is 20 to 25 years Some systems can function effectively for 35 years Slide 8

10 Ontario Building Code The Ontario Building Code (OBC) specifies requirements for on-site wastewater treatment systems. Key requirements are: Allows for the installation of conventional and advanced treatment Class 4 sewage system where technology selection and tile bed size is based on local soil and groundwater conditions Specifies a number of required clearance distances between the tile bed and a building, and the tile bed and the property line A replacement Class 4 system can be installed where the required clearance distances are not met under the Compliance Alternatives section of the Ontario Building Code as long as the capacity of the replacement system is not greater than the existing system Slide 9

11 Current Ontario Building Code Requirements
Existing Septic Systems Estimated number of properties where the existing system is less than 35 years old (constructed in 1977 or later) 52 (25%) Estimated number of properties with existing systems more than 35 years old that can accommodate a conventional septic system 90 (43%) Estimated number of properties with existing systems more than 35 years old that can accommodate an advanced treatment system Estimated number of properties with existing systems more than 35 years old that cannot accommodate a conventional or advanced treatment system and will require a holding tank 12 (6%) Total number of systems 207 (100%) Slide 10

12 Summary of Existing Conditions
Many existing septic systems will need to be replaced in the near term due to age Replacement systems will need to comply with the current Ontario Building Code It is estimated that 43% of existing septic systems are able to accommodate a new conventional septic system Remaining properties will require an advanced treatment system or a holding tank Slide 11

13 Future Growth in Princeton
Moderate growth within the existing community boundary is anticipated Existing population (residential and equivalent non-residential) is estimated to be 833 persons including 629 residents plus an equivalent non-residential population of 204 persons Future population (residential and equivalent non-residential) is estimated to be 1,518 persons Slide 12

14 Future Growth in Princeton
Projected future wastewater flow for the Community of Princeton is 455 m3/d Slide 13

15 Problem/ Opportunity Statement
Develop a wastewater servicing plan for the existing Community of Princeton that is environmentally responsible, socially acceptable and economically sustainable It is estimated that 154 of 207 existing septic systems (74% of all existing systems) are now more than 10 years older than their design life and will require replacement in the short term due to their age Slide 14

16 Alternative Solutions
Description Alternative 1 – “Do Nothing” No action to address existing systems by either property owners or the County Alternative 2 – Upgrade Existing Private On-Site Wastewater Treatment Systems Upgrade existing systems to Class 4 or 5 systems to meet current Ontario Building Code requirements. Individual property owners would upgrade their systems when needed over time Alternative 3 – New communal wastewater collection system and wastewater treatment system to service Princeton Construction of lower cost septic tank effluent type wastewater collection system and new treatment facility in Princeton to collect and treat wastewater Alternative 4 – New wastewater collection system and diversion of wastewater for treatment to the Woodstock Wastewater Treatment Plant (WWTP) Construction of conventional sewers, a new pumping station, a new forcemain and upgrades at the Woodstock WWTP to convey and treat wastewater from Princeton at the Woodstock WWTP Slide 15

17 Alternative Solutions
Description Alternative 5 – New wastewater collection system and diversion of wastewater for treatment to the Drumbo Wastewater Treatment Plant (WWTP) Construction of conventional sewers, a new pumping station, a new forcemain and upgrades at the Drumbo WWTP to convey and treat wastewater from Princeton at the Drumbo WWTP Alternative 6 – New wastewater collection system and diversion of wastewater for treatment to the Paris WWTP Construction of conventional sewers, a new pumping station, a new forcemain and upgrades at the Paris WWTP to convey and treat wastewater from Princeton at the Paris WWTP in Brant County Slide 16

18 Evaluation of Alternatives
A broad range of evaluation criteria was used to evaluate the alternative solutions Alternatives identified as having high impacts that could not be mitigated were eliminated from further consideration Evaluation was conducted to identify the most feasible alternatives for further evaluation Slide 17

19 Technical Environment
Evaluation Criteria Natural Environment Impacts on water resources Impacts on terrestrial resources Impacts on groundwater resources Social Environment Impacts on residents during operation Impacts on residents during construction Impacts on future development Technical Environment System complexity Increased operating requirements Need for additional studies Approval requirements Risk Economic Environment Estimated capital cost Estimated Annual O&M cost 20 Year Life Cycle Cost Potential to stage implementation Need for property acquisition Slide 18

20 Evaluation of Alternatives
Summary of Evaluation Alternative 1 – “Do Nothing” Discharges from non-functioning septic systems will impact area watercourses, terrestrial resources, and groundwater systems. High potential for odour and nuisance impacts from non-functioning septic systems. No additional costs over existing. Alternative 2 – Upgrade Private On-Site Wastewater Treatment Systems Alternative will reduce pollutant loadings to the environment. Development will be allowed to proceed on new lots in Village that can accommodate a septic system. Where existing systems are being replaced, compliance alternatives provisions of the Ontario Building Code can be used to allow installation of a conventional system that does not meet the clearance requirements as long as the capacity of the new system does not exceed the old system capacity. Individual property owners will be responsible for replacing their existing systems. Capital cost of $3.0M and Life cycle cost of $4.7M. Residents will not be eligible for Community Servicing Assistance Plan Funding (CSAP). Alternative 3 – New Communal Wastewater Collection System and Treatment System to Service Princeton Potential operations and construction impacts can be mitigated through good site selection. Increase in system complexity and operating requirements for Oxford County. Capital cost of $7.2M and Life cycle cost of $8.7M. Implementation of alternative can be staged. Slide 19

21 Evaluation of Alternatives
Summary of Evaluation Alternative 4 – New Wastewater Collection System and Diversion of Wastewater for Treatment to the Woodstock Wastewater Treatment Plant (WWTP) Alternative will reduce pollutant loadings to the environment. An exception to the intra-basin transfer restriction will be needed to allow wastewater generated in the Grand River Watershed to be discharged to the Upper Thames River Watershed. Capital cost of $10.0M and Life cycle cost of $10.6M. High risk that intra-basin transfer exception will not be granted. Alternative 5 – New Wastewater Collection System and Diversion of Wastewater for Treatment to the Drumbo WWTP Potential operations and construction impacts can be mitigated through good site selection. Increase in system complexity and operating requirements for Oxford County. Capital cost of $12M and Life cycle cost of $14.8M. Alternative 6 – New Wastewater Collection System and Diversion of Wastewater for Treatment to the Paris WWTP in Brant County Risk that an Inter-County agreement could not be successfully negotiated. Capital cost of $10.6M and Life cycle cost of $12.8M. Slide 20

22 Summary of Evaluation Results
Alternative Solution 1 - “Do Nothing” was eliminated from further consideration as: High impacts on water resources, groundwater resources, adjacent land owners, and the risk of continued groundwater contamination Alternative Solution 4 - New Wastewater Collection System and Diversion of Wastewater for Treatment to the Woodstock Wastewater Treatment Plant (WWTP) was eliminated from further consideration due to: High risk that the required intra-basin transfer exception will not be granted Slide 21

23 Summary of Evaluation Results
Alternative Solution 5 – New Wastewater Collection System and Diversion of Wastewater for Treatment to the Drumbo WWTP was eliminated from further consideration due to: High Life Cycle Costs and requirements for additional study Alternative Solution 6 - New Wastewater Collection System and Diversion of Wastewater for Treatment to the Paris WWTP was eliminated from further consideration due to: Potentially high risk that negotiations could be unsuccessful and high Life Cycle Costs Slide 22

24 Summary of Evaluation Results
Two Alternatives were identified to be carried forward for more detailed evaluation, namely: Alternative 2 – Upgrade Private On-Site Wastewater Treatment Systems Alternative 3 – New Wastewater Collection System and Treatment System to Service Princeton Slide 23

25 Alternative 2 – Upgrade Existing On-Site Wastewater Treatment Systems
Alternative requirements Replacement of existing systems with Class 4 and Class 5 systems that meet the current Ontario Building Code (OBC) requirements where existing systems have exceeded their design life. Specific requirements are: 90 conventional Class 4 sewage systems 52 Advanced treatment Class 4 sewage systems 12 Class 5 sewage systems (holding tanks) Estimated Capital Cost $3.0M (conceptual level cost estimate) Estimated Annual O&M Cost $127K (total cost to all residents) Potential Implementation Period Implementation would be the responsibility of individual property owners and would proceed on an as-needed basis as existing systems require replacement Concerns/ Issues with this Alternative The installation of new on-site wastewater systems for new development properties in the existing Village boundary can only proceed if the property can accommodate the installation of a Class 4 sewage system Community Servicing Assistance Plan (CSAP) funding will not be available to property owners Where OBC Compliance Alternatives are used to support the replacement of an existing system, no increase in capacity will be allowed Slide 24

26 Alternative 2 – O&M Costs
Operating and maintenance costs/property for a Class 4 system are estimated to be in the range of $100/yr Operating and maintenance costs/ property for a Class 5 system are estimated to range from: $1,600/yr for single occupancy with a low wastewater generation rate to $13,000/yr for 4 person occupancy and a high wastewater generation rate Slide 25

27 Alternative 3 Alternative 3 – New Communal Wastewater Collection and Treatment System to Service Princeton Alternative requirements Construction of new STEP/STEG communal wastewater collection system, a new pumping station, and a Recirculating Sand Filter treatment facility with a subsurface discharge Estimated Capital Cost $7.2M (Conceptual level cost estimate) Estimated Annual O&M Cost $114K Potential Implementation Period Implementation of new treatment facility can be staged to meet servicing requirements Concerns/ Issues with this Alternative Property acquisition will be required for a new treatment facility in Princeton Notes: STEP/ STEG – septic tank effluent pumping system/ septic tank effluent gravity system Estimated capital cost does not include costs of any works on private property (connection and interceptor tank) Existing residents will receive CSAP funding and will pay $12,500/ connection. CSAP funding does not cover costs for required works located on private property Slide 26

28 Short Listed Alternatives – Estimated Costs
Upgrade Existing Private On-Site Wastewater Treatment Systems Alternative 3 – New Communal Wastewater Collection System and Treatment System to Service Princeton Estimated Capital Cost $3.0M $7.2M Estimated Capital Cost/ Lot $6,500 - $17,500 depending on technology required $12,500 after CSAP (existing lots) $27,500 (development lots) Estimated Annual O&M Cost $127K $114K Estimate of Annual O&M Cost/Lot $100/yr - $13,000/yr depending on technology, water use and occupancy $544/existing lot/yr Estimated 20 Year Cost to Residents $4.7M ($22,800/existing lot) $8.7M ($24,700/existing lot) Notes: Community Servicing Assistance Plan (CSAP) funding will apply a 25% grant for the public sector costs for existing developed properties. Alternative 2 costs will be borne directly by individual property owners. Alternative 3 costs do not include any costs which will be incurred by property owners for private property portion of wastewater system connections. Alternative 2 estimated 20 Year Cost to Residents includes present value of capital cost and the present value of individual systems operating costs over a 20 year period based on an interest rate of 4%. Alternative 3 estimated 20 Year Cost to Residents includes present value of capital cost after the CSAP funding and the present value of wastewater rate fees over 20 year period based on an interest rate of 4%. Conceptual level cost estimates. Expected accuracy of -30% to +50%. All costs are in 2012 dollars. CSAP funding will be indexed to construction costs in future. Slide 27

29 Public Consultation We are looking for your feedback on Alternatives 2 and 3 Your feedback will be considered in the detailed evaluation The detailed evaluation will conclude with a recommended preferred solution that will be presented at Public Information Centre No. 3 Slide 28

30 Next Steps Receive and consider public input
Complete detailed evaluation of Alternatives 2 and 3 and select a recommended preferred alternative Develop and evaluate alternative design concepts for implementing the recommended preferred alternative Hold Public Information Centre No. 3 to present the recommended preferred alternative and recommended preferred alternative design concept Finalize preferred design 30 day public review and comment period for the Environmental Study Report Slide 29

31 Questions and Discussion
Slide 30


Download ppt "Princeton Wastewater Servicing Study"

Similar presentations


Ads by Google