Working Journal Chad Fernelius. Dayt Construction Internship 2006 Projects: Huish Detergents (converted a warehouse into a production facility) Farmington.

Similar presentations


Presentation on theme: "Working Journal Chad Fernelius. Dayt Construction Internship 2006 Projects: Huish Detergents (converted a warehouse into a production facility) Farmington."— Presentation transcript:

1 Working Journal Chad Fernelius

2 Dayt Construction Internship 2006 Projects: Huish Detergents (converted a warehouse into a production facility) Farmington Greens subdivision Salt Lake avenues basement remodel High priced homes Korloff Jewelers at the Gateway Parker International new office

3 DAYT- Huish job Prepared and painted floor with epoxy coating Prepared and painted floor with epoxy coating

4 DAYT- Huish job Created, installed, and used small scale concrete forming for exterior and interior utility pads Created, installed, and used small scale concrete forming for exterior and interior utility pads

5 DAYT- Huish job Installed door closers Installed door closers

6 DAYT- South Weber home Installed Installed Trex decking

7 DAYT- miscellaneous Framed drops, fireplace hearths, and other change orders. Framed drops, fireplace hearths, and other change orders. Supervised a basement remodel Supervised a basement remodel Poured sidewalks and driveways Poured sidewalks and driveways Paint- touchups and the Parker job Paint- touchups and the Parker job Executed change orders, repairs, punch lists, and inspection lists. Executed change orders, repairs, punch lists, and inspection lists. Supervised laborers Supervised laborers Installed hardware Installed hardware

8 Scott Call Construction custom finish work Projects along the northern Wasatch Front Projects along the northern Wasatch Front Performed all aspects of finish work including doors, closets, stairways, and trim-work. Performed all aspects of finish work including doors, closets, stairways, and trim-work.

9 Finish work Paint-grade Paint-grade door and casing

10 Finish work Stain-grade Stain-grade double door double door

11 Finish work Doors Doors with glass

12 Finish work Custom door mantle Custom door mantle

13 Finish work Base board Base board

14 Finish work Crown Crown

15 Finish work Crown Crown

16 Finish work Waffle ceiling wrapped and finished with alder Waffle ceiling wrapped and finished with alder

17 Finish- column wraps

18 Finish work Wall finishes and column wraps (shadow boxes) Wall finishes and column wraps (shadow boxes)

19 Finish- recessed panels

20 Finish- bead board

21 Finish- bead board- window sills

22 Finish- flex mold- base

23 Finish- mantle

24 Finish- closets

25 Finish- cold storage In Inprogress

26 Finish- railing

27

28

29 Finish- fiberglass columns

30 Finish work- Summary All of the finish work shown was completed by me except for the railings- of which I only helped to complete. As of August 2008, I have filled a vacancy in the company to be a lead carpenter and to install railings & ballustrades. All of the finish work shown was completed by me except for the railings- of which I only helped to complete. As of August 2008, I have filled a vacancy in the company to be a lead carpenter and to install railings & ballustrades. I have also learned laminate and hardwood flooring through Scott Call Construction I have also learned laminate and hardwood flooring through Scott Call Construction My original internship (fall 2006) was with DAYT My original internship (fall 2006) was with DAYT I have learned many finish skills from Scott Call Construction from 2007- present. I have learned many finish skills from Scott Call Construction from 2007- present. Other trades mastered preceding my internship include framing, siding- soffit & fascia & raingutters, and insulating. Other trades mastered preceding my internship include framing, siding- soffit & fascia & raingutters, and insulating.

31 Prior Experience Showcase My construction job experience began in 2004 as a framer. Prior to this experience, I became interested in construction at a young age by visiting homes under construction in my neighborhood. I began creating in high school by being heavily involved in the wood shop. I also volunteered for Habitat for Humanity for several months. My construction job experience began in 2004 as a framer. Prior to this experience, I became interested in construction at a young age by visiting homes under construction in my neighborhood. I began creating in high school by being heavily involved in the wood shop. I also volunteered for Habitat for Humanity for several months.

32 Framing I began framing for a sub contractor named Jason Randall. I grasped concepts easily and became capable of running a project from start to finish after less than six months of working experience. I began framing for a sub contractor named Jason Randall. I grasped concepts easily and became capable of running a project from start to finish after less than six months of working experience. During this job I found it necessary to take time off for school. As a result I worked for another framing subcontractor named Brandon Christopher. I returned to my original employer and worked independently with my brother Russell. During this job I found it necessary to take time off for school. As a result I worked for another framing subcontractor named Brandon Christopher. I returned to my original employer and worked independently with my brother Russell.

33 Framed homes The following are homes completely framed by my brother and I without our employers direct supervision. The following are homes completely framed by my brother and I without our employers direct supervision.

34 West Layton framed July 2005

35 Clinton framed August 2005

36 West Layton framed September 2005