Case Study Flemington Drainage Of New Track. Flemington Racecourse is a major racing venue in Melbourne, the track due to its surface condition needed.

Similar presentations


Presentation on theme: "Case Study Flemington Drainage Of New Track. Flemington Racecourse is a major racing venue in Melbourne, the track due to its surface condition needed."— Presentation transcript:

1 Case Study Flemington Drainage Of New Track

2 Flemington Racecourse is a major racing venue in Melbourne, the track due to its surface condition needed a new surface, and with this a complete new drainage system to handle Melbournes downpours and alleviate the issues of the past

3 Material to be non leaching material Connect to standard pipe fittings Pipe to be 225mm Stormwater Meet AS1477 Pipe Standards Meet a specific open area to suit track conditions To be slotted to the required drawings To be SWJ (Solvent Weld Joint)

4 The solution was to use 225mm Standard Stormwater Pipe. The Pipe used by Deps was Manufactured to Australian Standard (AS)1477. Slot pattern machined was, 4mm wide slots by 4 rows with a Vertical Slot The above specification allowed the collection of water from the surface at the rate required.

5 To use Australian Pipe Manufactured to AS1477 The slotted pipe was machines on one our automated slotters to the required pattern specifications

6 Due to the large quantities and a specific delivery time required a split shift was used to machine the pipe. The Pipes once machined and inspected where packed in crates and when a truck load was ready, it would be delivered directly to Flemington.

7 Case Study Find other suppliers in Australia Use standard slotted drain pipe that would not meet the specifications. Use Imported cheap pipe. Slot pattern by using hand tools. Thus having inconsistent slot width and patterns. The above method cannot guarantee open area or drainage are meet.

8 After the successful installation of the drainage system and new surface, Terry Watson Quote After all the rain we had last Saturday until Monday, but the new drainage system on the resurfaced track has seen the course recover more quickly than most fans would imagine Even top British Jockey Darryl Holland stated..after all the rain the track was surprisingly good

9 Thank you for taking the time to look at the information we have created for you, We hope this will be of assistance to solving your piping, drainage and drilling challenges. If you have any more questions Please feel free to contact myself or one of our team Article

10 For more Articles, Case Studies, How to and Information go to www.deps.com.au then click onto Handy Links or contact us on 1300 133 000 askus@deps.com.au Case Study

11

12 Solving your Piping, Drilling and Drainage Challenges with Trust and Integrity