Presentation is loading. Please wait.

Presentation is loading. Please wait.

<month year> doc.: IEEE < e> <January 2018>

Similar presentations


Presentation on theme: "<month year> doc.: IEEE < e> <January 2018>"— Presentation transcript:

1 doc.: IEEE 802.15-<15-09-0758-00-004e>
<month year> doc.: IEEE < e> <January 2018> Project: IEEE P Working Group for Wireless Specialty Networks (WSNs) Submission Title: [SG-SECN Closing Report] Date Submitted: [18 January 2018] Source: [Don Sturek] Company [Itron] Address [Liberty Lake, WA] Voice:[], Re: [SG-SECN closing report for January 2018 interim session.] Abstract: [SG-SECN closing report for January 2018 interim session] Purpose: [SG-SECN closing report for January 2018 interim session] Notice: This document has been prepared to assist the IEEE P It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by P Don Sturek (Itron)

2 SG-SECN Closing report
1/2/2019 SG-SECN Closing report January 18, 2018 Don Sturek SG-SECN Chair Don Sturek (Itron)

3 Call for Proposals Call for proposals document: 15-18-0035-01
Jul 12, 2010 07/12/10 1/2/2019 Call for Proposals Call for proposals document: Timeline for proposals: March 2018 (2 weeks before Chicago plenary) – New proposals July 2018 (2 weeks before San Diego plenary) – Revised or new proposals Hope to decide on a proposal at the San Diego meeting Don Sturek (Itron) Page 3

4 PAR & CSD are complete Scope and requirements are well defined
Jul 12, 2010 07/12/10 1/2/2019 PAR & CSD are complete Scope and requirements are well defined Group approved motion to move forward to WG approval. Don Sturek (Itron) Page 4

5 Study Group approval of PAR and CSD
1/2/2019 Study Group approval of PAR and CSD Request that the PAR and CSD contained in documents and , respectively, be approved for submission to the WG for its approval and that the EC be requested to forward the PAR to NesCom Moved by: Seconded by: (Approved by unanimous consent) Don Sturek (Itron)

6 WG approval of PAR and CSD
1/2/2019 WG approval of PAR and CSD Request that the PAR and CSD contained in documents and , respectively, be approved by the IEEE WG and that the EC be requested to forward the PAR to NesCom. The working group chair and technical editor are authorized to make additional modifications to the PAR and CSD as needed to reflect EC discussion at its closing meeting. Moved by: Don Sturek Seconded by: YES: NO: ABSTAIN: Don Sturek (Itron))


Download ppt "<month year> doc.: IEEE < e> <January 2018>"

Similar presentations


Ads by Google