Presentation is loading. Please wait.

Presentation is loading. Please wait.

<month year> doc.: IEEE < e> <March 2018>

Similar presentations


Presentation on theme: "<month year> doc.: IEEE < e> <March 2018>"— Presentation transcript:

1 doc.: IEEE 802.15-<15-09-0758-00-004e>
<month year> doc.: IEEE < e> <March 2018> Project: IEEE P Working Group for Wireless Specialty Networks (WSNs) Submission Title: [IEEE y SECN Closing Report] Date Submitted: [8 March 2018] Source: [Don Sturek] Company [Itron] Address [San Jose, CA] Voice:[], Re: [IEEE y SECN closing report for March 2018 plenary session.] Abstract: [IEEE y SECN closing report for March 2018 plenary session] Purpose: [IEEE y SECN closing report for March 2018 plenary session] Notice: This document has been prepared to assist the IEEE P It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by P Don Sturek (Itron)

2 IEEE 802.15.4y SECN Closing report
March 2018 IEEE y SECN Closing report March 8, 2018 Don Sturek IEEE y SECN Chair Don Sturek (Itron)

3 Proposals Heard 3 proposals:
Jul 12, 2010 07/12/10 March 2018 Proposals Heard 3 proposals: – Algorithm Agility without Frame Changes – Tero Kivinen – Frame Signaling Options for Security Extensions – Ben Rolfe – Itron Proposal for Enhanced Security – Don Sturek Don Sturek (Itron) Page 3

4 Timeline Timeline for proposals: March 2018 – New proposals
Jul 12, 2010 07/12/10 March 2018 Timeline Timeline for proposals: March 2018 – New proposals (New) May 2018 – Align existing proposals July 2018 – Revised or new proposals Decide on a proposal at the San Diego meeting Scope out amendment changes in San Diego Create timeline for project completion Don Sturek (Itron) Page 4

5 PAR & CSD are complete Addressed EC comments
Jul 12, 2010 07/12/10 March 2018 PAR & CSD are complete Addressed EC comments Submitted comment resolution for PAR comments – Updated CSD to match PAR comment resolution – Don Sturek (Itron) Page 5

6 May Interim Scheduled 2 session
Jul 12, 2010 07/12/10 March 2018 May Interim Scheduled 2 session Align existing proposals ahead of San Diego Don Sturek (Itron) Page 6

7 WG approval of PAR and CSD
March 2018 WG approval of PAR and CSD Request that the PAR and CSD contained in documents and , respectively, be approved by the IEEE WG and that the EC be requested to forward the PAR to NesCom. The working group chair and technical editor are authorized to make additional modifications to the PAR and CSD as needed to reflect EC discussion at its closing meeting. Moved by: Don Sturek Seconded by: YES: NO: ABSTAIN: Don Sturek (Itron))


Download ppt "<month year> doc.: IEEE < e> <March 2018>"

Similar presentations


Ads by Google