Flood Map Modernization FEMA’s Flood Map Modernization Update for Advisory Committee on Water Information (ACWI) February 2008 Allyson Lichtenfels FEMA.

Similar presentations


Presentation on theme: "Flood Map Modernization FEMA’s Flood Map Modernization Update for Advisory Committee on Water Information (ACWI) February 2008 Allyson Lichtenfels FEMA."— Presentation transcript:

1

2 Flood Map Modernization FEMA’s Flood Map Modernization Update for Advisory Committee on Water Information (ACWI) February 2008 Allyson Lichtenfels FEMA – Mitigation Risk Analysis Division

3 Flood Map Modernization 2 Agenda:  FEMA Flood Mapping supports the NFIP  Flood Map Modernization Successes (FY04-FY08)  Challenges Remaining  The Future ( FY09 and Beyond) Flood Map Modernization

4 FEMA Flood Mapping Supports the National Flood Insurance Program (NFIP)

5 Flood Map Modernization 4 Floods caused $50 Billion in damages in the 1990’s; NFIP losses alone totaled $20 Billion in 2005

6 Flood Map Modernization 5 Flood Map The Flood Insurance Rate Map (FIRM) Map Legend Map Index

7 Flood Map Modernization 6 NFIP 3 Legged Stool  Insurance Reduces burden on the Treasury and taxpayers  Floodplain Management and Mitigation Required for insurance eligibility Reduce the risks over time  Hazard Identification, Assessment, and Planning Supports sound floodplain management, enforcement of insurance requirements and insurance rating

8 Flood Map Modernization Flood Map Modernization Successes - FY04-FY08

9 Flood Map Modernization 8 Flood Map Modernization FY04-FY08  Flood Map Modernization is a 5-yr $1 billion Presidential Initiative that ends in FY08  FY08 Map Mod Budget – Appropriated $220M  Digital Flood Hazard Data and Maps for 92% of the Nation’s population  Enhanced Flood Map Quality – primarily the flood hazard boundary  Effective Program Management and Performance Measurement  Effective Partnerships with State, Local and National organizations as well as Other Federal Agencies

10 Flood Map Modernization 9 Performance Measurement – Key Performance Indicators (KPIs) FY04FY05FY06FY07FY08 TargetActualTargetActualTargetActualTargetActualTargetProj. Population w/ digital GIS flood data available online 20%17%50%39%50%48%60% 70% Population with effective maps that meet quality standards 10%8%20%16%25%23%35%32%50%

11 Flood Map Modernization 10 Effective Partnerships  Leveraging Resources Federal Agencies  USACE  USGS  NOAA  IAA with USGS to manage Map Mod Orthoimagery  National Digital Orthophoto Program (NDOP) and National Digital Elevation Program (NDEP)  State, Regional, and Local Resources Expanded Cooperating Technical Partners (CTP) Program

12 Flood Map Modernization 11 Levee Assessment Nationwide and Outreach  Continuing Coordination with the USACE  Continuing to work with communities and levee owners to assess levees as part of the mapping efforts  Furthering Levee Stakeholder Education Efforts http://www.fema.gov/plan/prevent/fhm/lv_intro.shtm

13 Flood Map Modernization 12 Risk-Based Resource Allocation and Planning  Multi-Year Flood Hazard Identification Plan Started in 2004 and updated yearly States and other key stakeholders involved through business planning Open and transparent resource allocation methodologies based on flood risk Gives other federal agencies an idea of where and when we will focus our flood mapping – facilitates leveraging Latest publication April 2007 available at: www.fema.gov/plan/prevent/fhm/mh_main.shtm www.fema.gov/plan/prevent/fhm/mh_main.shtm FY08 MHIP update in work; expected release Spring 2008

14 Flood Map Modernization 13 Where is Flood Risk the Greatest?

15 Flood Map Modernization 14 Effective Flood Maps in Map Mod (Projected counties in MHIP - February 2007)

16 Flood Map Modernization Challenges Remaining

17 Flood Map Modernization 16 Map Mod Challenges Challenges identified through Map Mod: Levees – good flood hazard data needed Coastal Flood Hazards – Storm surge and wave height updates critical NFIP participating communities – Not all will be “modernized” Degradation of Flood Hazard Data – What was done early in Map Mod needs to be assessed

18 Flood Map Modernization The Future FY09 and Beyond

19 Flood Map Modernization 18 Maps and the Mapping Process are Critical to reducing losses  Good flood maps are necessary but not the only component of flood risk reduction Without a good representation of the hazard you can’t reduce your risk Maps without follow-up action by communities and individuals are less valuable  The Mapping Process Drives Flood Mitigation Despite the media coverage many don’t see flooding as a problem for them Flood map updates help communicate flood risk – encourage action

20 Flood Map Modernization 19 Flood Risk Mapping, Analysis, and Planning (Risk MAP)  National Flood Insurance Reform Act of 1994 Requires that FEMA review and assess the NFIP map for each community for map update needs each 5 years  Draft Concepts for FEMA’s potential Flood Risk Mapping, Analysis and Planning efforts to address this requirement in FY09 and beyond being developed Draft FEMA FY09 Flood Mapping Concept Paper available at FEMA’s Flood Hazard Mapping Website: http://www.fema.gov/plan/ffmm.shtm http://www.fema.gov/plan/ffmm.shtm