Download presentation
Presentation is loading. Please wait.
Published byTerence Mason Modified over 6 years ago
1
Date of download: 10/13/2017 Copyright © ASME. All rights reserved. From: Agent Based Simulation Optimization of Waste Electrical and Electronics Equipment Recovery J. Manuf. Sci. Eng. 2016;138(10): doi: / Figure Legend: The buy-back price offered by the trade-in program for four different models of cellphones with different quality condition
2
Date of download: 10/13/2017 Copyright © ASME. All rights reserved. From: Agent Based Simulation Optimization of Waste Electrical and Electronics Equipment Recovery J. Manuf. Sci. Eng. 2016;138(10): doi: / Figure Legend: Histogram of the number of returns after 1800 simulation days. This figure is based on 100 simulation runs with different random seeds.
3
Date of download: 10/13/2017 Copyright © ASME. All rights reserved. From: Agent Based Simulation Optimization of Waste Electrical and Electronics Equipment Recovery J. Manuf. Sci. Eng. 2016;138(10): doi: / Figure Legend: Histogram of simulated revenue for each EoL process. a) Refurbishing, b) remanufacturing, and c) recycling.
4
Date of download: 10/13/2017 Copyright © ASME. All rights reserved. From: Agent Based Simulation Optimization of Waste Electrical and Electronics Equipment Recovery J. Manuf. Sci. Eng. 2016;138(10): doi: / Figure Legend: Total number of returned products to the manufacturer per different initial buy-back prices
5
Date of download: 10/13/2017 Copyright © ASME. All rights reserved. From: Agent Based Simulation Optimization of Waste Electrical and Electronics Equipment Recovery J. Manuf. Sci. Eng. 2016;138(10): doi: / Figure Legend: Distribution of quality grade of products received by the manufacturer for bbp = $103. The red line indicates the mean.
6
Date of download: 10/13/2017 Copyright © ASME. All rights reserved. From: Agent Based Simulation Optimization of Waste Electrical and Electronics Equipment Recovery J. Manuf. Sci. Eng. 2016;138(10): doi: / Figure Legend: Distribution of quality grade of products received by the manufacturer for bbp = $120. The red line indicates the mean.
7
Date of download: 10/13/2017 Copyright © ASME. All rights reserved. From: Agent Based Simulation Optimization of Waste Electrical and Electronics Equipment Recovery J. Manuf. Sci. Eng. 2016;138(10): doi: / Figure Legend: Distribution of quality grade of products received by the manufacturer for bbp = $140. The red line indicates the mean.
8
Date of download: 10/13/2017 Copyright © ASME. All rights reserved. From: Agent Based Simulation Optimization of Waste Electrical and Electronics Equipment Recovery J. Manuf. Sci. Eng. 2016;138(10): doi: / Figure Legend: Distribution of quality grade of products received by the manufacturer for bbp = $160. The red line indicates the mean.
9
Date of download: 10/13/2017 Copyright © ASME. All rights reserved. From: Agent Based Simulation Optimization of Waste Electrical and Electronics Equipment Recovery J. Manuf. Sci. Eng. 2016;138(10): doi: / Figure Legend: Distribution of the recovery profit of the manufacturer for bbp = $103. The red line indicates the mean.
10
Date of download: 10/13/2017 Copyright © ASME. All rights reserved. From: Agent Based Simulation Optimization of Waste Electrical and Electronics Equipment Recovery J. Manuf. Sci. Eng. 2016;138(10): doi: / Figure Legend: Distribution of the recovery profit of the manufacturer for bbp = $120. The red line indicates the mean.
11
Date of download: 10/13/2017 Copyright © ASME. All rights reserved. From: Agent Based Simulation Optimization of Waste Electrical and Electronics Equipment Recovery J. Manuf. Sci. Eng. 2016;138(10): doi: / Figure Legend: Distribution of the recovery profit of the manufacturer for bbp = $140. The red line indicates the mean.
12
Date of download: 10/13/2017 Copyright © ASME. All rights reserved. From: Agent Based Simulation Optimization of Waste Electrical and Electronics Equipment Recovery J. Manuf. Sci. Eng. 2016;138(10): doi: / Figure Legend: Distribution of the recovery profit of the manufacturer for bbp = $160. The red line indicates the mean.
13
Date of download: 10/13/2017 Copyright © ASME. All rights reserved. From: Agent Based Simulation Optimization of Waste Electrical and Electronics Equipment Recovery J. Manuf. Sci. Eng. 2016;138(10): doi: / Figure Legend: Result of the optimization
Similar presentations
© 2025 SlidePlayer.com Inc.
All rights reserved.