Download presentation
Presentation is loading. Please wait.
Published byOscar Underwood Modified over 8 years ago
1
Date of download: 9/19/2016 Copyright © ASME. All rights reserved. From: A Sequential Approach for Gas Turbine Power Plant Preventative Maintenance Scheduling J. Eng. Gas Turbines Power. 2005;128(4):796-805. doi:10.1115/1.2179470 Expected cost of maintenance and its components as a function of the length of the preventive maintenance interval for the first O&M cycle Figure Legend:
2
Date of download: 9/19/2016 Copyright © ASME. All rights reserved. From: A Sequential Approach for Gas Turbine Power Plant Preventative Maintenance Scheduling J. Eng. Gas Turbines Power. 2005;128(4):796-805. doi:10.1115/1.2179470 Cost of maintenance and cost rate of maintenance as a function of the length of preventive maintenance interval for the first O&M cycle Figure Legend:
3
Date of download: 9/19/2016 Copyright © ASME. All rights reserved. From: A Sequential Approach for Gas Turbine Power Plant Preventative Maintenance Scheduling J. Eng. Gas Turbines Power. 2005;128(4):796-805. doi:10.1115/1.2179470 Expected profit and profit rate as a function of the length of preventive maintenance interval for the first O&M cycle Figure Legend:
4
Date of download: 9/19/2016 Copyright © ASME. All rights reserved. From: A Sequential Approach for Gas Turbine Power Plant Preventative Maintenance Scheduling J. Eng. Gas Turbines Power. 2005;128(4):796-805. doi:10.1115/1.2179470 Gas turbine system actual age and virtual age as a function of calendar time for the sequential preventive maintenance schedule Figure Legend:
5
Date of download: 9/19/2016 Copyright © ASME. All rights reserved. From: A Sequential Approach for Gas Turbine Power Plant Preventative Maintenance Scheduling J. Eng. Gas Turbines Power. 2005;128(4):796-805. doi:10.1115/1.2179470 Gas turbine system failure rate as a function of calendar time for the sequential preventive maintenance schedule Figure Legend:
6
Date of download: 9/19/2016 Copyright © ASME. All rights reserved. From: A Sequential Approach for Gas Turbine Power Plant Preventative Maintenance Scheduling J. Eng. Gas Turbines Power. 2005;128(4):796-805. doi:10.1115/1.2179470 Power plant performance degradation as a function of calendar time for the sequential preventive maintenance schedule Figure Legend:
7
Date of download: 9/19/2016 Copyright © ASME. All rights reserved. From: A Sequential Approach for Gas Turbine Power Plant Preventative Maintenance Scheduling J. Eng. Gas Turbines Power. 2005;128(4):796-805. doi:10.1115/1.2179470 Power plant expected cost of maintenance and its components as a function of calendar time for the sequential preventive maintenance schedule Figure Legend:
8
Date of download: 9/19/2016 Copyright © ASME. All rights reserved. From: A Sequential Approach for Gas Turbine Power Plant Preventative Maintenance Scheduling J. Eng. Gas Turbines Power. 2005;128(4):796-805. doi:10.1115/1.2179470 Power plant cumulative cash flow as a function of calendar time for the sequential preventive maintenance schedule Figure Legend:
9
Date of download: 9/19/2016 Copyright © ASME. All rights reserved. From: A Sequential Approach for Gas Turbine Power Plant Preventative Maintenance Scheduling J. Eng. Gas Turbines Power. 2005;128(4):796-805. doi:10.1115/1.2179470 Price of electricity, profit rate, and cost rate of maintenance as a function of the length of the preventive maintenance interval. (With consideration of the seasonal trend of the price of electricity.) Figure Legend:
Similar presentations
© 2024 SlidePlayer.com Inc.
All rights reserved.