1 PIPELINE TRANS -SAHARA
DATA Beni Saf Flow rate : 18 up to 25 Billions m3/Year From Warri (Nigeria) to Beni Saf (Algéria): Diameter: 56’’ Total length : km Path : Nigeria - Niger - Algeria - Europe Nigeria: 1000 Km Niger: Km Algeria: Km Joint venture (NNPC-SONATRACH):  Feasibility studies  Environment Impact Assessment Warri

2 Upstream Associated Gas Recovering Projects Since 1973
ANNABA ALGER BEJAIA JIJEL SKIKDA GUELMA EL TAREF TIPAZA TIZI OUZOU SETIF CONSTANTINE SOUK AHRAS ARZEW MUSTAGANEM AIN DEFLA BOUIRA ECH CHLEF ORAN M'SILA OUM EL BOUAGUI BATNA SIDI BEL ABBES TIARET BOU SAADA TEBESSA TELEMCEN DJELFA BISKRA SAIDA EL ARICHA LAGHOUAT MECHERIA AFLOU Existing Projects New Projects BORDJ NILI HASSI R’MEL MESKAR TOUGGOURT 1999 AIN SEFRA 1985 OUED NOUMER HASSI MESSAOUD 1993 Guellala 1973 2005 1993 HBK REB 1982 Benkahla BECHAR 1993 Mesdar BIR RBAA 2001 EL Gassi DAMRANE NEZLA.N RKF NEZLA HBNS Guassi Touil 2002 EL GOLEA HASSI TOUAREG RHOURDE EL KHLEF HASSI CHERGUI RHOURDE EL CHOUF 1983 Rhourde Nouss BENI ABBES DRAA ALLAL 2002 Mereksen HAMRA 1983 Stah TABELBALA TIMIMOUN 1987 ALRAR TFT 2001 Ohanet 1986 1995 Amassak Adrar Zarzaïtine 2004 ADRAR Edjeleh

3 Associated Gas Produced & Flared (1970-2001) Sonatrach & Parteners

4 NEW PROJECTS 2002-2006 19 809 887 195 11 300 000 Total Hassi R’Mel -
Foreign Total cost currency Amount to be Projects * ( x 10 3 DA) component (106 $) recovered(M3 /d) Hassi R’Mel - Associated gas recovery (CTH Phase 2) 72 4 000 000 In Aménas - Associated gas recovery Edjeleh 2 734 000 28 1 000 000 Gassi Touil - 5 000 000 Associated gas recovery 2 634 330 31 Hassi Messaoud 700 000 - Extension LDHP CINA 18 - Condensate valorization 1292 000 12 Crude Oil stabilisation unit 3572 000 33 Rhourde Nouss - Associated gas recovery 491 000 1 Total 19 195 11 * Project to be delivered from 2002

5 Flared Gas SONATRACH-LTH facilities
1 129 1 166 1 270 897 787 791 - 200 400 600 800 1 000 1 200 1 400 1 600 1 800 2 000 MM CM3 Eq, GN 1 2 3 4 5 Flared Gas / N,Gas input (%) Flared Gas Percentage of flared Gas / NG (%) 4,1 4,3 4,0 2,8 2,3 1993 1994 1995 1996 1997 1998 1999 2000 Before rehabilitation During rehabilitation work After rehabilitation