2008-09-10E. Hazen1 HCAL DAQ To Do List Here come the protons! But still lots to do... DQM Tweaks HO Trigger Links New DCC Selective readout.

Similar presentations


Presentation on theme: "2008-09-10E. Hazen1 HCAL DAQ To Do List Here come the protons! But still lots to do... DQM Tweaks HO Trigger Links New DCC Selective readout."— Presentation transcript:

1 2008-09-10E. Hazen1 HCAL DAQ To Do List Here come the protons! But still lots to do... DQM Tweaks HO Trigger Links New DCC Selective readout

2 2008-09-10E. Hazen2 DQM - Jason Improve reliability of automatic offline DQM for global runs Need some back-up for DBS, which is unreliable Make it easier to find DQM plots (one place to look!) Improve data integrity plots (ala EricDIM) Change error counts to log scale by default Fix bugs in exisiting data integrity plots

3 2008-09-10E. Hazen3 HO Trigger Links Status: oSLB installed, fibers pulled Link tests done on prototypes(last year!) To be done: Work at CERN: Connect fibers on both ends Link test (with RPC group) Test / commission automatic synchronization procedure Remote work: Define correct mapping, add to firmware Software Flash memory programming Map setting Add support for BX histogramming Enhance expert view

4 2008-09-10E. Hazen4 New DCC Project Make discreet inquiry about project approvalJim / Larry Software Specification Eric Coding Arno/Phil/Eric Hardware Order critical parts ASAP Finish PCB layout, review Order prototypes (how many?) Assemble, test Firmware Wu First version duplicates current DCC as possible