José C. Da Silva OFF DETECTOR WORSHOP, April 7, 2005, Lisboa SLB and DCC commissioning for 904.

Similar presentations


Presentation on theme: "José C. Da Silva OFF DETECTOR WORSHOP, April 7, 2005, Lisboa SLB and DCC commissioning for 904."— Presentation transcript:

1 José C. Da Silva OFF DETECTOR WORSHOP, April 7, 2005, Lisboa SLB and DCC commissioning for 904

2 José C. Da Silva OFF DETECTOR WORSHOP, April 7, 2005, Lisboa SLB commissioning for 904

3 José C. Da Silva OFF DETECTOR WORSHOP, April 7, 2005, Lisboa SLB Production Status SLB Production (1210 Boards) Pre production assembly of 100 Boards just arriving to CERN. JTAG test bench (Infra + Inter) working! SLB Output has to have 2 output formats : STC and RC (software controlled) Firmware in final test stage, BIST! Assembly of the remaining boards will follow after acceptance of the 1 st batch. Being delivered to CERN this week! Full Production of the PCBs had some delay ! (PCB Production Frames Quality)

4 José C. Da Silva OFF DETECTOR WORSHOP, April 7, 2005, Lisboa SLB PCB Production Frame

5 José C. Da Silva OFF DETECTOR WORSHOP, April 7, 2005, Lisboa 904 commissioning 100 SLBs tested by end of APRIL! HCAL ok! ECAL ok! Cables to be ordered soon! (25 minimum), connectors from WU decision on length (10m)

6 José C. Da Silva OFF DETECTOR WORSHOP, April 7, 2005, Lisboa DCC commissioning for 904

7 José C. Da Silva OFF DETECTOR WORSHOP, April 7, 2005, Lisboa DCC Pre Production Status DCC Pre Production (8 Boards) 1 DCC “kit” in 867 (H4 conditions) - Recabling done Pre production assembly 8 Boards! -Processing (BARCO) Production of the PCBs had 1 weeks delay ! -CERN procedures adds a 2 week delay + Easter! DCC Tester Firmware Revision -Ordered 35 NGKs TX Start DCC tests in end of April/May DCC mechanics “a la HCAL” -Front Panel production Progressive DCC delivery -> May -> July

8 José C. Da Silva OFF DETECTOR WORSHOP, April 7, 2005, Lisboa DCC V1

9 José C. Da Silva OFF DETECTOR WORSHOP, April 7, 2005, Lisboa DCC distribution DCC Prototypes: 1 Bldg 867 1 RPC Group DCC Pre Production (8 Boards) 3 DCC for 867 Will be used as production spares ! 1 DCC for Cosmic Tests (H4), 2 DCC for Magnet tests, 1 DCC (Lab) 1 DCC Preshower (?), spare. 1 DCC, PCB only, for TOTEM

10 José C. Da Silva OFF DETECTOR WORSHOP, April 7, 2005, Lisboa DCC vs SM10 Integration at 867

11 José C. Da Silva OFF DETECTOR WORSHOP, April 7, 2005, Lisboa CCS (Kostas) TTC emulator/encoding DCC 70 Channels + SR Slink 64 (FEDKIT) Slink adaptor (PCB full production done!) OD Backplane Pre-production of 10 (ongoing) VME Bridge (SBS620) Crate Configuration Commissioning for 904

12 José C. Da Silva OFF DETECTOR WORSHOP, April 7, 2005, Lisboa New DCC Tester and TCC Tester production Main Board redesign and production! Production of 9 Optical Modules Assembly of all and tests. 35 NGK 8ch TX Special Production 3 Months delivery time, 40 k USD MANPOWER Availability!!! no NEW testers available Before OCTOBER! Commissioning for 904 (2)

13 José C. Da Silva OFF DETECTOR WORSHOP, April 7, 2005, Lisboa JTAG test bench ready Production tests of the SLBs SLB Cables for 904 Support ongoing tests on 867 with DCC#1 Pre-Production and tests of 8 DCC Pre-Production of OD Backplanes Slink Adaptors Assembly Ongoing/Planning SLB DCC


Download ppt "José C. Da Silva OFF DETECTOR WORSHOP, April 7, 2005, Lisboa SLB and DCC commissioning for 904."