FITTING THE FRAMEWORK AND CLOSING A WALL OF WOOD AND PARTITION JOB ORDER PREPARATION INSTALLATION AND CLOSING A WALL OF WOOD AND PARTITION.

Similar presentations


Presentation on theme: "FITTING THE FRAMEWORK AND CLOSING A WALL OF WOOD AND PARTITION JOB ORDER PREPARATION INSTALLATION AND CLOSING A WALL OF WOOD AND PARTITION."— Presentation transcript:

1 FITTING THE FRAMEWORK AND CLOSING A WALL OF WOOD AND PARTITION JOB ORDER PREPARATION INSTALLATION AND CLOSING A WALL OF WOOD AND PARTITION

2 LEARNING OBJECTIVES:  It is expected that students can explain the equipment used for the installation of the framework and cover the walls of the timber and the partition  It is expected that students can explain the material required in the installation of the framework and cover the walls of the timber and the partition  It is expected that students can explain the context of the preparation and installation of the installation of the wooden wall coverings and partitions

3 Tools : Hand wood working tools: 1.Hammer. 2.Crab. 3.“Perusut”. 4.Mallet. 5.Elbow. 6.Meter length of 3 meters or more. 7.The saw cut.

4 Tools Wood working tools machinery :  hand planner  thecknesser  radial arm saw  ripping saw  router

5 Form of the house with wood floors walls

6 INVESTMENT HOUSE WALLS WITH WOOD FLOORS

7

8 MATERIAL: Materials include: 1.Log 2.Floorboards

9 FITTING THE FRAMEWORK AND CLOSING A WALL WOOD Things that need to be prepared: 1.Make sure the place is ready to set the framework of the wall 2.Select equipment bring work to the workplace 3.Choose the appropriate materials with the plan of working drawings 4.Make connections in accordance with the framework of working drawings 5.Make the connection board in accordance with the plan of working drawings 6.Prepare job supporting equipment.

10 Note...  To get an impression of the room with wide wooden walls, how to install wood clapboard?

11 TRY ANSWER... How many types of connection systems for the installation of wide plank wood walls?

12 Bibliography :  Modul Pembelajaran Merencanakan Pekerjaan Daun Pintu da Jendela, 2003. Jakarta : Direktorat Pendidikan dan Kejuruan  Gambar Teknik Bangunan, 1999. Direktorat Pendidikan dan Kejuruan. Departemen Pendidikan dan kebudayaan.  Hand Out, Konstruksi Kayu. Pusat Pengembangan Penataran Guru / VEDC Malang. 1987

13 Thank You