Bidders’ Conference IT-4130/EN Replacement of Personnel Lifts (up to 2 t Capacity) I. Rühl / EN-HE.

Similar presentations


Presentation on theme: "Bidders’ Conference IT-4130/EN Replacement of Personnel Lifts (up to 2 t Capacity) I. Rühl / EN-HE."— Presentation transcript:

1 Bidders’ Conference IT-4130/EN Replacement of Personnel Lifts (up to 2 t Capacity) I. Rühl / EN-HE

2 Accelerating Science and Innovation CERN, 2016Ingo RUEHL / EN-HE2

3 Conseil Européen pour la Recherche Nucléaire World largest Particle Physics Laboratory (1954) CERN, 2016Ingo RUEHL / EN-HE 3 21 Member Countries Austria, Belgium, Bulgaria, Check Republic, Denmark, Finland, France, Germany, Greece, Italia, Israel, Hungary, Holland, Norway, Poland, Portugal, Slovakia, Spain, Sweden, Switzerland, UK. Yearly Budget ~1100 MCHF (~ 1000 MEUR) Experiments financed externally. 7 Observers Countries EU, USA, Russia, India, Japan, Turkey, UNESCO Personnel 2300 Staff 730 Fellows & Associates 200 Students 11000 Users from 500 universities 2000 External companies 1 Associate Country Pakistan 2 Candidate Countries Romania and Serbia

4 CERN, 2016Ingo RUEHL / EN-HE 4 CERN is a Global Lab

5  Push forward the frontiers of knowledge e.g. the secrets of the Big Bang …what was the matter like within the first moments of the Universe’s existence?  Develop new technologies for accelerators and detectors Information technology - the Web and the GRID Medicine - diagnosis and therapy  Train the scientists and the engineers of tomorrow  Unite people from different countries and cultures CERN, 2016Ingo RUEHL / EN-HE 5 The Mission of CERN

6 CERN, 2016Ingo RUEHL / EN-HE 6 The next scientific challenge is to understand the very first moments of our Universe after the Big Bang LHC 10 -10 s

7 CERN, 2016Ingo RUEHL / EN-HE 7 The CERN Accelerator Complex

8 A collider situated in a 100m underground 27 km (almost) circular tunnel which accelerates two proton beams to 7 TeV CERN, 2016Ingo RUEHL / EN-HE 8 The LHC 1982 : First studies 1994 : Project Approved by the CERN Council 1996 : Final Decision and start of the construction 2004 : Installation Starts 2006 : Hardware Commissioning Starts 2008 : End of Hardware Commissioning 2009-2030: Physics 10 GJ = 55 km/h

9 CERN, 2016Ingo RUEHL / EN-HE 9 The ATLAS Experiment

10 I. Ruehl / CERN LiftEx 2015, Liverpool 10 CERN Structure 2016 DIRECTORATE Director-GeneralFabiola Gianotti Director for Accelerators and TechnologyFrédérick Bordry Director for Research and ComputingEckhard Elsen Director for Finance and Human ResourcesMartin Steinacher Director for International RelationsCharlotte Warakaulle Occupational HSE Protection UnitS. Baird DEPARTMENT HEADS BeamsPaul Collier EngineeringRoberto Losito Experimental PhysicsManfred Krammer Finance and Administrative ProcessesFlorian Sonnemann Human ResourcesAnne-Sylvie Catherin Industry, Procurement and Knowledge TransferThierry Lagrange Information TechnologyFrédéric Hemmer TechnologyJosé Miguel Jiménez Theoretical PhysicsGian Francesco Giudice Site Management and BuildingsLluis Miralles

11 CERN, 2016Ingo RUEHL / EN-HE11 The Engineering Department

12 The mandate of the Handling Engineering (HE) Group is to provide transport and handling services for the technical infrastructure of CERN, accelerators and experiments. This includes the design, the tendering/procurement, the installation, the commissioning, the operation, the maintenance and decommissioning of standard industrial and custom built transport and handling equipment. EN-HE Group CERN, 2016Ingo RUEHL / EN-HE12

13 EN-HE Transport and Handling Equipment CERN, 2016Ingo RUEHL / EN-HE13 350 Cranes / 800 Hoists 2000 Lifting Beams 80 Working Platforms 400 Lifting Equipment 100 Tractors 50 Special Vehicles About 4000 assets in Total 130 Lifts

14 IT-4130/EN replacement of personnel lifts up to 2t capacity in tertiary buildings on Swiss and French territory 11 lifts between 2016 and 2020 CERN, 2016Ingo RUEHL / EN-HE 14 Bidders’ Conference