CARESG, 11Apr2006V. Palladino Report on BENE Activities Beams for European Neutrino Experiments (BENE) subtitle: A Network aiming at a consensual road.

Similar presentations


Presentation on theme: "CARESG, 11Apr2006V. Palladino Report on BENE Activities Beams for European Neutrino Experiments (BENE) subtitle: A Network aiming at a consensual road."— Presentation transcript:

1 CARESG, 11Apr2006V. Palladino Report on BENE Activities Beams for European Neutrino Experiments (BENE) subtitle: A Network aiming at a consensual road map for accelerator based neutrino programs in Europe A complex multi-parameter problem International Scoping Study of a future Neutrino Factory and Superbeam facility (ISS) FP7 Design Study of next European Accelerator Neutrino Facility “Euro ν” DS in world wide collaboration W orld DS

2 CARESG, 11Apr2006V. Palladino Report on BENE Activities 20022003200420052006200720082009201020112012 Accelerator R&D CARE Multipurpose (e,p, ) ???? CARE SRF CARE PHIN CARE HIPPI CARE NED EUROTEV DS: ILC+CLIC ????? EURISOL DS: Neutrino  -beam ???? DS Fact Scoping study ? DS Fact? EUROLEAP e in plasma? Major Strategic decisions

3 CARESG, 11Apr2006V. Palladino Report on BENE Activities Since CAREO5 2nd meeting of the ISS in KEK in Jan Orsay Strategy Group Symposium Feb 1 BENE Midterm Report 3rd meeting of the ISS in RAL (24-27 Apr) BENE FP7/IDS Day 28 April LOI !!!! Last meeting of the ISS at NuFact06 late Aug

4 CARESG, 11Apr2006V. Palladino Report on BENE Activities Exploring all possible FP7 plans Design study Euro ν Feasibility studi(es) “RTD” TPW Specific ν I3 with several JRAs JRA(s) in CARE2

5 CARESG, 11Apr2006V. Palladino Report on BENE Activities 2005 06 07 08 09 10 11 19 Int. Scoping Study(*) Design Study BENE : the longer term plan CDR … at the time of end of LHC payment first LHC results ILC decision be ready to catch any construction window Physics feasibility Feasibility & TPW HIPPI, HARP MERIT MICE PRISM, EMMA NB Betabeam CDR End 2009 ! Construction window

6 CARESG, 11Apr2006V. Palladino Report on BENE Activities Milestones & Deliverables BENE III period Jan 06 - Jun07 BENESG 1/ month Jan Feb Mar Apr May Jun Jul Aug Sep Nov Dec Jan Feb Mar Apr May Jun

7 CARESG, 11Apr2006V. Palladino Report on BENE Activities A complete Euro-Neutrino Design Study physics, accelerators, detectors, baselines ISS= International Scoping Study … American and Asian collaborations as full partners June 2005 to late 2006: mostly neutrino factory & superbeams define priorities and ways of Design Study consolidate regional & international collaboration us in EU, gain support of Council and ECFA IDS = International Design Study (neutrino factory & superbeams & betabeam) start late 2006 or early 2007 achieve higher funding, start design effort us in EU, prepare FP7 Proposal (March 2007, it seems) structure EU collaboration, get CERN involved as much as possible FP7 DS = EC (support for EU effort in the) Design Study … CNGS & beyond aiming at first EC funds Jan 1, 2008 inter-twined with IDS keeping American and Asian collaborations as full partners …. T2K, Nova Goal: Conceptual Design Report of a European Precision Neutrino Facility by end 2010 is next natural step for accelerator ν ISS & IDS/FP7 DS BENE CDHS CHARM I/II CHORUS NOMAD OPERA ICARUS

8 CARESG, 11Apr2006V. Palladino Report on BENE Activities conceptual feasibility study of the following components: a high power proton driver of at least 4-5 GeV the engineering of the handling, containment and safety aspects of a hi power target & collection station a performing and cost effective muon phase rotation and cooling channel non-scaling FFAGs for acceleration of muons (and possibly protons) an optimised storage ring for muons higher intensity and higher gamma beta beams technical preparatory (R&D) projects, aiming at demonstrating: the existence of at least one adequate choice of target an extended lifetime of the horn prototypes at high rate and radiation muon ionization cooling, by completion of the MICE experimental program operation of a non-scaling FFAG RF cavities and kicker magnets for fast manipulation of muon beams + specific detector R&D and design efforts on : photo detector development for very large far detectors developments of the liquid argon technique including the presence of magnetic field study and tests of a magnetic calorimeter susceptible to be built with a mass of up to 100 kton. detectors dedicated for tau detection such as the emulsion cloud chamber last but not least the necessary near detector concepts and beam instrumentation guessing the Content of the Design Study pre-submitting it now to ECFA/ESGARD scrutiny

9 CARESG, 11Apr2006V. Palladino Report on BENE Activities

10 CARESG, 11Apr2006V. Palladino Report on BENE Activities


Download ppt "CARESG, 11Apr2006V. Palladino Report on BENE Activities Beams for European Neutrino Experiments (BENE) subtitle: A Network aiming at a consensual road."