Spacebel - Hoeilaart, 18-19 February 2009 SPS Mandatory I/F Development Slide 1 HMA SPS Mandatory I/F Development HMA-T Phase 2 Acceptance Review 1 18.

Similar presentations


Presentation on theme: "Spacebel - Hoeilaart, 18-19 February 2009 SPS Mandatory I/F Development Slide 1 HMA SPS Mandatory I/F Development HMA-T Phase 2 Acceptance Review 1 18."— Presentation transcript:

1 Spacebel - Hoeilaart, 18-19 February 2009 SPS Mandatory I/F Development Slide 1 HMA SPS Mandatory I/F Development HMA-T Phase 2 Acceptance Review 1 18 Feb 2009, Spacebel Reuben Wright, DEIMOS Space Philippe Merigot, SPOT Image Alexandre Robin, SPOT Image

2 Spacebel - Hoeilaart, 18-19 February 2009 SPS Mandatory I/F Development Slide 2  Schedule and Actions  Deliverables Updates to OGC 07-018 Sensor Planning Service Application Profile for EO Sensors v2.0 draft Software Requirements and Software Design RIDs Software Testing Specification Test Execution Records  Software Development Open Source EO-SPS Library DEIMOS Development SPOT Development  Demonstrations

3 Spacebel - Hoeilaart, 18-19 February 2009 SPS Mandatory I/F Development Slide 3 Schedule : HMA “short” schedule was applied

4 Spacebel - Hoeilaart, 18-19 February 2009 SPS Mandatory I/F Development Slide 4 Actions StateTitleRefDue ClosedSpot Image to organise a meeting before OGC TC at Atlanta to discuss new SPS 1.0. HMAT-MOM- 2001-SPB A20 ASAP OpenProvide input for storyboard to be used at FP HMAT-MOM- 2001-SPB A26 Acceptance review OpenUpload slides on Wiki page with "project meetings" HMAT-MOM- 2001-SPB A2 ASAP NB. Excludes actions for “ALL” partners with status “Closed” and 2 specific SPS EO Profile actions

5 Spacebel - Hoeilaart, 18-19 February 2009 SPS Mandatory I/F Development Slide 5 DescriptionPlanned Delivery Actual Delivery SPS mandatory I/F Requirement Baseline (KO+1,5m)07-018r3 v2 draft 04/02/09 SPS mandatory I/F Software Specification Document PM1 (KO+3m) V1.0 2/10/2008 V1.1 04/02/09 SPS mandatory I/F Software Design Document PM1 (KO+3m) V1.0 6/10/2008 V1.1 04/02/09 Software Validation Testing Specification of the SPS mandatory I/F PM2 (KO+5m) V1.0 04/02/09 Validated SPOT SPS mandatory I/F software PM2 (KO+5m) N/A Validated DEIMOS SPS mandatory I/F software AR-1 (KO+7m) Available SPS mandatory I/F Validation Test Report AR-1 (KO+7m) Progress reports and management documentation - Deliverables: Overview DescriptionPlanned Delivery Actual Delivery SPS mandatory I/F Requirement Baseline (KO+1,5m)07-018r3 v2 draft 04/02/09 SPS mandatory I/F Software Specification Document PM1 (KO+3m) V1.0 2/10/2008 V1.1 04/02/09 SPS mandatory I/F Software Design Document PM1 (KO+3m) V1.0 6/10/2008 V1.1 04/02/09 Software Validation Testing Specification of the SPS mandatory I/F PM2 (KO+5m) V1.0 04/02/09 Validated SPOT SPS mandatory I/F software PM2 (KO+5m) N/A Validated DEIMOS SPS mandatory I/F software AR-1 (KO+7m) Available SPS mandatory I/F Validation Test Report AR-1 (KO+7m) Available Progress reports and management documentation -

6 Spacebel - Hoeilaart, 18-19 February 2009 SPS Mandatory I/F Development Slide 6 Deliverables - OGC 07-018 Sensor Planning Service Application Profile for EO Sensors v2.0 draft  Status Still a draft document (based on the SPS v2.0 specification which is still draft) but all EO parameters specified  RIDS YC-11, YC-13, YC-14, YC-15, YC-16, YC-18, YC-20 : accepted. Document updated YC- 12, YC-17 : no change in the document YC-19 : accepted. To be done in SPS instead of SPS EO specification  Actions TitleRefStatus Update SPS EO profile to include proper identification of SPS 2.0 draft document and publish on HMA-T baseline page HMAT-MOM-2003- SPB A19 Open Identify draft of SPS 2.0 document which is used as baseline for work with Deimos HMAT-MOM-2003- SPB A18 Open

7 Spacebel - Hoeilaart, 18-19 February 2009 SPS Mandatory I/F Development Slide 7 Deliverables  Software Requirements Document RIDs YC-39, YC-40, YC-41, YC-42, YC-43, YC-44, YC- 45, YC-46, YC-47 all accepted and document updated as agreed at 26-11-08 progress meeting  Architecture Design Document RIDs YC-31, YC-32, YC-33, YC-34, YC-35, YC-37, YC-38 accepted and document updated as agreed at 26-11-08 progress meeting YC-36 closed during meeting  New V1.1 documents delivered to Wiki http://wiki.services.eoportal.org/tiki-index.php?page=HMA-T+Deliverables

8 Spacebel - Hoeilaart, 18-19 February 2009 SPS Mandatory I/F Development Slide 8 Deliverables  Software Test Specification Detailed suite of tests for the SPS interfaces. Covers both DEIMOS and SPOT developments Also identifies where tests are different Test Procedures to give step by step test process Test data for inputs and reference data to check outputs  Review version delivered to Wiki http://wiki.services.eoportal.org/tiki-index.php?page=HMA-T+Deliverables Test Execution Records for DEIMOS testing (all TC-0010 to TC-0120 passed)

9 Spacebel - Hoeilaart, 18-19 February 2009 SPS Mandatory I/F Development Slide 9 Software Deliverables  SPS Library Release Candidate version delivered to Deimos on Oct 8 th Readers and writers for SPS 2.0 requests and responses: GetCapabilities, DescribeTasking, GetFeasibility, Submit, GetStatus, DescribeResultAccess Helpers to handle Optical and SAR tasking parameters as well as corresponding feasibility study responses SPOT developed SPS library is open source Available on google code: http://code.google.com/p/eo-sps-library

10 Spacebel - Hoeilaart, 18-19 February 2009 SPS Mandatory I/F Development Slide 10 Software Deliverables  SPOT SPS Interface software Uses SPS library Implementation of synchronous (polling GetStatus) and asynchronous (via notifications) SPS behaviors Connection to our prototype multi-mission feasibility server wrapped by the SPS interface Full simulation of acquisitions occurring after a Submit so that the interface can be tested thoroughly Notification server implemented according to the WS- Base-Notification standard from OASIS (based on the open source Apache Muse library)

11 Spacebel - Hoeilaart, 18-19 February 2009 SPS Mandatory I/F Development Slide 11 Software Deliverables  DEIMOS developed SPS Interface software Uses the SPS library Uses the Earth Explorer CFI to simulate a radar mission planning system Tested using Web Service Explorer for detailed access to messages, and verification against reference data Software can be installed at ESRIN as required WAR file which can be deployed on Linux server, on top of Apache Tomcat and Axis 2 web service framework

12 Spacebel - Hoeilaart, 18-19 February 2009 SPS Mandatory I/F Development Slide 12 RIDs  YC-14: HMAT-ADD-0001-DMS 1.1  YC-15 – YC-21: HMA-T-DMS-STS-001 issue 1.0

13 Spacebel - Hoeilaart, 18-19 February 2009 SPS Mandatory I/F Development Slide 13 Test case TC-1010 Spot Image SPS I/F functionality without notification

14 Spacebel - Hoeilaart, 18-19 February 2009 SPS Mandatory I/F Development Slide 14 Test case TC-1020 Spot Image SPS I/F functionality with notification

15 Spacebel - Hoeilaart, 18-19 February 2009 SPS Mandatory I/F Development Slide 15 DEIMOS SPS Testing description  As used for Software Testing Two machine version of configuration Software running in Apache Tomcat Web Services Explorer in Eclipse Sample test data  “Raw” data approach Allows user to directly interact with the source and response XML Rigid repeatability Step towards formal CTL based testing