05 October 2010 HMA-FO Task 2: Feasibility Analysis Service HMA Follow On Activities Task 2: Feasibility Analysis Service (Sensor Planning Service) Monthly.

Similar presentations


Presentation on theme: "05 October 2010 HMA-FO Task 2: Feasibility Analysis Service HMA Follow On Activities Task 2: Feasibility Analysis Service (Sensor Planning Service) Monthly."— Presentation transcript:

1 05 October 2010 HMA-FO Task 2: Feasibility Analysis Service HMA Follow On Activities Task 2: Feasibility Analysis Service (Sensor Planning Service) Monthly Progress Meeting 05 October 2010 Reuben Wright, Deimos Space

2 05 October 2010 HMA-FO Task 2: Feasibility Analysis Service  Schedule  Deliverables  Work in Progress SPS 2.0 EO Extension for SPS 2.0 SFRE Documentation SFRE Development Executable Test Suite

3 05 October 2010 HMA-FO Task 2: Feasibility Analysis Service Schedule 1/2

4 05 October 2010 HMA-FO Task 2: Feasibility Analysis Service Schedule 2/2

5 05 October 2010 HMA-FO Task 2: Feasibility Analysis Service Proposal Information: List of Documentation Deliverables

6 05 October 2010 HMA-FO Task 2: Feasibility Analysis Service Proposal Information: List of Software Deliverables

7 05 October 2010 HMA-FO Task 2: Feasibility Analysis Service Work in Progress: SWE Common 2.0 (dependencies of SPS 2.0)  Status  Final version of SWE Common Data Model standard under final adoption at the TC. Vote scheduled to end November 16 th  Final version of SWE Common Service Model presented by iGSI during last TC in Toulouse  Next Steps for SWE Service Model  Proof reading period of a week (starting after the TC)  Spot Image has read through the whole document and is OK with the latest version  Working Group vote to start on Friday October, 1 st to release the document to the TC for adoption vote If everything goes well SWE Service Model 2.0 should then become an OGC standard before the end of the year.

8 05 October 2010 HMA-FO Task 2: Feasibility Analysis Service Work in Progress: SPS 2.0  Status  Final version presented by iGSI during last TC in Toulouse  Next Steps  Proof reading period of a week (starting after the TC)  Spot Image has read through the whole document and is OK with the latest version  Working Group vote to start on Friday October, 1 st to release the document to the TC for adoption vote If everything goes well SPS 2.0 should then become an OGC standard before the end of the year.

9 05 October 2010 HMA-FO Task 2: Feasibility Analysis Service Work in Progress: EO Extension for SPS 2.0  Status  Public comments period is over since a week. No additional comments were received (Note that OAB initially asked for more time to review the document, but in the end did not wait to approve its release)  Next Steps  Final alignments with SPS 2.0 candidate standard (i.e. as posted to TC)  SWG vote to release to the TC for final adoption vote  Issues  Problem with the reference to the new EO GML schema using GML 3.2.1 produced by Task 1 and for which there is no official OGC doc yet. If issue is resolved and everything else goes well EO SPS 2.0 should then become an OGC standard before end of January 2011.

10 05 October 2010 HMA-FO Task 2: Feasibility Analysis Service Work in Progress: Executable Test Suite  TEAM Engine progress  Frédéric Houble at Erdas provided a version on 20 September  Some bugs remain in this version but it is usable for many tests  ETS Coverage  Many more requirements in the specification than previous version  Some cannot be tested with the current Team Engine  Currently the ETS implements 9 of the 30 core tests  Aim to include almost all of these core tests (ie all the ones which can be done with the TEAM Engine)  Some of the optional Conformance Test Classes will also be covered, in particular those for the new operations in the EO Extension

11 05 October 2010 HMA-FO Task 2: Feasibility Analysis Service Work in Progress: SFRE Documentation  Software Validation Specification  First draft available now.  Updates expected. Still to add:  URLs to uniquely identify the Abstract Test Suite tests (waiting for final EO SPS)  Client based testing of Cancel and Update operations to be finalised (waiting for Client development)  Client based testing of GetSensorAvailability, DescribeSensors and Validate operations to be added (waiting for Client development)  Client based testing of Coverage and Acquisition Orders to be added (waiting for Client development)

12 05 October 2010 HMA-FO Task 2: Feasibility Analysis Service Work in Progress: SFRE Development (SF Client)  Development progress  All the mandatory operations have been successfully implemented:  GetCapabilities  DescribeSensor, DescribeTasking  GetFeasibility, Submit  Cancel, Update  Reserve, Confirm  GetStatus, DescribeResultAccess  The following operations are still under implementation:  GetSensorAvailability  Validate

13 05 October 2010 HMA-FO Task 2: Feasibility Analysis Service Work in Progress: SFRE Development (SF Client)  Development process  The Verification and Validation Test Plan still need to be upgraded with the Cancel, Update, GetSensorAvailability, DescribeSensors and Validate Operations  The Acquisition Order is managed but the Coverage is under implementation  The notification service will not be used, it is replaced by a periodic GetStatus mechanism  Final version of the SFRE Client expected before the end of October  Test Procedures dry run can then happen

14 05 October 2010 HMA-FO Task 2: Feasibility Analysis Service Work in Progress: SFRE Development (SF Server)  Development progress  Functionally complete (ie all operations supported)  Updates based on late specification changes/clarifications being done (eg. new schemas)  Development process  Ongoing Testing:  Executable Test Suite testing ongoing (along with development of ETS)  SF Client based testing has been informally carried out (as per SVS)  Hope for full formal run of SF Client testing at end of October

15 05 October 2010 HMA-FO Task 2: Feasibility Analysis Service Work in Progress: SFRE Development (other)  Development progress  Open Source SPS Library and Notifications Library completed  Had planned to have 2 additional demo environments:  Optical: Spot Image SPS EO Server - nearly completed  Radar: Astrium SPS EO Server - not going to be developed now  Development process  Spot Image SPS EO Server should be deployed by the end of the week (2010-10-08)  Will use as a target for Executable Test Suite during development


Download ppt "05 October 2010 HMA-FO Task 2: Feasibility Analysis Service HMA Follow On Activities Task 2: Feasibility Analysis Service (Sensor Planning Service) Monthly."