1 1 UK Project Finance & Schedule

2 Overview Finance  Budget Setting 2013/14  June Finance  Forward look to complete stepVI Schedule  Overview 2

3 Budget Setting for FY 2013/14 – OsC April 3 This budget has been revised downwards yet still allows delivery of all major items & infrastructure for step IV operation. Staff costs have been reduced in the following work packages:  Project management office  Hydrogen system  Operations & Analysis – management and systems experts Fixed costs reduced in the following:-  Hydrogen System  Operations & Analysis Options are being considered to reduce this overspend of 7.4%

4 Budget for FY 2013/14 – Saving Option 1 4 Saving Option 1 Don’t build the new rack and control room  Disadvantages  Worked for some considerably time to get agreement from ISIS for this not to go forward this yr  Cooling Channel Control Racks will have to go behind North wall for step IV then re-routed to the new rack room for step VI. Effectively doing the electrical installation twice  Staff morale will be low Staff costs have been reduced further in the following work packages:  Project management office  Hydrogen system This option reduces overspend to 1.9% OsC last mtg advised that agreement with ISIS for this space was a priority

5 5 Budget for FY 2013/14 – Saving Option 2 Saving Option 2 Cease work on RF work package – Plan to miss the TIARA milestone  Disadvantages  TIARA income of £35k this yr until end December to demonstrate RF power operational in MICE hall. Would not be able to use this income.  Damaged reputation of STFC Staff costs have been reduced further in the following work packages:  Project management office  Hydrogen system This option reduces overspend to 4.7%

6 MICE Finance – June 6 Income:- External Common Fund:- £88k TIARA - £33.75k EUCard:- Assumed same as last yr £34k Encumbrances:- £48k Negative Variance £139k When setting budget projected overspend was £134 – 3 months in we are where we think we should be Was agreed we could run with this overspend and review in October Staff OTL bookings being monitored

7 Forward Look Spend to Step VI 7 Assumes flat cash allocation Some levelling still to do for 2017/18 onwards Proposed delivery date of RFCC#2 means an allocation will be required in 2019/20

8 Schedule Overview Base level schedule that is – racks are installed behind North wall. Infrastructure work to move compressors to west wall included all compressors installed on West Mezzanine – compressors not installed till Feb 2014. SS’s & Tracker’s assembled in R9 then moved to MICE Hall. Magnet training of SS begins after cooling channel is installed (this includes EMR, KL & TOF) 15 weeks total for all magnet training after cooling channel is installed. Schedule shows Step IV completion now December 2014 – ‘This is work in Progress’ Spectrometer Solenoids & Trackers, installed in series due to limited resources. No return yoke installation shielding considered at this point 8

9 RF Success 9 After many set backs the RF project team has operated the TH116 at 2MW at Daresbury – a major milestone for MICE & TIARA