Presentation is loading. Please wait.

Presentation is loading. Please wait.

Meet the Team EBP Contract Project Coordinator - Raj Randhawa - Freddie McCann REED Contract Project Coordinator - Jamie Bather.

Similar presentations


Presentation on theme: "Meet the Team EBP Contract Project Coordinator - Raj Randhawa - Freddie McCann REED Contract Project Coordinator - Jamie Bather."— Presentation transcript:

1

2 Meet the Team EBP Contract Project Coordinator - Raj Randhawa - Freddie McCann REED Contract Project Coordinator - Jamie Bather

3 Phase 1: Residential Date: Monday 25 th July- Friday 29 th July Manor Adventure, Station Rd, Llanwrtyd Wells LD5 4RR 01591 610250 Travel Plan Team Building Personal Development Positive Experiences We will advise if there are traffic delays on the day. Please check your phones.

4 Phase 1: Residential Activities Include: Zip Wire Abseiling Archery Canoeing Raft Building High Ropes Rock Climbing Kayaking

5 Kit List Nightwear x 1 Sleeping Bag & Pillow Underwear x 7 Socks (over ankle length) x 7 2 x more fleeces/sweatshirts 3 x T-shirts 1 x Long sleeved T-shirt 3 x pairs of old trousers (not jeans)

6 Kit List 1 pair of shoes/trainers for indoors Waterproof Jacket Baseball Cap/Hat Swimwear 1 set of dry clothing Wash Bag and Towel Sun Cream (+20 SPF)

7 Kit List (Optional) Torch and Batteries Plastic Bottle for Drinks Small Bag/Rucksack Labelled plastic bags for wet items (Drying rooms on site) Please make sure that clothing is suitable for outdoor activity. MK Dons cannot be held liable for any loss, damage or theft to goods or clothing so please ensure any clothes worn are acceptable for the activity

8 Kit List – Do NOT Bring Alcohol Weapons Excessive amounts of cash (£20 max) Games consoles

9 Phase 2: Home Residential Date: Monday 1 st August- Friday 5 th August Location: Bedford University, Liberty Park, Polhill Ave, Bedford MK41 9BD Arrive at venue 10:30am and meet staff there Personal Development Get to know about their community Organisation visits to host workshops

10 Phase 3 Social Action Project Planning Date: Monday 8 th August- Friday 12 th August (10:00- 16:00) Where: Stadium MK Team work Communication and organisation skills Put ideas together for social action project Putting skills developed throughout the programme into action Making a difference

11 Phase 4: Social Action Project Delivery Date: Friday 12 th – Friday 2 nd September 10 Hours of Planning Teams begin to plan projects Take responsibility for success Work with Team Leaders 20 Hours of Delivery Delivery of SAP

12 Previous Examples of Social Action Projects Stop Motion Video Community Days SRTRC Music Video Artbeat MK – Culture Walk Football Tournament http://m.youtube.com/watch?v=dT1Wr01wf- o&feature=youtu.be Renovation Projects Local Events Media Creation #Trends (StopTheStigma)

13 Graduation Ceremony Thursday 1 st September (Part 1) stadium mk Chance to showcase hard work this Summer VIP Guest appearances Invite all your friends and family Date TBC Part 2 A free match day ticket for Graduates to watch an MK Dons match.

14 Deal Breakers “any issue or factor that is significant enough to terminate a negotiation, esp. in business or politics”

15 NCS Deal Breakers Drugs Alcohol Sex Racism Bullying Weapons Gangs

16 Expectations - Respect Smoking Bad Language Mobile Phone Abusive Behaviour

17 Contact Details Jamie Bather – NCS Coordinator Email: jamie.bather@mkdonsset.comjamie.bather@mkdonsset.com Tel: 01908 622883Mobile: 07515 050678 Freddie McCann – NCS Coordinator Email: freddie.mccann@mkdonsset.comfreddie.mccann@mkdonsset.com Tel: 01908 622883 Mobile: 07816 860684

18 Emergency Home Contact Contact to be used during the Residential Trips Angela Novell – Director of Education Email: angela.novell@mkdonsset.comangela.novell@mkdonsset.com Tel: 01908 622893 Mobile: 07584 706247


Download ppt "Meet the Team EBP Contract Project Coordinator - Raj Randhawa - Freddie McCann REED Contract Project Coordinator - Jamie Bather."

Similar presentations


Ads by Google