Town of Mountain Village Lighting Projects. ICAST Mission To provide economic, environmental, and social benefits to communities in a way that builds.

Similar presentations


Presentation on theme: "Town of Mountain Village Lighting Projects. ICAST Mission To provide economic, environmental, and social benefits to communities in a way that builds."— Presentation transcript:

1 Town of Mountain Village Lighting Projects

2 ICAST Mission To provide economic, environmental, and social benefits to communities in a way that builds local capacity Environmental Stewardship Economic Development Social Responsibility

3 WHY??

4 Why Change? Electric lighting accounts for as much 20-38% in an average commercial building. Lighting costs can be reduced by 50-75% by selecting lights that use energy more efficiently, and by installing simple lighting controls such as dimmers and occupancy sensors where appropriate. Replacing incandescent bulbs with Light Emitting Diodes (LED’s) are excellent ways to reduce energy consumption.

5

6 Lighting Assessments Gondola Parking Garage Heritage Parking Garage Town Hall Parking Lot Gondola Stations Street Lighting Plaza Lighting VCA Lighting

7 How much light do you need? There are light levels that represent the Illuminating Engineer Society’s (IES) current illumination recommendations. The levels are based on a unit of measure called foot candles (fc) or lux (lx). This rating quantifies how much light is in an area. Individual applications will determine exact foot- candle levels.

8 Photometrics Specific measurements to design the correct lighting recommendations specific to that facility.

9 How much light do you need?

10 Town Hall Parking Current lighting Current HID Lighting Current LED No Lighting

11 What Color is this car? Parking Garages

12 Gondola Garage Photometrics We will be adding a wall pack for the stairs

13 Gondola Parking Garage Problems: 1.Reducing Light Pollution 2.Reducing Waste/Saving Energy Solutions: 1.10 year warranty 2.80 tons of CO gasses saved 3.Reduced light pollution and improved light 4.120,700 kWh Saved Annually 5.Potential $1,800 Maintenance savings 6.Payback/ROI: 2.7yrs

14 Current LED Testing

15 Heritage Garage Photometrics

16 Heritage Parking Garage Problems: 1.Maintenance Costs 2.Reducing Waste/Saving Energy Solutions: 1.10 year warranty 2.121 tons of CO gasses saved 3.Improved lighting consistency 4.182,734 kWh Saved Annually 5.Potential $1,800 Maintenance savings 6.Payback/ROI: 1.7yrs

17

18 Town Hall/Street Lights/Plaza Lights Problems: 1.Maintenance Costs 2.Color of Lighting for Customers/Residents 3.Reducing Waste and Consumption Solutions: 1.10 year Warranty 2.DynaDimmer Controls=added energy savings 3.Warm color of lighting throughout 4.Retrofit doesn't change look of fixture 5.Potential $1200 Maintenance savings 6.Payback/ROI: 8.2 (Lamps, Fixtures, Dimmers) 7.89,878 kWh per year saved

19 Town Hall/Street Lights/Plaza Lights No Spread Straight Down Current LED’s are Directional

20 Current Lighting No Changes to current style

21 High Pressure Sodium vs. LED Retrofit

22 Village Court Apartments Problems: 1.Reducing Light Pollution 2.Reducing Waste/Saving Energy 3.Color of Lighting for Residents Solutions: 1.10 year warranty 2.4 tons of CO gasses saved 3.Reduced light pollution and improved light 4.6,281 kWh Saved Annually 5.Potential $83 Maintenance savings 6.Payback/ROI: 8.2yrs

23 Gondola Stations Problems: 1.Reducing Light Pollution 2.Reducing Waste/Saving Energy 3.Color of Lighting for Customers Solutions: 1.105 tons of CO gasses saved 2.Reduced light pollution and improved light 3.159,432 kWh Saved Annually 4.Potential $728 Maintenance savings 5.Payback/ROI: 1.6yrs

24 Gondola LED Lighting

25

26 Total Project Summary  $302,809 project cost without rebates.  $95,016 Energy saving per year in Electricity.  3.2 years ROI/Payback.  558,919 kWh of Energy saved per year.  369 Tons of Carbon saved per year.  Potential $5,000.00 maintenance savings on lamps alone - no labor or ballast included.  Gives you Full Dimming Control of street and plaza lighting. 10 to 100% anytime, anywhere.

27 Total Project Summary Annual Energy Savings Area to Improve Estimated Installed Cost Estimated EE Annual Savings Simple Payback (in years) kWhKW Carbon- CO 2 (tons) Heritage Parking Garage$60,060$31,0651.9 182,73420.86121 Gondola Parking Garage $55,153$20,5162.7 120,68215.6580 Town Hall$7,384$8418.8 4,9491.133 Plaza$37,413$4,3018.7 25,2995.7817 Street & Pathways$88,128$10,1228.7 59,54213.5939 VCA Exterior Lighting$9,393$1,0688.8 6,2811.434 Gondola Stations $45,279$27,1031.7 159,43218.2105 TOTAL Project$302,809$95,0163.2 558,91976.64369

28 Next Steps-Timelines 1.Review SOW and then sign SOW – 2 weeks 2.SMPA – review SOW for custom rebates – 2 weeks 3.Bid work to contractors – 2 weeks 4.Review and sign final contract – 2 weeks 5.Schedule work to begin – 1 week 6.Complete work – all phases with inspections – 4-8 weeks (TBD)

29 Next Steps 1.What questions do you have? 2.SOW needs to be signed as a trigger point. 3.Approve contractors with you. 4.SOW will go to SMPA for custom rebate process/approval ASAP – following signing SOW. 5.Which of these seven projects do you want to start first? 6.What is the start date for implementation? How soon do you want to start/complete this project?

30 Thanks! Brian Firestone Business Development Executive brianf@icastusa.org 303-842-2537 http://www.resourcesmart.org/