CITY OF GLENDALE, CA October 17, 2015 SAFE ROUTES TO SCHOOL – PHASE 3 PROGRAM IMPROVEMENT S ADJACENT TO BENJAMIIN FRANKLIN ELEMENTARY SCHOOL.

Similar presentations


Presentation on theme: "CITY OF GLENDALE, CA October 17, 2015 SAFE ROUTES TO SCHOOL – PHASE 3 PROGRAM IMPROVEMENT S ADJACENT TO BENJAMIIN FRANKLIN ELEMENTARY SCHOOL."— Presentation transcript:

1 CITY OF GLENDALE, CA October 17, 2015 SAFE ROUTES TO SCHOOL – PHASE 3 PROGRAM IMPROVEMENT S ADJACENT TO BENJAMIIN FRANKLIN ELEMENTARY SCHOOL

2 Goals of the Safe Routes to School Program (SRTS) Reduce injuries and fatalities to school children. Enhance the safety of the pathways, trails, sidewalks and crossings to attract and encourage other students to walk and bike to school.

3 NAMES OF THE SCHOOLS SRTS Phase 3 School Locations: Benjamin Franklin Elementary School Cerritos Elementary School Chamilian Armenian School Thomas Edison Elementary School Valley View Elementary School

4 PROJECT LOCATION MAP

5 SCOPE OF WORK Modification of curb return and Installation of bulb outs and curb ramps

6 SCOPE OF WORK Widen Winchester to create a drop off zone for the students

7 SCOPE OF WORK Install traffic circles at Justin/Garden St & Justin/Randall St. Intersections

8 SCOPE OF WORK Install new sidewalk on Randall Street and Justin Ave

9 SCOPE OF WORK Fill the parkway on South side of Lake Street between Winchester and Justin and North side of Randall between Winchester and Justin with Concrete. Remove existing six street trees on Winchester and planting new trees. Reconstruction/Resurfacing of existing pavement at select intersections.

10 SIGNING AND STRIPING Install New Signing and Striping to Comply with New CALTRANS Standards SCOPE OF WORK New Pavement Markings, Lane Lines, Curb Markings, Retro-reflective Pavement Markings Installation of New Fluorescent and High Intensity Signing for Improved visibility

11 ANTICIPATED CONSTRUCTION START DATE: June 2016 PROJECT DURATION: 90 Working Days barring any unforeseen conditions SAFE ROUTES TO SCHOOLS – PHASE 3 PROGRAM IMPROVEMENTS ADJACENT TO BENJAMIN FRANKLIN ELEMENTARY SCHOOL

12 Public Notification Process Community Meeting Director of Public Works’ Letter Contractor’s Notification Letter (1-2 weeks prior) Project Signs 3-Day Door Hanger (Grinding/ Paving) Driveway Closures Website Updates

13 This PowerPoint presentation will be available for viewing at : http://www.glendaleca.gov/government/departments/ public-works/projects/safe-routes-to-school-phase-3 The project-dedicated webpage includes project updates and other information.


Download ppt "CITY OF GLENDALE, CA October 17, 2015 SAFE ROUTES TO SCHOOL – PHASE 3 PROGRAM IMPROVEMENT S ADJACENT TO BENJAMIIN FRANKLIN ELEMENTARY SCHOOL."