Presentation is loading. Please wait.

Presentation is loading. Please wait.

UNCLASSIFIED 1 JCA Status Update to WJTSC 09-2 24-28 August 2009 Joint Staff J-7, JFDID.

Similar presentations


Presentation on theme: "UNCLASSIFIED 1 JCA Status Update to WJTSC 09-2 24-28 August 2009 Joint Staff J-7, JFDID."— Presentation transcript:

1 UNCLASSIFIED 1 JCA Status Update to WJTSC 09-2 24-28 August 2009 Joint Staff J-7, JFDID

2 UNCLASSIFIED 2 JCA WG Agenda Time Topic/Subject Briefer 1300 – 1310Welcome Remarks LtCol Larry Miller 1310 – 1330JCA Status Update Brief LtCol Larry Miller Mr. Steve Brown 1330 – 1420UJTL / JCA Mapping, Staffing & JCAMS Staffing Tool Mr. Steve Brown 1430 – 1530UJTL / JCA Mapping & Readiness Mr. Steve Brown 1530 – 1600Questions LtCol Larry Miller Mr. Steve Brown

3 UNCLASSIFIED 3 Acquisition and Requirements Reform – 9 Apr 09 Secretary Gate’s response to a President’s Tank Session question regarding Acquisition Reform

4 OP 3.2.1 Provide Close Air Spt Integ for Surface Forces OP 3.2.6 Provide Firepower in Support of Opnl Maneuver OP 3.2 Attack Opnl Targets Non-Kinetic Means Kinetic Means NTA 3.2.8 Conduct Fire Spt ART 3.3.1.1 Conduct Surface-to-surface Atk MCTL 3.4.1.4 Coord Naval Surface Fire Spt AFT 4.2.1.2 Conduct Close Air Spt NTA 3.2.8 Conduct Fire Spt ART 3.3.1.2.2 Employ Close Air Spt MCTL 3.2.2 Employ Close Air Spt UJTL Tasks JCA Tiers 1 - 3 Engagement AV-8B F/A-18 Sqdn A-10 Sqdn F-16 Sqdn B-52 Sqdn MCTL 3.2 Conduct Indirect Fires DDG-51 155mm SP Bn GMLRS Unitary 155mm SP Bn 120 mm Mtr Plt Units / Platforms Programs F/A-22 Sqdn F-35 Sqdn Excaliber 5"/62 Gun/ ERGM Programs Capability to Task Linkage Service Tasks Maneuver Force Application Fixed Target Stationary Target Moving Target ST 3.2 Attack Theater Strat Targets JCA Tier 4 and below

5 UNCLASSIFIED 5 Way Forward –UJTL to JCA mapping (staffing in early Sept) –Joint Capabilities Requirement Manager (JCRM) integration –Adaptive Planning integration (APEX) –Readiness Reporting Chairman’s Readiness System DRRS Conversion –JCAMS Spiral 3 Where JCAs are Going

6 UNCLASSIFIED Joint Requirements Code (JRC)

7 UNCLASSIFIED 7 Proposal: Map the JCAs to the JRC JCA Tier 1 Logistics JCA Tier 2 Engineering JCA Tier 3 General Engineering Combat Engineering Geospatial Engineering

8 JCA Tier 1 Logistics JCA Tier 2 Engineering JCA Tier 3 Capability Search

9 JCA Tier 1 Logistics JCA Tier 2 Engineering JCA Tier 3 Capability Search

10 UNCLASSIFIED10 APEX Organizing Framework Situation Awareness PlanningExecution C2 Operational Activities Understand Organize, Planning, Decide Direct, Monitor Global Force ManagementIntelligence LogisticsInteragency Lead JCA Key X-Functional Capabilities Use JCAs / UJTLs to describe required capabilities MultinationalCorporate Management & Support

11 UNCLASSIFIED 11 UNCLASSIFIED JCAMS http://www.dtic.mil/futurejointwarfare/cap_areas.htm

12 UNCLASSIFIED 12 UNCLASSIFIED JCA Timeline Jan 10 Jan 09 Jul 09 12 Jan 09 JCA Refinement Tiers 1 – 7 approved Initial UJTL to JCA Mapping Completed Socialize Mapping Jul – Aug JS 136 Staffing Sep - Oct JCA Review Sep - Dec Svc Task to JCA Mapping JCA – JCRM Integration JCA – DRRS/CRS Integration

13 UNCLASSIFIED 13 UNCLASSIFIED JCAMP Approval JCAMS on SIPR Broadly Worded UJTs Service and Agency Task Mapping Alignment with other Architectures JCA Issues


Download ppt "UNCLASSIFIED 1 JCA Status Update to WJTSC 09-2 24-28 August 2009 Joint Staff J-7, JFDID."

Similar presentations


Ads by Google