N. Dixon PH / DT Vladimir Elsha JINR Straw working group meeting Monday 6th April 2011 CERN1 Straw Material and development.

Similar presentations


Presentation on theme: "N. Dixon PH / DT Vladimir Elsha JINR Straw working group meeting Monday 6th April 2011 CERN1 Straw Material and development."— Presentation transcript:

1 N. Dixon PH / DT Vladimir Elsha JINR Straw working group meeting Monday 6th April 2011 CERN1 Straw Material and development.

2 N. Dixon PH / DT Vladimir Elsha JINR Straw working group meeting Monday 6th April 2011 CERN2 Latest news on Material. Pressure storage. Straws for assembly.

3 N. Dixon PH / DT Vladimir Elsha JINR Straw working group meeting Monday 6th April 2011 CERN3 Coated Material at CERN Coating of remaining PET material to be planned for 2011 spool referencelength in metresCoated lengthSlitting@ PuetzLocationDate komm Nr193568 colours show packaging grouping A1-13320296 Sefar30.11.2010 A1-15320296 Sefar30.11.2010 A1-1320296 Sefar5.04.2011 A1-2320296 JINR28.03.2011 A1-3320296 Sefar28.03.2011 A1-4320296 JINR5.04.2011 A1-5320296 Sefar28.03.2011 A1-6320296 Sefar25.02.2011 A1-14320296 Sefar24.01.2011 A1-16320296 Sefar24.01.2011 A1-9320296 JINR14.12.2010 A1-11320296 JINR14.12.2010 A1-17320296 JINR14.12.2010 A1-7210 Maud10.12.2010 A1-8320296 JINR08.02.2011 A1-10320296 JINR08.02.2011 A1-12320296 JINR08.02.2011 A1-18320296 JINR08.02.2011

4 N. Dixon PH / DT Vladimir Elsha JINR Straw working group meeting Monday 6th April 2011 CERN4 Quality Control Permeation: (Effect of the weld; ongoing, 2 measurements remain) Problems with the device. Ultrasonic welds. RNK 2600 straws produced by both JINR and Sefar investigated by Livio de Carlo (See presentation)

5 N. Dixon PH / DT Vladimir Elsha JINR Straw working group meeting Monday 6th April 2011 CERN5 Future coating and deliveries Coating is scheduled at Fraunhofer FEP in week 17 (26 April) All material will be coated with an option for an extra 300 metres. To be coated: 5 x 300 metres length, this gives 18 x 5 spools (90 spools) JINR 75 – 85 straws per spool. (6750 – 7650 straws ) Sefar 100 straws per spool. (9000 straws) Option for 1350 – 1800 extra tubes. Slitting week 18 in Puetz Folien. CERN week 19 (9 May 2011)

6 N. Dixon PH / DT Vladimir Elsha JINR Straw working group meeting Monday 6th April 2011 CERN6 Current CERN straw status Straw ultrasonic welding. Sefar supplied straws (March 2011) under storage at CERN. (under Pressure) 80 straws under pressure ( 16 days only ) 1 damaged in manipulation 7 small leaks at “O” ring 40 under pressure ready for measurement today, 40 with valves ready for 3 bar (absolute) test. 90 to have valves fitted.

7 N. Dixon PH / DT Vladimir Elsha JINR Straw working group meeting Monday 6th April 2011 CERN7 Straw news Straw ultrasonic welding. A contract is in place with Sefar for 750 tubes to be delivered in batches, starting April 2009. JINR have produced over 500 tubes, 190 of which are fitted with CERN type storage valves. Delivery expected April 2011

8 N. Dixon PH / DT Vladimir Elsha JINR Straw working group meeting Monday 6th April 2011 CERN8 Ongoing at CERN. Pressurised straws being measured JINR lab technicians running the pressure tests

9 N. Dixon PH / DT Vladimir Elsha JINR Straw working group meeting Monday 6th April 2011 CERN9 Ongoing at CERN. Straws with valves glued Straws prepared by JINR lab technicians.

10 N. Dixon PH / DT Vladimir Elsha JINR Straw working group meeting Monday 6th April 2011 CERN10 JINR straws Pictures taken during our last visit show good progress in straw manufacturing. Straw storage in JINR 30 April 2011

11 N. Dixon PH / DT Vladimir Elsha JINR Straw working group meeting Monday 6th April 2011 CERN11 JINR straws Pictures taken during our last visit show good progress in straw manufacturing. JINR straw pre-storage and production.

12 N. Dixon PH / DT Vladimir Elsha JINR Straw working group meeting Monday 6th April 2011 CERN12 Conclusions: 12 Straws expected from: JINR and Sefar from April onwards. The straw process is now in full production. Coating of next batch of RNK in week 17.

13 N. Dixon PH / DT Vladimir Elsha JINR Straw working group meeting Monday 6th April 2011 CERN13 Straw long term pressure test Since last presentation 3 gases in 9 tubes (56 days)


Download ppt "N. Dixon PH / DT Vladimir Elsha JINR Straw working group meeting Monday 6th April 2011 CERN1 Straw Material and development."