Presentation is loading. Please wait.

Presentation is loading. Please wait.

Fermilab: Introduction Young-Kee Kim DOE KA12 (Electron Research)Review June 22-23, 2010.

Similar presentations


Presentation on theme: "Fermilab: Introduction Young-Kee Kim DOE KA12 (Electron Research)Review June 22-23, 2010."— Presentation transcript:

1 Fermilab: Introduction Young-Kee Kim DOE KA12 (Electron Research)Review June 22-23, 2010

2 Fermilab Accelerator Complex Operating Simultaneously Tevatron MINOS MiniBooNE MINERvA Testbeam for Det.R&D SeaQuest Neutron Cancer Therapy DZero CDF 2 SCRF Test Facilities for Project X, ILC, Muon Collider, Accelerator Research Muon Cooling Test Facility Main Injector

3 Fermilab Strategic Plan at the Three Frontiers 3 time Tevatron LHC / LHC Upgrades ILC /  Collider protons technology injector Energy Frontier Det./Phys. Synergy: ILC/CLIC/  Collider (2011) Cosmic Frontier DM DM: CDMS/COUPP/DarkSide (~10 kg  ~100 kg  ~ ton scale) DE DE: (SDSS) DES 4 th gen DE (JDEM…) UHE Cosmic UHE Cosmic: Auger South Auger North (TBD) MINOS NOvA LBNE ( to DUSEL) MINERvA MINERvA (Proton Decay) MiniBooNE MicroBooNE SeaQuest  g-2 Mu2e Muon/Kaon/Nuclear/… NuMI NuMI Project X Factory NuMI NuMI Project X Factory (300kW) (700kW) 2MW (60-120GeV) for Booster +2MW(3GeV)+200kW(8GeV) injector Intensity Frontier (2013) Today’s Topic

4 Lepton Colliders beyond LHC Young-Kee Kim, DOE KA12 Review, 2010-06-22 4 LHC Results ILC Enough ILC not enough CLIC Muon collider or  By far the easiest! E < 1 TeV E > 1 TeV Muon collider “Electron Research (KA12)” Scientists: Generic det R&D for ILC & other applications ILC

5 Muon collider layout Project X upgrade ILC/Project X technology 5 Neutrino Factory Muon Collider 4 TeV Muon Collider Conceptual Layout http://www.fnal.gov/pub/muon_collider/ We very much encourage participation from all regions of the world.

6 6 Young-Kee Kim, DOE KA12 Review, 2010-06-22 4 TeV

7 MAP (Muon Accelerator Program) Initiative US 5 year R&D proposal submitted to DOE DOE’s response to this proposal  Creating a “DOE project management” structure  MAP 7 Young-Kee Kim, DOE KA12 Review, 2010-06-22

8 MAP Organization 8 Young-Kee Kim, DOE KA12 Review, 2010-06-22 * Interim assignments

9 MAP Organization 9 Young-Kee Kim, DOE KA12 Review, 2010-06-22 MuCOOL at FNAL MICE at RAL

10 MAP Proposal Submitted by Oddone on behalf of the MAP collab., on March 1, 2010. 214 participants (at birth) from 14 institutions:  ANL, BNL, FNAL, JLab, LBNL, ORNL, SNAL, Cornell, IIT, Princeton, UCB, UCLA, UCR, U-Miss Briefing to DOE ( Apr, 2010) DOE Review  August 24-26 at FNAL 10 Young-Kee Kim, DOE KA12 Review, 2010-06-22

11 MAP Goals and Deliverables Deliverables in 6-7 years: - Muon Collider Design Feasibility Report (FY16)  Hardware R&D results → technology choice - MC Cost range (FY16) - Also contributions to the IDS-NF RDR (FY14) Will address key R&D issues, including - Maximum RF gradients in magnetic field  Magnet designs for cooling, acceleration, collider  6D cooling section prototype & bench test  Full start-to-end simulations based on technologies in hand, or achievable with a specified R&D program 11 Young-Kee Kim, DOE KA12 Review, 2010-06-22

12 From NFMCC to MAP 12 Young-Kee Kim, DOE KA12 Review, 2010-06-22 NFMCC: Neutrino Factory and Muon Collider Collaboration MCTF: Muon Collider Task Force at Fermilab Last couple of years FY10 FY11 ~4 M$~9 M$~10 M$~15 M$ (proposed) First ~10 years NFMCC MCTF NFMCC + MAP interim MAP (CLIC: ~$30M / year now, and likely will grow)

13 Detector and Physics Muon Collider (NOT included in MAP)  Synergy to ILC / CLIC  1 st workshop in November 2009 ILC/CLIC community included  2 nd workshop planned in late Fall 2010 Understanding muons  Neutrino Factory – Synergy to LBNE  Current accelerator complex (Mu2e, muon g-2)  Project X (muon programs) Young-Kee Kim, DOE KA12 Review, 2010-06-22 13

14 Laboratory white paper on lepton colliders Goal:  Although lepton collider options have very different levels of maturity and operational conditions, we believe that broad physics goals are similar and we need an objective physics comparison of the options in a coherent, efficient, and cost effective manner (presented by David MacFarlane) Meetings  First meeting (5 labs + DOE:Glen Crawford) on Apr 27, 2010, Sendai, Japan during the 32 nd meeting of the US-Japan Committee meeting for Cooperation in HEP  5-lab conference call on May 4, 2010  Email communication Young-Kee Kim, DOE KA12 Review, 2010-06-22 14

15 Laboratory white paper on lepton colliders Communication with the ILC & university community about the white paper  ILCSCA chair (Maury Tigner), ILC Physics and Detectors: America’s regional contact (Jim Brau), DPF chair (Chip Brock) in May, 2010  Also sent the white paper to them Developing a national strategy for lepton colliders  Plan to discuss in the detector R&D workshop at Fermilab on Oct 7-9, organized by 5 labs and DPF  Plan to discuss at the next DPF meeting, Spring 2011  Further communication/discussion with ILC community, and ILC US physics and detectors community Young-Kee Kim, DOE KA12 Review, 2010-06-22 15

16 Fermilab Presentations Introduction (10’)  Young-Kee Kim Collider Detector Development (30’)  Marcel Demarteau Muon Collider Backgrounds (20’)  Nikolai Mokhov Summary (10’)  Marcel Demarteau Young-Kee Kim, DOE KA12 Review, 2010-06-22 16


Download ppt "Fermilab: Introduction Young-Kee Kim DOE KA12 (Electron Research)Review June 22-23, 2010."

Similar presentations


Ads by Google