Presentation is loading. Please wait.

Presentation is loading. Please wait.

Collaboration With DTTN 30 Aug 2007. Project Background Project Title An eLogistics Appliance with Data Exchange and Conversion Technologies for Infrastructure.

Similar presentations


Presentation on theme: "Collaboration With DTTN 30 Aug 2007. Project Background Project Title An eLogistics Appliance with Data Exchange and Conversion Technologies for Infrastructure."— Presentation transcript:

1 Collaboration With DTTN 30 Aug 2007

2 Project Background Project Title An eLogistics Appliance with Data Exchange and Conversion Technologies for Infrastructure Connectivity Implementation Schedule 01 Jul 2007 – 31 Dec 2008 Funding Agent Logistics and Supply Chain Management R&D Center

3 Challenges to Meet We target to deal with the following challenges: How can we make the development and maintenance of data mappings easier? How can we make it easier to integrate DTTN with the users’ legacy systems?

4 We Have a Box – B2B Connector, exchanges documents through shared folders The base is built, exchanges documents through shared folders The next challenge is: Building Applications electronic documents Compliance to supported by DTTN Compliance to B2B standards supported by DTTN including ebXML, UBL, and AS2

5 Applications for DTTN

6 Message Conversion Service

7 Message Staging Service

8 More Applications

9 Proposed Next Steps Form a project steering group to Set out project direction Monitor project status Allocate resources Form a joint team to Develop project schedule Confirm requirement on the deliverables Develop pilot cases


Download ppt "Collaboration With DTTN 30 Aug 2007. Project Background Project Title An eLogistics Appliance with Data Exchange and Conversion Technologies for Infrastructure."

Similar presentations


Ads by Google