Santa Rita Wastewater Treatment Plant Alternative Site Investigation Addendum Sawmill Road Site.

Similar presentations


Presentation on theme: "Santa Rita Wastewater Treatment Plant Alternative Site Investigation Addendum Sawmill Road Site."— Presentation transcript:

1 Santa Rita Wastewater Treatment Plant Alternative Site Investigation Addendum Sawmill Road Site

2 Sawmill Road Site Comprised of three privately-owned parcels (Parcels A, B, & C) Located 1.5 miles south of Santa Rita WWTP Total Acreage: 13 acres Floodplain Considerations Usable Acreage: 9.73

3 Sawmill Road Site $19.5 M more than Santa Rita Option Removal two lift stations Proposed Odor Control = to Santa Rita S. Access via two new easements on private property Facilities Remaining at Santa Rita: Raw Water Pump 6.9 acres of usable space at Santa Rita

4

5 Alternative Sawmill Road Site Comprised of four privately-owned parcels (Parcels B, C, D & E ) Configuration does not include Parcel A, but does require an easement to accommodate conveyance Located 1.5 miles south of Santa Rita WWTP Total Acreage: 13.36 acres Floodplain Considerations Usable Acreage: 9.89

6 Alternative Sawmill Road Site $18.9 M more than Santa Rita Option Removal one lift stations Proposed Odor Control = to Santa Rita Facilities Remaining at Santa Rita: Raw Water Pump, Headworks, Odor Control, Emergency Storage 4.6 acres of usable space at Santa Rita

7

8 Conveyance: Alignment SI

9 Conveyance: Alignment S2

10 Timeline 4 to 6 years.

11 Access to the Draft Report http://durangogov.org/index.aspx?NID=904 Alternative Site Investigation: WWTP


Download ppt "Santa Rita Wastewater Treatment Plant Alternative Site Investigation Addendum Sawmill Road Site."