1 Mike Andrews May 10, 2013

2 Week 54 NuMI Activities Initial test controls on the MI65 RAW exchange skid Complete hydrostatic test of the MI65 exchange skid system Complete Target elevation survey Target in chase with shielding platform in place (Monday) Move shielding platform sections to surface storage Connect & QA all water/gas/instrumentation lines Install spool pieces in beamline & place under vacuum Connect water to MI quad magnets & install Q117 cooling plates Clean Support Rooms, Pre Target, Target Hall drain system, drip ceilings, floors, & magnets Install electrical support for LBNE Muon Monitor prototype infrastructure in Absorber Passageway Install electrical support for AH air compressor adjacent to shaft Hook up & test the Multiwires in the Pre Target

3 NuMI Target RAW Lines

4 NuMI Beamline

5 Next Weeks Activities Controls & instrumentation testing MI65 exchange skid system controls Commission Target RAW system Install data racks for Muon Monitor in Alcove 4 Install electrical support for PPD Muon Monitor prototype infrastructure in Alcove 4 Clean NuMI Decay Pipe & Absorber Hall drainage system Complete PM’s on Target Hall & chase dehumidification system Order two new pumps for Target RAW skid & new pressure transmitter for Horn 2 spray lines Install new chase humidity & temperature sensor

6 NoVA Detector Hall Project Kiewit Construction site activities Status of work 97% of the Project is complete Completed water mist fire protection system testing Demobilization of the yard & office areas Fabrication of Detector Hall rails & work deck Continue with installation of block wall at Hall entrances Estimated end date week of May 27

7 NoVA Hall Construction

8 NoVA Far Detector Ash River, MN